| 10/28/2025 3:40:27 PM | Submission request sent to Applicant | 
                
                    | 10/21/2025 7:41:51 AM | Submission request sent to Applicant | 
                
                    | 10/20/2025 5:09:44 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 10/20/2025 3:14:40 PM | Submission request sent to Applicant | 
                
                    | 10/20/2025 3:13:10 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/20/2025 3:07:17 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 10/20/2025 2:13:28 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 10/10/2025 3:38:04 PM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 10/8/2025 2:00:23 PM | Submission Triaged | 
                
                    | 10/7/2025 8:00:15 AM | Submission received from Applicant | 
                
                    | 10/6/2025 1:54:03 PM | Submission request sent to Applicant | 
                
                    | 10/6/2025 1:43:13 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 10/6/2025 1:43:12 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 10/6/2025 1:43:11 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 10/6/2025 1:43:10 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 10/6/2025 1:43:09 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 10/6/2025 1:43:08 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 10/6/2025 1:43:07 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 10/6/2025 1:43:05 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 10/6/2025 1:43:03 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 10/6/2025 1:43:02 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 10/6/2025 1:42:59 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 10/6/2025 1:40:11 PM | Submission request canceled | 
                
                    | 10/6/2025 9:24:08 AM | Submission request sent to Applicant | 
                
                    | 10/6/2025 9:23:52 AM | Submission Triaged | 
                
                    | 10/3/2025 4:13:24 PM | Submission received from Applicant | 
                
                    | 10/2/2025 3:09:10 PM | Submission request sent to Applicant | 
                
                    | 9/15/2025 10:52:43 AM | Submission request sent to Applicant | 
                
                    | 9/15/2025 10:52:26 AM | Submission request canceled | 
                
                    | 9/10/2025 2:51:23 PM | Submission request sent to Applicant | 
                
                    | 9/10/2025 2:50:40 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/8/2025 4:57:09 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 9/8/2025 3:59:57 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 9/8/2025 12:01:40 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 9/5/2025 1:21:59 PM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 8/26/2025 11:50:30 AM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 8/25/2025 12:47:50 PM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 8/25/2025 10:36:01 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 8/25/2025 10:35:59 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 8/25/2025 10:35:58 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 8/25/2025 10:35:57 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 8/25/2025 10:35:56 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 8/25/2025 10:35:55 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by  on behalf of EPC Parks Department | 
                
                    | 8/25/2025 10:35:54 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 8/25/2025 10:35:53 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 8/25/2025 10:35:52 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 8/25/2025 10:35:50 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 8/25/2025 10:35:49 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Jalal Saleh on behalf of PCD Engineering Division | 
                
                    | 8/25/2025 10:35:48 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 8/25/2025 10:35:47 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/25/2025 10:35:44 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 8/25/2025 10:33:10 AM | Submission Triaged | 
                
                    | 8/22/2025 3:04:29 PM | Submission received from Applicant | 
                
                    | 8/19/2025 7:43:02 AM | Submission request sent to Applicant | 
                
                    | 8/4/2025 10:17:55 AM | Submission request sent to Applicant | 
                
                    | 7/31/2025 10:46:31 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 7/31/2025 10:15:08 AM | Submission request sent to Applicant | 
                
                    | 7/30/2025 5:32:20 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 7/30/2025 4:55:01 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 7/30/2025 3:50:28 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 7/30/2025 2:43:03 PM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 7/29/2025 3:13:43 PM | Request for Review Comments returned by Widefield SD 3 | 
                
                    | 7/28/2025 11:02:17 AM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 7/23/2025 9:33:24 AM | Request for Review Comments returned by PCD Administrative Notice | 
                
                    | 7/17/2025 1:29:18 PM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 7/15/2025 1:29:31 PM | Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 7/14/2025 1:40:31 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 7/11/2025 2:50:34 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 7/10/2025 1:13:08 PM | Request for Review Comments returned by Colorado Springs Planning & Community Development | 
                
                    | 7/9/2025 3:41:38 PM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 7/9/2025 2:54:07 PM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 7/9/2025 11:26:41 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Dave Gish on behalf of Widefield SD 3 | 
                
                    | 7/9/2025 11:26:40 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy | 
                
                    | 7/9/2025 11:26:38 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Harry Thomas on behalf of El Paso County Conservation Dist | 
                
                    | 7/9/2025 11:26:37 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Oliver Watkins on behalf of El Paso County Conservation Dist | 
                
                    | 7/9/2025 11:26:36 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Katie Miller on behalf of El Paso County Conservation Dist | 
                
                    | 7/9/2025 11:26:35 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Erica Carter on behalf of El Paso County Conservation Dist | 
                
                    | 7/9/2025 11:26:34 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by  on behalf of El Paso County Conservation Dist | 
                
