Project Details

Search | All Active Projects


File Number
PPR261
Project Name
Tri-State Crosspoint Site Development Plan
Description
Tri-State Generation and Transmission Association, Inc (Tri-State) is proposing a new 230-kV substation that sectionalizes the existing 230-kV Lincoln – Midway transmission line in El Paso County. The Project is being developed to increase the load serving capability for Tri-State’s Member, Mountain View Electric Association (MVEA), related to substantial residential growth east of Colorado Springs. The current 69-kV system is served by two delivery points at Falcon and Calhan that are increasingly incapable of serving the system and cannot maintain voltage in a contingency situation. The Project is also being developed to improve system reliability for Tri-State’s Member, Southeast Colorado Power Association (SECPA). SECPA’s 69-kV Edison Delivery Point is sourced from MVEA at the Edison Tap, which is 17 miles away, and from Calhan which is 20 miles away - the extended 69-kV system increases exposure and impacts to the system from line faults. 1041 permit approved under file no. AASI251.
Parcels
1400000592 1400000592
Applicant
Ulteig
Derek Holscher ( derek.holscher@ulteig.com )
(720) 873-5876
Derek Holscher ( derek.holscher@ulteig.com )
(720) 873-5876
EA Number
EA23124
File Prefix
PPR - Plot Plan Review
Year
2026
Project Manager
Lacey Dean
Status
Active
Created
8/28/2025 9:18:01 AM

View: Review Comments


Approved Documents (7)

Project pending final approval. Some approved documents are available prior to the overall Approval.

Link Document
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Grading & Erosion Control (GEC) Checklist
View PCM - MHFD Detention Calcs or SDI Form
View PCM Applicability Form
View PCM Operations & Maintenance (O&M) Manual
View Storm Water Management Plan (SWMP)
View Storm Water Management Plan (SWMP) Checklist


Additional Documents (3)

Link Document Comment
View Email authorizing upload of additional docs
View V2_Haul Route Agreement_County Attorney comments
View County Attorney Comments on agreements


Review Documents (40)

Link Document Date
View Application/Petition Form 1/5/2026 2:03:32 PM
View Elevation Plans 3/17/2026 1:48:49 PM
View Landscape Plan drawings 1/5/2026 2:03:35 PM
View Letter of Intent 5/5/2026 4:19:57 PM
View Road Impact Fee Acknowledgement 1/5/2026 2:03:40 PM
View Site Development Plan 5/5/2026 4:19:58 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 5/5/2026 4:19:58 PM
View Financial Assurance Estimate (FAE) Form 5/5/2026 4:19:54 PM
View Fire Access Road Plan 3/17/2026 1:48:51 PM
View Grading & Erosion Control (GEC) Checklist 5/5/2026 4:20:00 PM
View Grading & Erosion Control (GEC) Plan 5/5/2026 4:19:56 PM
View Hazardous Materials Permit 3/17/2026 1:48:51 PM
View Hot Work Plan 3/17/2026 1:48:57 PM
View PCM - MHFD Detention Calcs or SDI Form 3/17/2026 1:48:57 PM
View PCM - Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal) 3/17/2026 1:48:56 PM
View PCM Applicability Form 5/5/2026 4:20:00 PM
View PCM Operations & Maintenance (O&M) Manual 5/5/2026 4:19:59 PM
View Recorded Easement(s) 3/17/2026 1:48:56 PM
View Storm Water Management Plan (SWMP) 3/17/2026 1:48:54 PM
View Storm Water Management Plan (SWMP) Checklist 3/17/2026 1:48:59 PM
View Haul Route Agreement 5/5/2026 4:19:59 PM
View Sign Plan 3/17/2026 1:48:53 PM
View Geotechnical Report 1/5/2026 2:03:39 PM
View Drainage Report - Final 5/5/2026 4:19:55 PM
View PCM Maintenance Agreement (MS WORD version required - attachments included) 5/5/2026 4:03:43 PM
View Crosspoint Road Conditions Report - Pre-Con Photos 3/18/2026 11:53:35 AM
View Notarized - Crosspoint PCM Maintenance Agreement 3/18/2026 11:53:36 AM
View PCM Maintenance Agreement Exhibit A - Description 3/18/2026 11:53:37 AM
View PCM Maintenance Agreement Exhibit B - Detention Pond 3/18/2026 11:53:37 AM
View RESPONSE_Drainage Report-Final_Comments 3/18/2026 11:53:37 AM
View RESPONSE_Financial Assurance Estimate (FAE) Form_comments 3/18/2026 11:53:38 AM
View RESPONSE_Grading & Erosion Control (GEC) Checklist_comments 3/18/2026 11:53:38 AM
View RESPONSE_Grading & Erosion Control (GEC) Plan_comments 3/18/2026 11:53:38 AM
View RESPONSE_PCM Applicability Form_comments 3/18/2026 11:53:39 AM
View RESPONSE_Site Development Plan_comments 3/18/2026 11:53:39 AM
View RESPONSE_Storm Water Management Plan (SWMP) Checklist_comments 3/18/2026 11:54:33 AM
View RESPONSE_Storm Water Management Plan (SWMP)_comments 3/18/2026 11:54:33 AM
View Revised Geotech Report 3/17/2026 1:49:00 PM
View Revised SWMP 5/5/2026 4:20:01 PM
View Signed Crosspoint NOI to Construct Non-Jurisdictional Water Impoundment Structure 3/18/2026 11:54:34 AM



