Project Details

Search | All Active Projects


File Number
AL257
Project Name
Flying Horse Foundation Riding Academy - Special Use
Description
Administrative Special use for philanthropic institution with horse stables on RR-5 zoned parcel. Special use can be administrative and will require site development plan approval in order to initiate use.
Parcels
5100000291 5100000291 5100000530 5100000530 5100000531 5100000531
Applicant
HR Green Inc.
Phil Stuepfert ( pstuepfert@hrgreen.com )
(630) 220-7936
Phil Stuepfert ( pstuepfert@hrgreen.com )
(630) 220-7936
File Prefix
AL - Special Use
Year
2025
Project Manager
Lacey Dean
Status
Active
Created
12/11/2024 5:07:54 PM

View: Review Comments



Additional Documents (8)

Link Document Comment
View Neighbor Notice & Vicinity Map "Notice of Administrative Decision" letters were mailed by PCD on 03/05/2025. The potential decision can be made after 03/19/2025. JM
View Mailing Labels Mailing Labels for the 18 surrounding property owners. The cost to be billed to the applicant = $12.42 JM
View Selected Range Selected Range was 500 feet. JM
View Neighbor Notice & Vicinity Map "Notice of Administrative Decision" letters were mailed by PCD on 03/12/2025. The potential decision can be made after 03/26/2025. JM
View Mailing Labels Mailing Labels for the 22 surrounding property owners. The cost to be billed to the applicant = $2.76 JM
View Selected Range Selected Range was determined by planning staff. JM
View Returned Notice - 3/17/2025
View Country View Estates Response to PCD File AL257


Review Documents (13)

Link Document Date
View Application/Petition Form 10/1/2025 3:29:31 PM
View Letter of Intent 10/1/2025 3:29:32 PM
View Mineral Rights Certification 9/3/2025 3:08:54 PM
View Septic Application 10/1/2025 3:29:34 PM
View Site Plan Drawing 10/1/2025 3:29:33 PM
View Proof of Utilities 9/3/2025 3:08:56 PM
View Well Permits (if water source is wells) 9/3/2025 3:08:55 PM
View Application Comment Response 10/1/2025 3:29:35 PM
View Letter of Intent Responses 9/3/2025 3:08:58 PM
View LOI Comment Response 10/1/2025 3:29:36 PM
View Public Comments Response Letter 9/3/2025 3:08:59 PM
View Septic Permit Updated 10/2/2025 12:21:38 PM
View Site Plan Drawings Responses 9/3/2025 3:08:58 PM



Events (150)