                    | 7/9/2025 11:26:33 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Mariah Hudson on behalf of El Paso County Conservation Dist | 
                
                    | 7/9/2025 11:26:32 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Cassie Olgren on behalf of El Paso County Conservation Dist | 
                
                    | 7/9/2025 11:26:31 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Billy Richard on behalf of El Paso County Conservation Dist | 
                
                    | 7/9/2025 11:26:30 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 7/9/2025 11:26:29 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by  on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 7/9/2025 11:26:27 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Tamara Baxter on behalf of Colorado Springs Planning & Community Development | 
                
                    | 7/9/2025 11:26:26 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Drew Fox on behalf of Colorado Springs Planning & Community Development | 
                
                    | 7/9/2025 11:26:25 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Stefan Manning on behalf of Colorado Springs Fire Department | 
                
                    | 7/9/2025 11:26:24 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Steve Smith on behalf of Colorado Springs Fire Department | 
                
                    | 7/9/2025 11:26:23 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Cindy Moore on behalf of Colorado Centre Metro(includes Cuchares Ranch sub.) | 
                
                    | 7/9/2025 11:26:22 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Al Testa on behalf of Colorado Centre Metro(includes Cuchares Ranch sub.) | 
                
                    | 7/9/2025 11:26:21 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 7/9/2025 11:26:19 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 7/9/2025 11:26:18 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 7/9/2025 11:26:18 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 7/9/2025 11:26:16 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Travis Sauder on behalf of Colorado Parks and Wildlife | 
                
                    | 7/9/2025 11:26:15 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Tim Kroening on behalf of Colorado Parks and Wildlife | 
                
                    | 7/9/2025 11:26:14 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Peter Chapman on behalf of Colorado Parks and Wildlife | 
                
                    | 7/9/2025 11:26:13 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 7/9/2025 11:26:12 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife | 
                
                    | 7/9/2025 11:26:11 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 7/9/2025 11:26:10 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 7/9/2025 11:26:09 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 7/9/2025 11:26:08 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 7/9/2025 11:26:07 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 7/9/2025 11:26:06 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Jeff Kramer on behalf of EPC Sheriff's Department | 
                
                    | 7/9/2025 11:26:05 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Christopher Gonzalez on behalf of EPC Sheriff's Department | 
                
                    | 7/9/2025 11:26:04 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Andrew Prehm on behalf of EPC Sheriff's Department | 
                
                    | 7/9/2025 11:26:03 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 7/9/2025 11:26:02 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 7/9/2025 11:26:01 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by  on behalf of EPC Parks Department | 
                
                    | 7/9/2025 11:25:59 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 7/9/2025 11:25:58 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 7/9/2025 11:25:57 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 7/9/2025 11:25:56 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 7/9/2025 11:25:55 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 7/9/2025 11:25:54 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 7/9/2025 11:25:53 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 7/9/2025 11:25:51 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 7/9/2025 11:25:50 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 7/9/2025 11:25:49 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 7/9/2025 11:25:48 AM | Request for Review Comments email sent for Project Rising Moon Filing No. 1 (Phase 1) Final Plat for review by  on behalf of PCD Administrative Notice | 
                
                    | 7/9/2025 11:15:09 AM | Project Manager Assigned: Kylie Bagley | 
                
                    | 7/9/2025 11:14:24 AM | Submission Triaged | 
                
                    | 7/8/2025 2:32:37 PM | Submission received from Applicant | 
                
                    | 7/8/2025 2:28:44 PM | Submission request sent to Applicant | 
                
                    | 6/27/2025 11:40:28 AM | Fees paid: 6/27/2025 (Receipt: 1010709) | 
                
                    | 6/26/2025 9:46:09 AM | Payment Request sent: 6/26/2025 | 
                
                    | 6/26/2025 9:46:08 AM | File # Assigned: SF2522 | 
                
                    | 6/26/2025 9:46:02 AM | Submission Triaged | 
                
                    | 6/25/2025 2:30:11 PM | Submission received from Applicant | 
                
                    | 6/25/2025 1:53:38 PM | Submission request sent to Applicant | 
                
                    | 6/25/2025 1:53:26 PM | Submission Triaged | 
                
                    | 6/25/2025 9:48:15 AM | Submission received from Applicant | 
                
                    | 6/18/2025 3:44:51 PM | Submission request sent to Applicant | 
                
                    | 5/28/2025 8:09:25 AM | Submission request sent to Applicant | 
                
                    | 3/10/2025 9:43:09 AM | Submission request sent to Applicant | 
                
                    | 3/10/2025 9:33:04 AM | Submission request sent to Applicant | 
                
                    | 3/4/2025 9:11:21 AM | Project Manager Assigned: Ashlyn Mathy | 
                
                    | 3/4/2025 9:11:21 AM | EA Assigned: EA2520 | 
                
                    | 3/4/2025 9:11:21 AM | Project Created |