Events (98)

Date Comment
5/20/2026 2:15:10 PM Request for Review Comments returned by EPC DPW Development Services - Engineering
5/20/2026 10:16:14 AM Request for Review Comments returned by EPC DPW Stormwater
5/19/2026 1:02:10 PM Request for Review Comments returned by County Attorney - Development Review
5/6/2026 2:26:47 PM Request for Review Comments returned by Tri-County Fire Protection District
5/6/2026 1:46:12 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Mark Stanwood on behalf of Tri-County Fire Protection District
5/6/2026 1:46:11 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Wyatt Manson on behalf of Tri-County Fire Protection District
5/6/2026 1:46:10 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Zachary Jannusch on behalf of EPC DPW Stormwater
5/6/2026 1:46:09 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Mikayla Hartford on behalf of EPC DPW Stormwater
5/6/2026 1:46:08 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Glenn Reese on behalf of EPC DPW Stormwater
5/6/2026 1:46:07 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Christina Prete on behalf of EPC DPW Stormwater
5/6/2026 1:46:05 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
5/6/2026 1:46:04 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
5/6/2026 1:46:02 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
5/6/2026 1:46:01 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
5/6/2026 1:46:01 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
5/6/2026 1:32:50 PM Submission Triaged
5/5/2026 4:21:16 PM Submission received from Applicant
4/1/2026 9:52:08 PM Submission request sent to Applicant
4/1/2026 9:50:37 PM Request for Review Comments returned by PCD Project Manager
4/1/2026 4:22:06 PM Request for Review Comments returned by Tri-County Fire Protection District
4/1/2026 2:59:51 PM Request for Review Comments returned by EPC DPW Development Services - Engineering
3/31/2026 2:03:56 PM Request for Review Comments returned by EPC DPW Stormwater
3/31/2026 10:31:14 AM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
3/31/2026 10:31:13 AM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
3/31/2026 10:31:12 AM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
3/26/2026 3:02:00 PM Request for Review Comments email resent for Project Tri-State Crosspoint Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
3/26/2026 2:24:50 PM Request for Review Comments returned by County Attorney - Development Review
3/23/2026 9:03:44 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
3/18/2026 12:13:29 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
3/18/2026 12:13:28 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
3/18/2026 12:13:27 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
3/18/2026 12:13:26 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
3/18/2026 12:12:01 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Mark Stanwood on behalf of Tri-County Fire Protection District
3/18/2026 12:12:01 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Wyatt Manson on behalf of Tri-County Fire Protection District
3/18/2026 12:11:59 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Zachary Jannusch on behalf of EPC DPW Stormwater
3/18/2026 12:11:59 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Mikayla Hartford on behalf of EPC DPW Stormwater
3/18/2026 12:11:58 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Glenn Reese on behalf of EPC DPW Stormwater
3/18/2026 12:11:57 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Christina Prete on behalf of EPC DPW Stormwater
3/18/2026 12:11:55 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
3/18/2026 12:11:54 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
3/18/2026 12:11:52 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
3/18/2026 12:11:51 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
3/18/2026 12:11:50 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
3/18/2026 12:11:48 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
3/18/2026 10:32:11 AM Submission Triaged
3/17/2026 1:50:22 PM Submission received from Applicant
2/19/2026 2:53:01 PM Request for Review Comments returned by Black Hills Energy-Aquila
1/31/2026 9:31:13 PM Request for Review Comments returned by El Paso County Conservation Dist
1/29/2026 7:52:09 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
