| 10/30/2025 1:12:28 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 10/29/2025 4:55:40 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Zachary Jannusch on behalf of EPC DPW Stormwater | 
                
                    | 10/29/2025 4:55:39 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Mikayla Hartford on behalf of EPC DPW Stormwater | 
                
                    | 10/29/2025 4:55:38 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Glenn Reese on behalf of EPC DPW Stormwater | 
                
                    | 10/29/2025 4:55:37 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Christina Prete on behalf of EPC DPW Stormwater | 
                
                    | 10/29/2025 4:55:36 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering | 
                
                    | 10/29/2025 4:55:35 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering | 
                
                    | 10/29/2025 4:55:32 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 10/29/2025 4:54:04 PM | Submission Triaged | 
                
                    | 10/29/2025 4:40:54 PM | Submission received from Applicant | 
                
                    | 10/27/2025 4:30:04 PM | Submission request sent to Applicant | 
                
                    | 10/23/2025 7:16:24 AM | Submission request sent to Applicant | 
                
                    | 10/22/2025 2:51:51 PM | Request for Review Comments returned by EPC DPW Stormwater | 
                
                    | 10/21/2025 4:45:35 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/21/2025 4:42:59 PM | Request for Review Comments email resent for Project Retreat at PraireRidge Filing 4 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 10/21/2025 4:25:19 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Zachary Jannusch on behalf of EPC DPW Stormwater | 
                
                    | 10/21/2025 4:25:18 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Mikayla Hartford on behalf of EPC DPW Stormwater | 
                
                    | 10/21/2025 4:25:17 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Glenn Reese on behalf of EPC DPW Stormwater | 
                
                    | 10/21/2025 4:25:16 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Christina Prete on behalf of EPC DPW Stormwater | 
                
                    | 10/21/2025 4:18:14 PM | Request for Review Comments returned by EPC DPW Development Services - Engineering | 
                
                    | 10/21/2025 3:35:04 PM | Submission request sent to Applicant | 
                
                    | 10/21/2025 3:34:45 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/21/2025 3:28:29 PM | Request for Review Comments email resent for Project Retreat at PraireRidge Filing 4 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 10/21/2025 3:25:57 PM | Submission request sent to Applicant | 
                
                    | 10/21/2025 3:24:26 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/16/2025 9:58:25 AM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 10/7/2025 7:45:23 AM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering | 
                
                    | 10/7/2025 7:45:22 AM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering | 
                
                    | 10/7/2025 7:45:19 AM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 10/7/2025 7:45:18 AM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 10/7/2025 7:45:17 AM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 10/7/2025 7:45:15 AM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 10/7/2025 7:45:14 AM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 10/7/2025 7:42:53 AM | Submission Triaged | 
                
                    | 10/3/2025 2:18:41 PM | Submission received from Applicant | 
                
                    | 9/12/2025 3:15:37 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 9/11/2025 1:48:13 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 9/9/2025 8:32:44 AM | Submission request sent to Applicant | 
                
                    | 9/8/2025 5:21:21 PM | Request for Review Comments returned by EPC DPW Stormwater | 
                
                    | 9/8/2025 7:10:07 AM | Submission request sent to Applicant | 
                
                    | 9/8/2025 7:09:32 AM | Submission request sent to Applicant | 
                
                    | 9/5/2025 3:12:18 PM | Request for Review Comments returned by EPC DPW Development Services - Engineering | 
                
                    | 9/5/2025 10:36:27 AM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 9/5/2025 10:09:00 AM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 9/4/2025 11:46:03 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/2/2025 5:28:38 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Zachary Jannusch on behalf of EPC DPW Stormwater | 
                
                    | 9/2/2025 5:28:37 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Mikayla Hartford on behalf of EPC DPW Stormwater | 
                
                    | 9/2/2025 5:28:36 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Glenn Reese on behalf of EPC DPW Stormwater | 
                
                    | 9/2/2025 5:28:36 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Christina Prete on behalf of EPC DPW Stormwater | 
                
                    | 9/2/2025 3:56:08 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Zachary Jannusch on behalf of EPC DPW Stormwater | 
                
                    | 9/2/2025 3:56:07 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Mikayla Hartford on behalf of EPC DPW Stormwater | 
                
                    | 9/2/2025 3:56:06 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Glenn Reese on behalf of EPC DPW Stormwater | 
                
                    | 9/2/2025 3:56:05 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Christina Prete on behalf of EPC DPW Stormwater | 
                
                    | 9/2/2025 3:56:04 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering | 
                
                    | 9/2/2025 3:56:03 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering | 
                
                    | 9/2/2025 3:55:59 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 9/2/2025 3:55:57 PM | Request for Review Comments email sent for Project Retreat at PraireRidge Filing 4 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 8/29/2025 9:52:21 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 8/28/2025 1:02:16 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Christina Prete on behalf of EPC DPW Stormwater | 
                
                    | 8/28/2025 1:02:15 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Zachary Jannusch on behalf of EPC DPW Stormwater | 
                
