Xcel PowerPathway Segment 5 Northern PortionSite Development Plan
Description
See full parcel list in review documents: Electrical facilities proposed in El Paso County include 44 miles of 345 kilovolt double-circuit overhead transmission line to support wind and solar energy development. In service 2027 Segment 5 of overall project. 105-199 feet tall poles, 950-feet between steel poles within 150 foot Electrical transmission ROW. Concrete batch plants are included.Public Service Company of Colorado (PSCo), a Colorado corporation conducting business as Xcel Energy, is seeking approval of a permit to locate and construct major facilities of a public utility (1041 permit) from El Paso County to construct and operate a portion of Colorado’s Power Pathway (Pathway) located in El Paso County. Pathway is a $1.7 billion investment to improve the state’s electric grid and enable future renewable energy development around the state. Pathway will increase electric reliability, boost the regional economy, and create jobs during construction. Pathway includes: • Installation of approximately 550 miles of new 345-kilovolt (kV) double-circuit transmission line in 12 counties; • Construction of four new electric substations (Canal Crossing, Goose Creek, May Valley, and Sandstone); and • Expansion, equipment additions, or equipment upgrades at four existing electric substations (Fort St. Vrain, Pawnee, Harvest Mile, and Tundra). Pathway will be constructed in five segments. Each new or expanded electric substation will serve as an endpoint for the transmission line segments: • Fort St. Vrain – Canal Crossing (Segment 1) • Canal Crossing – Goose Creek (Segment 2) • Goose Creek – May Valley (Segment 3) • May Valley – Sandstone – Tundra (Segment 4) • Sandstone– Harvest Mile (Segment 5) Pathway facilities proposed in El Paso County include 45 miles of 345-kV transmission line within Segment 5. The proposed route in El Paso County is generally oriented in a north to south direction in the area south of Simla, near the El Paso/Lincoln county line.
Parcels
100000006 100000006 100000007 100000007 100000031 100000031 100000041 100000041 100000051 100000051 100000064 100000064 100000081 100000081 100000148 100000148 100000186 100000186 100000384 100000384
Applicant
Public Service Company of Colorado, a Colorado corporation conducting business as Xcel Energy
Jennifer L Chester ( Jennifer.L.Chester@xcelenergy.com ) Jennifer L Chester ( Jennifer.L.Chester@xcelenergy.com )
EA Number
EA2382
File Prefix
PPR - Plot Plan Review
Year
2026
Project Manager
Kari Parsons
Status
Active
Created
5/26/2026 12:11:08 PM


Review Documents (23)

Link Document Date
View Application/Petition Form 6/18/2026 1:21:11 PM
View Authority to Represent 6/18/2026 1:21:12 PM
View Elevation Plans 6/18/2026 1:21:12 PM
View Landscape Plan drawings 6/18/2026 1:21:14 PM
View Legal Description (MS WORD Version required) 6/18/2026 1:21:14 PM
View Letter of Intent 6/18/2026 1:21:15 PM
View Lighting Plan 6/18/2026 1:21:15 PM
View Road Impact Fee Acknowledgement 6/18/2026 1:21:20 PM
View Site Development Plan 6/18/2026 1:21:17 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 6/18/2026 1:21:15 PM
View Financial Assurance Estimate (FAE) Form 6/18/2026 1:21:13 PM
View Floodplain Development Permit 6/18/2026 1:21:18 PM
View Grading & Erosion Control (GEC) Checklist 6/18/2026 1:21:19 PM
View Grading & Erosion Control (GEC) Plan 6/18/2026 1:21:13 PM
View PCM Applicability Form 6/18/2026 1:21:20 PM
View Storm Water Management Plan (SWMP) 6/18/2026 1:21:17 PM
View Storm Water Management Plan (SWMP) Checklist 6/18/2026 1:21:19 PM
View Haul Route Plan 6/18/2026 1:21:18 PM
View Traffic Impact Study 6/18/2026 1:21:16 PM
View Wildland Fire & Hazard Mitigation Plan 6/18/2026 1:21:16 PM
View Access Permits package 6/18/2026 1:21:21 PM
View Parcel list of properties line is being constructed on and laydown areas 6/18/2026 1:21:20 PM
View Road Survey of Condition Preconstruction 6/18/2026 1:21:21 PM



Events (11)

Date Comment
6/19/2026 3:15:28 PM Fees paid: 6/19/2026 (Receipt: 1012199)
6/18/2026 4:41:15 PM Payment Request sent: 6/18/2026
6/18/2026 4:41:15 PM File # Assigned: PPR2617
6/18/2026 4:41:10 PM Submission Triaged
6/18/2026 1:21:44 PM Submission received from Applicant
6/8/2026 12:26:28 PM Submission request sent to Applicant
6/8/2026 8:48:51 AM Submission request sent to Applicant
5/27/2026 3:35:13 PM Submission request sent to Applicant
5/26/2026 12:11:12 PM Project Manager Assigned: Kari Parsons
5/26/2026 12:11:12 PM EA Assigned: EA2382
5/26/2026 12:11:12 PM Project Created