Date Comment
10/14/2025 3:21:33 PM Request for Review Comments returned by PCD Project Manager
10/14/2025 2:30:59 PM Request for Review Comments email resent for Project Foundation Special Use for review by Catherine McGarvy on behalf of EPC Health Department
10/13/2025 1:35:07 PM Request for Review Comments returned by EPC Health Department
10/10/2025 12:50:35 PM Request for Review Comments returned by Colorado Parks and Wildlife
10/7/2025 8:35:05 AM Request for Review Comments email sent for Project Foundation Special Use for review by Justin Kilgore on behalf of PCD Project Manager
10/7/2025 8:31:13 AM Submission Triaged
10/7/2025 8:10:22 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
10/2/2025 12:21:58 PM Submission received from Applicant
9/30/2025 8:29:11 AM Request for Review Comments returned by PCD Administrative Notice
9/29/2025 2:43:23 PM Submission request sent to Applicant
9/29/2025 2:40:43 PM Request for Review Comments returned by PCD Project Manager
9/29/2025 1:10:46 PM Request for Review Comments returned by PCD Engineering Division
9/26/2025 11:07:18 AM Request for Review Comments returned by Black Forest Fire Protection District
9/23/2025 11:31:01 AM Request for Review Comments returned by Pikes Peak Regional Building Department
9/18/2025 12:01:49 PM Request for Review Comments returned by EPC Environmental Services
9/11/2025 12:30:06 PM Request for Review Comments returned by EPC Stormwater Review
9/9/2025 7:17:34 AM Request for Review Comments returned by Academy SD 20 Building Fund
9/8/2025 1:18:50 PM Request for Review Comments returned by EPC Parks Department
9/8/2025 10:40:52 AM Request for Review Comments email sent for Project Foundation Special Use for review by General Email on behalf of Mountain View Electric Association, Inc.
9/8/2025 10:40:51 AM Request for Review Comments email sent for Project Foundation Special Use for review by Harry Thomas on behalf of El Paso County Conservation Dist
9/8/2025 10:40:50 AM Request for Review Comments email sent for Project Foundation Special Use for review by Oliver Watkins on behalf of El Paso County Conservation Dist
9/8/2025 10:40:49 AM Request for Review Comments email sent for Project Foundation Special Use for review by Katie Miller on behalf of El Paso County Conservation Dist
9/8/2025 10:40:47 AM Request for Review Comments email sent for Project Foundation Special Use for review by Erica Carter on behalf of El Paso County Conservation Dist
9/8/2025 10:40:47 AM Request for Review Comments email sent for Project Foundation Special Use for review by on behalf of El Paso County Conservation Dist
9/8/2025 10:40:45 AM Request for Review Comments email sent for Project Foundation Special Use for review by Mariah Hudson on behalf of El Paso County Conservation Dist
9/8/2025 10:40:44 AM Request for Review Comments email sent for Project Foundation Special Use for review by Cassie Olgren on behalf of El Paso County Conservation Dist
9/8/2025 10:40:43 AM Request for Review Comments email sent for Project Foundation Special Use for review by Billy Richard on behalf of El Paso County Conservation Dist
9/8/2025 10:40:42 AM Request for Review Comments email sent for Project Foundation Special Use for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
9/8/2025 10:40:41 AM Request for Review Comments email sent for Project Foundation Special Use for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
9/8/2025 10:40:40 AM Request for Review Comments email sent for Project Foundation Special Use for review by Bob Swatek on behalf of Black Hills Energy-Aquila
9/8/2025 10:40:39 AM Request for Review Comments email sent for Project Foundation Special Use for review by Adam Magoon on behalf of Black Hills Energy-Aquila
9/8/2025 10:40:38 AM Request for Review Comments email sent for Project Foundation Special Use for review by Cheryl Pixley on behalf of Black Forest Trails Association
9/8/2025 10:40:37 AM Request for Review Comments email sent for Project Foundation Special Use for review by Terry Stokka on behalf of Black Forest Land Use Committee
9/8/2025 10:40:36 AM Request for Review Comments email sent for Project Foundation Special Use for review by Terry Stokka on behalf of Black Forest Land Use Committee
9/8/2025 10:40:35 AM Request for Review Comments email sent for Project Foundation Special Use for review by Rachel Dunn on behalf of Black Forest Fire Protection District
9/8/2025 10:40:34 AM Request for Review Comments email sent for Project Foundation Special Use for review by Michael Alvarado on behalf of Black Forest Fire Protection District
9/8/2025 10:40:33 AM Request for Review Comments email sent for Project Foundation Special Use for review by on behalf of Black Forest Fire Protection District