                    | 8/28/2025 1:02:14 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Mikayla Hartford on behalf of EPC DPW Stormwater | 
                
                    | 8/28/2025 1:02:13 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Glenn Reese on behalf of EPC DPW Stormwater | 
                
                    | 8/28/2025 1:02:12 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering | 
                
                    | 8/28/2025 1:02:09 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering | 
                
                    | 8/28/2025 1:02:08 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by April Willie on behalf of County Attorney - Water | 
                
                    | 8/28/2025 1:02:07 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 8/28/2025 1:02:06 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 8/28/2025 1:02:05 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 8/28/2025 1:02:04 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 8/28/2025 1:02:03 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 8/28/2025 1:02:02 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 8/28/2025 1:01:59 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 8/28/2025 12:58:50 PM | Submission Triaged | 
                
                    | 8/28/2025 9:44:21 AM | Submission received from Applicant | 
                
                    | 8/20/2025 9:07:44 AM | Submission request sent to Applicant | 
                
                    | 8/20/2025 8:42:43 AM | Request for Review Comments returned by EPC DPW Stormwater | 
                
                    | 8/20/2025 8:37:30 AM | Request for Review Comments returned by EPC DPW Development Services - Engineering | 
                
                    | 8/19/2025 5:30:31 PM | Request for Review Comments email resent for Project Retreat at Praire Ridge Filing 4 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering | 
                
                    | 8/19/2025 2:10:53 PM | Request for Review Comments email resent for Project Retreat at Praire Ridge Filing 4 for review by Christina Prete on behalf of EPC DPW Stormwater | 
                
                    | 8/19/2025 2:10:06 PM | Submission request sent to Applicant | 
                
                    | 8/19/2025 2:06:46 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 8/19/2025 2:05:22 PM | Request for Review Comments returned by EPC DPW Development Services - Engineering | 
                
                    | 8/19/2025 1:36:54 PM | Request for Review Comments returned by Black Forest Fire Protection District | 
                
                    | 8/18/2025 4:37:16 PM | Request for Review Comments returned by EPC DPW Stormwater | 
                
                    | 8/14/2025 5:36:39 PM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 8/14/2025 4:21:31 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 8/14/2025 1:46:58 PM | Request for Review Comments returned by Falcon School District 49 | 
                
                    | 8/14/2025 10:03:09 AM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 8/11/2025 12:15:30 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 8/11/2025 10:39:44 AM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 8/8/2025 1:33:54 PM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 8/6/2025 4:32:18 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 8/6/2025 11:47:02 AM | Request for Review Comments returned by US Postal Service | 
                
                    | 8/6/2025 7:31:52 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 8/5/2025 1:35:34 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 8/5/2025 10:19:48 AM | Request for Review Comments returned by PCD Administrative Notice | 
                
                    | 8/4/2025 3:52:43 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 7/31/2025 8:08:08 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 7/30/2025 7:16:59 AM | Request for Review Comments returned by Academy SD 20 Building Fund | 
                
                    | 7/29/2025 2:22:21 PM | Request for Review Comments returned by Falcon Fire Protection District | 
                
                    | 7/29/2025 2:09:19 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 7/29/2025 2:09:18 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Evelyn galanephillips on behalf of Falcon School District 49 | 
                
                    | 7/29/2025 2:09:16 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Trent Harwig on behalf of Falcon Fire Protection District | 
                
                    | 7/29/2025 2:09:15 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Curtis Kauffman on behalf of Falcon Fire Protection District | 
                
                    | 7/29/2025 2:09:14 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Harry Thomas on behalf of El Paso County Conservation Dist | 
                
                    | 7/29/2025 2:09:13 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Oliver Watkins on behalf of El Paso County Conservation Dist | 
                
                    | 7/29/2025 2:09:12 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Katie Miller on behalf of El Paso County Conservation Dist | 
                
                    | 7/29/2025 2:09:11 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Erica Carter on behalf of El Paso County Conservation Dist | 
                
                    | 7/29/2025 2:09:10 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by  on behalf of El Paso County Conservation Dist | 
                
                    | 7/29/2025 2:09:09 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Mariah Hudson on behalf of El Paso County Conservation Dist | 
                
                    | 7/29/2025 2:09:08 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Cassie Olgren on behalf of El Paso County Conservation Dist | 
                
                    | 7/29/2025 2:09:07 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Billy Richard on behalf of El Paso County Conservation Dist | 
                
                    | 7/29/2025 2:09:05 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila | 
                
                    | 7/29/2025 2:09:04 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Marcus Henderson on behalf of Black Hills Energy-Aquila | 
                
                    | 7/29/2025 2:09:03 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 7/29/2025 2:09:02 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Adam Magoon on behalf of Black Hills Energy-Aquila | 
                
                    | 7/29/2025 2:09:01 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Rachel Dunn on behalf of Black Forest Fire Protection District | 
                
                    | 7/29/2025 2:09:00 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Michael Alvarado on behalf of Black Forest Fire Protection District | 
                
                    | 7/29/2025 2:08:59 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by  on behalf of Black Forest Fire Protection District | 
                
