Project Details
Search |
All Active Projects
-
File Number
-
PPR2617
-
Project Name
-
Xcel PowerPathway Segment 5 Northern PortionSite Development Plan
-
Description
-
See full parcel list in review documents: Electrical facilities proposed in El Paso County include 44 miles of 345 kilovolt double-circuit overhead transmission line to support wind and solar energy development. In service 2027 Segment 5 of overall project. 105-199 feet tall poles, 950-feet between steel poles within 150 foot Electrical transmission ROW. Concrete batch plants are included.Public Service Company of Colorado (PSCo), a Colorado corporation conducting business as Xcel Energy, is seeking approval of a permit to locate and construct major facilities of a public utility (1041 permit) from El Paso County to construct and operate a portion of Colorado’s Power Pathway (Pathway) located in El Paso County. Pathway is a $1.7 billion investment to improve the state’s electric grid and enable future renewable energy development around the state. Pathway will increase electric reliability, boost the regional economy, and create jobs during construction. Pathway includes: • Installation of approximately 550 miles of new 345-kilovolt (kV) double-circuit transmission line in 12 counties; • Construction of four new electric substations (Canal Crossing, Goose Creek, May Valley, and Sandstone); and • Expansion, equipment additions, or equipment upgrades at four existing electric substations (Fort St. Vrain, Pawnee, Harvest Mile, and Tundra). Pathway will be constructed in five segments. Each new or expanded electric substation will serve as an endpoint for the transmission line segments: • Fort St. Vrain – Canal Crossing (Segment 1) • Canal Crossing – Goose Creek (Segment 2) • Goose Creek – May Valley (Segment 3) • May Valley – Sandstone – Tundra (Segment 4) • Sandstone– Harvest Mile (Segment 5) Pathway facilities proposed in El Paso County include 45 miles of 345-kV transmission line within Segment 5. The proposed route in El Paso County is generally oriented in a north to south direction in the area south of Simla, near the El Paso/Lincoln county line.
-
Parcels
-
100000006
100000006
100000007
100000007
100000031
100000031
100000041
100000041
100000051
100000051
100000064
100000064
100000081
100000081
100000148
100000148
100000186
100000186
100000384
100000384
-
Applicant
-
Public Service Company of Colorado, a Colorado corporation conducting business as Xcel Energy
Jennifer L Chester ( Jennifer.L.Chester@xcelenergy.com )
Jennifer L Chester ( Jennifer.L.Chester@xcelenergy.com )
-
EA Number
-
EA2382
-
File Prefix
-
PPR - Plot Plan Review
-
Year
-
2026
-
Project Manager
-
Kari Parsons
-
Status
-
Active
-
Created
-
5/26/2026 12:11:08 PM
Review Documents (23)
|
Link
|
Document
|
Date
|
|
View
|
Application/Petition Form
|
6/18/2026 1:21:11 PM
|
|
View
|
Authority to Represent
|
6/18/2026 1:21:12 PM
|
|
View
|
Elevation Plans
|
6/18/2026 1:21:12 PM
|
|
View
|
Landscape Plan drawings
|
6/18/2026 1:21:14 PM
|
|
View
|
Legal Description (MS WORD Version required)
|
6/18/2026 1:21:14 PM
|
|
View
|
Letter of Intent
|
6/18/2026 1:21:15 PM
|
|
View
|
Lighting Plan
|
6/18/2026 1:21:15 PM
|
|
View
|
Road Impact Fee Acknowledgement
|
6/18/2026 1:21:20 PM
|
|
View
|
Site Development Plan
|
6/18/2026 1:21:17 PM
|
|
View
|
Erosion and Stormwater Quality Control Permit (ESQCP)
|
6/18/2026 1:21:15 PM
|
|
View
|
Financial Assurance Estimate (FAE) Form
|
6/18/2026 1:21:13 PM
|
|
View
|
Floodplain Development Permit
|
6/18/2026 1:21:18 PM
|
|
View
|
Grading & Erosion Control (GEC) Checklist
|
6/18/2026 1:21:19 PM
|
|
View
|
Grading & Erosion Control (GEC) Plan
|
6/18/2026 1:21:13 PM
|
|
View
|
PCM Applicability Form
|
6/18/2026 1:21:20 PM
|
|
View
|
Storm Water Management Plan (SWMP)
|
6/18/2026 1:21:17 PM
|
|
View
|
Storm Water Management Plan (SWMP) Checklist
|
6/18/2026 1:21:19 PM
|
|
View
|
Haul Route Plan
|
6/18/2026 1:21:18 PM
|
|
View
|
Traffic Impact Study
|
6/18/2026 1:21:16 PM
|
|
View
|
Wildland Fire & Hazard Mitigation Plan
|
6/18/2026 1:21:16 PM
|
|
View
|
Access Permits package
|
6/18/2026 1:21:21 PM
|
|
View
|
Parcel list of properties line is being constructed on and laydown areas
|
6/18/2026 1:21:20 PM
|
|
View
|
Road Survey of Condition Preconstruction
|
6/18/2026 1:21:21 PM
|
Events (11)
|
Date
|
Comment
|
|
6/19/2026 3:15:28 PM
|
Fees paid: 6/19/2026 (Receipt: 1012199)
|
|
6/18/2026 4:41:15 PM
|
Payment Request sent: 6/18/2026
|
|
6/18/2026 4:41:15 PM
|
File # Assigned: PPR2617
|
|
6/18/2026 4:41:10 PM
|
Submission Triaged
|
|
6/18/2026 1:21:44 PM
|
Submission received from Applicant
|
|
6/8/2026 12:26:28 PM
|
Submission request sent to Applicant
|
|
6/8/2026 8:48:51 AM
|
Submission request sent to Applicant
|
|
5/27/2026 3:35:13 PM
|
Submission request sent to Applicant
|
|
5/26/2026 12:11:12 PM
|
Project Manager Assigned: Kari Parsons
|
|
5/26/2026 12:11:12 PM
|
EA Assigned: EA2382
|
|
5/26/2026 12:11:12 PM
|
Project Created
|