9/8/2025 10:40:32 AM Request for Review Comments email sent for Project Foundation Special Use for review by Fielding Lucas on behalf of Black Forest Fire Protection District
9/8/2025 10:40:31 AM Request for Review Comments email sent for Project Foundation Special Use for review by Chad Herdt on behalf of Black Forest Fire Protection District
9/8/2025 10:40:30 AM Request for Review Comments email sent for Project Foundation Special Use for review by Tom Gregory on behalf of Academy SD 20 Building Fund
9/8/2025 10:40:28 AM Request for Review Comments email sent for Project Foundation Special Use for review by Donald Smith on behalf of Academy SD 20 Building Fund
9/8/2025 10:40:27 AM Request for Review Comments email sent for Project Foundation Special Use for review by Becky Allan on behalf of Academy SD 20 Building Fund
9/8/2025 10:40:26 AM Request for Review Comments email sent for Project Foundation Special Use for review by on behalf of Pikes Peak Regional Building Department
9/8/2025 10:40:25 AM Request for Review Comments email sent for Project Foundation Special Use for review by Travis Sauder on behalf of Colorado Parks and Wildlife
9/8/2025 10:40:24 AM Request for Review Comments email sent for Project Foundation Special Use for review by Tim Kroening on behalf of Colorado Parks and Wildlife
9/8/2025 10:40:23 AM Request for Review Comments email sent for Project Foundation Special Use for review by Peter Chapman on behalf of Colorado Parks and Wildlife
9/8/2025 10:40:22 AM Request for Review Comments email sent for Project Foundation Special Use for review by Karen Voltura on behalf of Colorado Parks and Wildlife
9/8/2025 10:40:21 AM Request for Review Comments email sent for Project Foundation Special Use for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
9/8/2025 10:40:19 AM Request for Review Comments email sent for Project Foundation Special Use for review by Zachary Jannusch on behalf of EPC Stormwater Review
9/8/2025 10:40:18 AM Request for Review Comments email sent for Project Foundation Special Use for review by Mikayla Hartford on behalf of EPC Stormwater Review
9/8/2025 10:40:17 AM Request for Review Comments email sent for Project Foundation Special Use for review by Glenn Reese on behalf of EPC Stormwater Review
9/8/2025 10:40:16 AM Request for Review Comments email sent for Project Foundation Special Use for review by Christina Prete on behalf of EPC Stormwater Review
9/8/2025 10:40:15 AM Request for Review Comments email sent for Project Foundation Special Use for review by on behalf of EPC Parks Department
9/8/2025 10:40:13 AM Request for Review Comments email sent for Project Foundation Special Use for review by Mike McCarthy on behalf of EPC Health Department
9/8/2025 10:40:12 AM Request for Review Comments email sent for Project Foundation Special Use for review by Catherine McGarvy on behalf of EPC Health Department
9/8/2025 10:40:11 AM Request for Review Comments email sent for Project Foundation Special Use for review by HEAEH LandUse on behalf of EPC Health Department
9/8/2025 10:40:10 AM Request for Review Comments email sent for Project Foundation Special Use for review by Kathy Andrew on behalf of EPC Environmental Services
9/8/2025 10:40:08 AM Request for Review Comments email sent for Project Foundation Special Use for review by Justin Kilgore on behalf of PCD Project Manager
9/8/2025 10:40:07 AM Request for Review Comments email sent for Project Foundation Special Use for review by Gilbert LaForce on behalf of PCD Engineering Division
9/8/2025 10:40:06 AM Request for Review Comments email sent for Project Foundation Special Use for review by Engineering Manager on behalf of PCD Engineering Division
9/8/2025 10:40:03 AM Request for Review Comments email sent for Project Foundation Special Use for review by on behalf of PCD Administrative Notice
9/8/2025 10:38:41 AM Project reopened for Review Comments
9/4/2025 1:24:17 PM Submission Triaged
9/3/2025 3:09:07 PM Submission received from Applicant
9/3/2025 1:42:46 PM Submission request sent to Applicant
6/12/2025 12:48:56 PM Project Ready for Approval requests. Review Comment period is complete.
6/12/2025 12:43:15 PM Request for Review Comments returned by PCD Project Manager
6/11/2025 5:02:45 PM Request for Review Comments email sent for Project Foundation Special Use for review by Justin Kilgore on behalf of PCD Project Manager
6/11/2025 4:59:32 PM Submission Triaged
6/11/2025 11:01:04 AM Submission received from Applicant
6/10/2025 10:29:16 AM Submission request sent to Applicant
6/10/2025 10:27:36 AM Request for Review Comments returned by PCD Project Manager