                    | 7/29/2025 2:08:58 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Fielding Lucas on behalf of Black Forest Fire Protection District | 
                
                    | 7/29/2025 2:08:57 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Chad Herdt on behalf of Black Forest Fire Protection District | 
                
                    | 7/29/2025 2:08:55 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Tom Gregory on behalf of Academy SD 20 Building Fund | 
                
                    | 7/29/2025 2:08:54 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Donald Smith on behalf of Academy SD 20 Building Fund | 
                
                    | 7/29/2025 2:08:53 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Becky Allan on behalf of Academy SD 20 Building Fund | 
                
                    | 7/29/2025 2:08:52 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 7/29/2025 2:08:51 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 7/29/2025 2:08:50 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 7/29/2025 2:08:49 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 7/29/2025 2:08:47 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Rita Otega on behalf of US Postal Service | 
                
                    | 7/29/2025 2:08:46 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Peyton Post Office on behalf of US Postal Service | 
                
                    | 7/29/2025 2:08:45 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Travis Sauder on behalf of Colorado Parks and Wildlife | 
                
                    | 7/29/2025 2:08:44 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Tim Kroening on behalf of Colorado Parks and Wildlife | 
                
                    | 7/29/2025 2:08:43 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Peter Chapman on behalf of Colorado Parks and Wildlife | 
                
                    | 7/29/2025 2:08:42 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 7/29/2025 2:08:41 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife | 
                
                    | 7/29/2025 2:08:40 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 7/29/2025 2:08:39 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Javier Vargas-Johnson on behalf of Colorado Division of Water Resources | 
                
                    | 7/29/2025 2:08:38 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Ailis Thyne on behalf of Colorado Division of Water Resources | 
                
                    | 7/29/2025 2:08:37 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by  on behalf of Parks Advisory Board | 
                
                    | 7/29/2025 2:08:36 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Jeff Kramer on behalf of EPC Sheriff's Department | 
                
                    | 7/29/2025 2:08:35 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Christopher Gonzalez on behalf of EPC Sheriff's Department | 
                
                    | 7/29/2025 2:08:34 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Andrew Prehm on behalf of EPC Sheriff's Department | 
                
                    | 7/29/2025 2:08:32 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 7/29/2025 2:08:31 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 7/29/2025 2:08:30 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by  on behalf of EPC Parks Department | 
                
                    | 7/29/2025 2:08:29 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 7/29/2025 2:08:28 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 7/29/2025 2:08:27 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 7/29/2025 2:08:26 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 7/29/2025 2:08:24 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Zachary Jannusch on behalf of EPC DPW Stormwater | 
                
                    | 7/29/2025 2:08:23 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Mikayla Hartford on behalf of EPC DPW Stormwater | 
                
                    | 7/29/2025 2:08:22 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Glenn Reese on behalf of EPC DPW Stormwater | 
                
                    | 7/29/2025 2:08:21 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Christina Prete on behalf of EPC DPW Stormwater | 
                
                    | 7/29/2025 2:08:20 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering | 
                
                    | 7/29/2025 2:08:19 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering | 
                
                    | 7/29/2025 2:08:18 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 7/29/2025 2:08:17 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 7/29/2025 2:08:16 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 7/29/2025 2:08:14 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 7/29/2025 2:08:12 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by  on behalf of PCD Administrative Notice | 
                
                    | 7/29/2025 2:08:11 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 7/29/2025 2:03:19 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 7/29/2025 2:03:18 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Zachary Jannusch on behalf of EPC DPW Stormwater | 
                
                    | 7/29/2025 2:03:17 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Mikayla Hartford on behalf of EPC DPW Stormwater | 
                
                    | 7/29/2025 2:03:16 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Glenn Reese on behalf of EPC DPW Stormwater | 
                
                    | 7/29/2025 2:03:15 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Christina Prete on behalf of EPC DPW Stormwater | 
                
                    | 7/29/2025 2:03:14 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering | 
                
                    | 7/29/2025 2:03:13 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering | 
                
                    | 7/29/2025 2:03:12 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 7/29/2025 2:03:11 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 7/29/2025 2:03:10 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 7/29/2025 2:03:07 PM | Request for Review Comments email sent for Project Retreat at Praire Ridge Filing 4 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 7/22/2025 1:56:20 PM | Fees paid: 7/22/2025 (Receipt: 1010808) | 
                
                    | 7/18/2025 6:38:45 PM | Payment Request sent: 7/18/2025 | 
                
                    | 7/18/2025 6:38:45 PM | File # Assigned: SF2523 | 
                
                    | 7/18/2025 6:38:38 PM | Submission Triaged | 
                
                    | 7/16/2025 12:40:30 PM | Submission received from Applicant | 
                
                    | 6/24/2025 7:26:45 AM | Submission request sent to Applicant | 
                
                    | 6/10/2025 8:35:44 AM | Submission request sent to Applicant | 
                
                    | 6/10/2025 8:29:23 AM | Project Manager Assigned: Kari Parsons | 
                
                    | 6/10/2025 8:29:23 AM | Project Created |