1/27/2026 5:55:05 PM Submission request sent to Applicant
1/27/2026 5:46:48 PM Request for Review Comments returned by PCD Project Manager
1/27/2026 5:03:41 PM Request for Review Comments returned by EPC DPW Development Services - Engineering
1/27/2026 2:57:52 PM Request for Review Comments returned by EPC DPW Stormwater
1/27/2026 8:34:29 AM Request for Review Comments returned by Tri-County Fire Protection District
1/23/2026 9:39:01 AM Request for Review Comments returned by Pikes Peak Regional Building Department
1/22/2026 9:48:46 AM Request for Review Comments returned by EPC Health Department
1/15/2026 9:30:46 AM Request for Review Comments returned by EPC Environmental Services
1/14/2026 10:04:46 AM Request for Review Comments returned by EPC Parks Department
1/13/2026 1:07:31 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Mark Stanwood on behalf of Tri-County Fire Protection District
1/13/2026 1:07:30 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Wyatt Manson on behalf of Tri-County Fire Protection District
1/13/2026 1:07:29 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Dwight Barnes on behalf of Miami Yoder 60 JT
1/13/2026 1:07:28 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Harry Thomas on behalf of El Paso County Conservation Dist
1/13/2026 1:07:27 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist
1/13/2026 1:07:26 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Katie Miller on behalf of El Paso County Conservation Dist
1/13/2026 1:07:25 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Erica Carter on behalf of El Paso County Conservation Dist
1/13/2026 1:07:24 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by on behalf of El Paso County Conservation Dist
1/13/2026 1:07:23 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
1/13/2026 1:07:22 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Cassie Olgren on behalf of El Paso County Conservation Dist
1/13/2026 1:07:21 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Billy Richard on behalf of El Paso County Conservation Dist
1/13/2026 1:07:20 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Trish Riber on behalf of Black Hills Energy-Aquila
1/13/2026 1:07:19 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
1/13/2026 1:07:18 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
1/13/2026 1:07:17 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
1/13/2026 1:07:16 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by on behalf of Pikes Peak Regional Building Department
1/13/2026 1:07:14 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
1/13/2026 1:07:13 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by on behalf of EPC Parks Department
1/13/2026 1:07:12 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department
1/13/2026 1:07:11 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
1/13/2026 1:07:10 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department
1/13/2026 1:07:09 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Kathy Andrew on behalf of EPC Environmental Services
1/13/2026 1:07:08 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Zachary Jannusch on behalf of EPC DPW Stormwater
1/13/2026 1:07:07 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Mikayla Hartford on behalf of EPC DPW Stormwater
1/13/2026 1:07:06 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Glenn Reese on behalf of EPC DPW Stormwater
1/13/2026 1:07:05 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Christina Prete on behalf of EPC DPW Stormwater
1/13/2026 1:07:04 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
1/13/2026 1:07:03 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
1/13/2026 1:07:01 PM Request for Review Comments email sent for Project Tri-State Crosspoint Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
1/13/2026 9:49:21 AM Project Manager Assigned: Lacey Dean
1/12/2026 2:53:13 PM Fees paid: 1/12/2026 (Receipt: 1011520)
1/5/2026 3:19:04 PM Payment Request sent: 1/5/2026
1/5/2026 3:19:03 PM File # Assigned: PPR261
1/5/2026 3:19:01 PM Submission Triaged
1/5/2026 2:04:25 PM Submission received from Applicant
12/17/2025 4:47:00 PM Submission request sent to Applicant
9/4/2025 10:23:59 AM Submission request sent to Applicant
8/28/2025 9:18:05 AM Project Manager Assigned: Ryan Howser
8/28/2025 9:18:05 AM EA Assigned: EA23124
8/28/2025 9:18:05 AM Project Created