6/9/2025 9:02:46 AM Request for Review Comments email sent for Project Foundation Special Use for review by Justin Kilgore on behalf of PCD Project Manager
6/9/2025 8:58:57 AM Submission Triaged
6/6/2025 9:07:17 AM Submission received from Applicant
5/22/2025 3:49:44 PM Project Manager Assigned: Lacey Dean
5/8/2025 11:34:01 AM Submission request sent to Applicant
5/8/2025 11:33:26 AM Request for Review Comments returned by PCD Project Manager
5/7/2025 1:39:04 PM Request for Review Comments returned by PCD Engineering Division
4/28/2025 9:52:10 AM Request for Review Comments returned by EPC Stormwater Review
4/24/2025 12:27:53 PM Request for Review Comments email sent for Project Foundation Special Use for review by Zachary Jannusch on behalf of EPC Stormwater Review
4/24/2025 12:27:52 PM Request for Review Comments email sent for Project Foundation Special Use for review by Mikayla Hartford on behalf of EPC Stormwater Review
4/24/2025 12:27:51 PM Request for Review Comments email sent for Project Foundation Special Use for review by Glenn Reese on behalf of EPC Stormwater Review
4/24/2025 12:27:50 PM Request for Review Comments email sent for Project Foundation Special Use for review by Christina Prete on behalf of EPC Stormwater Review
4/24/2025 12:27:49 PM Request for Review Comments email sent for Project Foundation Special Use for review by Justin Kilgore on behalf of PCD Project Manager
4/24/2025 12:27:47 PM Request for Review Comments email sent for Project Foundation Special Use for review by Gilbert LaForce on behalf of PCD Engineering Division
4/24/2025 12:27:46 PM Request for Review Comments email sent for Project Foundation Special Use for review by Engineering Manager on behalf of PCD Engineering Division
4/24/2025 12:26:15 PM Submission Triaged
4/23/2025 4:19:42 PM Submission received from Applicant
4/18/2025 2:39:04 PM Submission request sent to Applicant
4/6/2025 6:36:05 AM Request for Review Comments returned by Black Forest Fire Protection District
4/5/2025 9:31:26 PM Request for Review Comments returned by EPC Health Department
3/31/2025 2:52:22 PM Request for Review Comments returned by Black Forest Land Use Committee
3/20/2025 1:24:49 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
3/19/2025 9:14:00 AM Submission request sent to Applicant
3/19/2025 9:12:58 AM Request for Review Comments returned by PCD Project Manager
3/18/2025 4:25:06 PM Request for Review Comments returned by PCD Engineering Division
3/12/2025 12:54:41 PM Request for Review Comments returned by EPC Parks Department
3/11/2025 1:05:46 PM Request for Review Comments returned by EPC Stormwater Review
3/6/2025 3:36:06 PM Request for Review Comments returned by Pikes Peak Regional Building Department
3/6/2025 2:25:00 PM Request for Review Comments returned by Colorado Parks and Wildlife
3/6/2025 12:09:13 PM Request for Review Comments returned by EPC Environmental Services
3/5/2025 10:10:01 AM Request for Review Comments returned by PCD Administrative Notice
3/5/2025 7:39:55 AM Request for Review Comments returned by Academy SD 20 Building Fund
3/4/2025 1:57:12 PM Request for Review Comments email sent for Project Foundation Special Use for review by General Email on behalf of Mountain View Electric Association, Inc.
3/4/2025 1:57:11 PM Request for Review Comments email sent for Project Foundation Special Use for review by Harry Thomas on behalf of El Paso County Conservation Dist
3/4/2025 1:57:10 PM Request for Review Comments email sent for Project Foundation Special Use for review by Oliver Watkins on behalf of El Paso County Conservation Dist
3/4/2025 1:57:09 PM Request for Review Comments email sent for Project Foundation Special Use for review by Katie Miller on behalf of El Paso County Conservation Dist
3/4/2025 1:57:08 PM Request for Review Comments email sent for Project Foundation Special Use for review by Erica Carter on behalf of El Paso County Conservation Dist
3/4/2025 1:57:07 PM Request for Review Comments email sent for Project Foundation Special Use for review by on behalf of El Paso County Conservation Dist
3/4/2025 1:57:06 PM Request for Review Comments email sent for Project Foundation Special Use for review by Mariah Hudson on behalf of El Paso County Conservation Dist
3/4/2025 1:57:05 PM Request for Review Comments email sent for Project Foundation Special Use for review by Cassie Olgren on behalf of El Paso County Conservation Dist
3/4/2025 1:57:04 PM Request for Review Comments email sent for Project Foundation Special Use for review by Billy Richard on behalf of El Paso County Conservation Dist
3/4/2025 1:57:03 PM Request for Review Comments email sent for Project Foundation Special Use for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
3/4/2025 1:57:02 PM Request for Review Comments email sent for Project Foundation Special Use for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
3/4/2025 1:57:01 PM Request for Review Comments email sent for Project Foundation Special Use for review by Bob Swatek on behalf of Black Hills Energy-Aquila
3/4/2025 1:56:59 PM Request for Review Comments email sent for Project Foundation Special Use for review by Adam Magoon on behalf of Black Hills Energy-Aquila
3/4/2025 1:56:58 PM Request for Review Comments email sent for Project Foundation Special Use for review by Cheryl Pixley on behalf of Black Forest Trails Association
3/4/2025 1:56:57 PM Request for Review Comments email sent for Project Foundation Special Use for review by Terry Stokka on behalf of Black Forest Land Use Committee
3/4/2025 1:56:56 PM Request for Review Comments email sent for Project Foundation Special Use for review by Terry Stokka on behalf of Black Forest Land Use Committee
3/4/2025 1:56:55 PM Request for Review Comments email sent for Project Foundation Special Use for review by on behalf of Black Forest Fire Protection District
3/4/2025 1:56:54 PM Request for Review Comments email sent for Project Foundation Special Use for review by Tom Gregory on behalf of Academy SD 20 Building Fund
3/4/2025 1:56:53 PM Request for Review Comments email sent for Project Foundation Special Use for review by Donald Smith on behalf of Academy SD 20 Building Fund
3/4/2025 1:56:52 PM Request for Review Comments email sent for Project Foundation Special Use for review by Becky Allan on behalf of Academy SD 20 Building Fund
3/4/2025 1:56:50 PM Request for Review Comments email sent for Project Foundation Special Use for review by on behalf of Pikes Peak Regional Building Department
3/4/2025 1:56:49 PM Request for Review Comments email sent for Project Foundation Special Use for review by Travis Sauder on behalf of Colorado Parks and Wildlife
3/4/2025 1:56:48 PM Request for Review Comments email sent for Project Foundation Special Use for review by Tim Kroening on behalf of Colorado Parks and Wildlife
3/4/2025 1:56:47 PM Request for Review Comments email sent for Project Foundation Special Use for review by Karen Voltura on behalf of Colorado Parks and Wildlife
3/4/2025 1:56:46 PM Request for Review Comments email sent for Project Foundation Special Use for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
3/4/2025 1:56:45 PM Request for Review Comments email sent for Project Foundation Special Use for review by Mikayla Hartford on behalf of EPC Stormwater Review
3/4/2025 1:56:44 PM Request for Review Comments email sent for Project Foundation Special Use for review by Glenn Reese on behalf of EPC Stormwater Review
3/4/2025 1:56:43 PM Request for Review Comments email sent for Project Foundation Special Use for review by Christina Prete on behalf of EPC Stormwater Review
3/4/2025 1:56:42 PM Request for Review Comments email sent for Project Foundation Special Use for review by on behalf of EPC Parks Department
3/4/2025 1:56:41 PM Request for Review Comments email sent for Project Foundation Special Use for review by Mike McCarthy on behalf of EPC Health Department
3/4/2025 1:56:40 PM Request for Review Comments email sent for Project Foundation Special Use for review by Catherine McGarvy on behalf of EPC Health Department
3/4/2025 1:56:39 PM Request for Review Comments email sent for Project Foundation Special Use for review by HEAEH LandUse on behalf of EPC Health Department
3/4/2025 1:56:37 PM Request for Review Comments email sent for Project Foundation Special Use for review by Kathy Andrew on behalf of EPC Environmental Services
3/4/2025 1:56:36 PM Request for Review Comments email sent for Project Foundation Special Use for review by Justin Kilgore on behalf of PCD Project Manager
3/4/2025 1:56:34 PM Request for Review Comments email sent for Project Foundation Special Use for review by Gilbert LaForce on behalf of PCD Engineering Division
3/4/2025 1:56:33 PM Request for Review Comments email sent for Project Foundation Special Use for review by Engineering Manager on behalf of PCD Engineering Division
3/4/2025 1:56:32 PM Request for Review Comments email sent for Project Foundation Special Use for review by on behalf of PCD Administrative Notice
3/4/2025 12:51:12 PM Project Manager Assigned: Ashlyn Mathy
3/4/2025 12:13:00 PM Fees paid: 3/4/2025 (Receipt: 1010230)
2/25/2025 4:44:44 PM Payment Request sent: 2/25/2025
2/25/2025 4:44:44 PM File # Assigned: AL257
2/25/2025 4:44:37 PM Submission Triaged
2/25/2025 12:26:54 PM Submission received from Applicant
12/13/2024 8:43:39 AM Submission request sent to Applicant
12/11/2024 5:07:58 PM Project Manager Assigned: Ryan Howser
12/11/2024 5:07:58 PM Project Created