| 10/23/2025 2:47:44 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 10/21/2025 7:19:04 AM | Submission request sent to Applicant | 
                
                    | 10/17/2025 4:45:34 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 10/17/2025 3:41:27 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/14/2025 12:06:44 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 10/10/2025 2:17:24 PM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 10/7/2025 8:21:22 AM | Request for Review Comments sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-8) for review by April Willie on behalf of County Attorney - Water | 
                
                    | 9/26/2025 4:21:26 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-8) for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 9/26/2025 4:21:25 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-8) for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 9/26/2025 4:21:24 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-8) for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 9/26/2025 4:21:22 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-8) for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 9/26/2025 4:21:21 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-8) for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 9/26/2025 4:21:19 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-8) for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 9/26/2025 4:21:17 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-8) for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 9/26/2025 4:15:56 PM | Submission Triaged | 
                
                    | 9/26/2025 3:50:06 PM | Submission received from Applicant | 
                
                    | 9/18/2025 9:26:37 AM | Submission request sent to Applicant | 
                
                    | 9/16/2025 5:13:14 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 9/16/2025 10:43:11 AM | Submission request sent to Applicant | 
                
                    | 9/16/2025 10:07:16 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 9/12/2025 10:37:35 AM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 9/11/2025 5:07:23 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/11/2025 1:43:46 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 9/10/2025 3:42:10 PM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 9/4/2025 4:39:04 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 8/28/2025 2:26:51 PM | Request for Review Comments returned by EPC DPW Stormwater | 
                
                    | 8/21/2025 1:01:08 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 8/21/2025 1:01:07 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Rachel Dunn on behalf of Black Forest Fire Protection District | 
                
                    | 8/21/2025 1:01:06 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Michael Alvarado on behalf of Black Forest Fire Protection District | 
                
                    | 8/21/2025 1:01:05 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of Black Forest Fire Protection District | 
                
                    | 8/21/2025 1:01:04 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Fielding Lucas on behalf of Black Forest Fire Protection District | 
                
                    | 8/21/2025 1:01:03 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Chad Herdt on behalf of Black Forest Fire Protection District | 
                
                    | 8/21/2025 1:01:01 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of EPC Parks Department | 
                
                    | 8/21/2025 1:01:00 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Zachary Jannusch on behalf of EPC DPW Stormwater | 
                
                    | 8/21/2025 1:00:59 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Mikayla Hartford on behalf of EPC DPW Stormwater | 
                
                    | 8/21/2025 1:00:58 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Glenn Reese on behalf of EPC DPW Stormwater | 
                
                    | 8/21/2025 1:00:57 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Christina Prete on behalf of EPC DPW Stormwater | 
                
                    | 8/21/2025 1:00:56 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 8/21/2025 1:00:55 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 8/21/2025 1:00:54 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by April Willie on behalf of County Attorney - Water | 
                
                    | 8/21/2025 1:00:53 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 8/21/2025 1:00:52 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 8/21/2025 1:00:51 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 8/21/2025 1:00:48 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 8/21/2025 1:00:46 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Jalal Saleh on behalf of PCD Engineering Division | 
                
                    | 8/21/2025 1:00:45 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 8/21/2025 1:00:44 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/21/2025 1:00:42 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 8/21/2025 12:51:40 PM | Submission Triaged | 
                
                    | 8/21/2025 9:29:28 AM | Submission received from Applicant | 
                
                    | 7/18/2025 2:25:35 PM | Submission request sent to Applicant | 
                
                    | 7/18/2025 2:25:18 PM | Submission Triaged | 
                
                    | 7/17/2025 5:41:13 PM | Submission received from Applicant | 
                
                    | 6/20/2025 5:37:24 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 6/17/2025 8:43:45 AM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 5/30/2025 4:03:48 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 5/29/2025 1:35:42 PM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 5/28/2025 3:07:43 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 5/28/2025 8:20:09 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 5/23/2025 10:44:12 AM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 5/22/2025 4:45:57 PM | Submission request sent to Applicant | 
                
                    | 5/22/2025 4:43:27 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 5/22/2025 1:33:09 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 5/22/2025 8:15:32 AM | Request for Review Comments returned by EPC Fire and Wildfire Program Manager | 
                
                    | 5/21/2025 4:41:00 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 5/21/2025 3:01:43 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 5/21/2025 1:17:04 PM | Request for Review Comments returned by EPC DPW Stormwater | 
                
                    | 5/21/2025 8:13:30 AM | Request for Review Comments returned by Colorado Springs Public Works | 
                
                    | 5/20/2025 1:53:03 PM | Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 5/20/2025 10:04:14 AM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 5/18/2025 6:34:23 PM | Request for Review Comments returned by Black Forest Land Use Committee | 
                
                    | 5/12/2025 1:37:41 PM | Request for Review Comments returned by Colorado Springs Planning & Community Development | 
                
                    | 5/8/2025 10:26:34 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 5/7/2025 3:34:50 PM | Request for Review Comments returned by Colorado Department of Public Health and Environment | 
                
                    | 5/7/2025 2:28:02 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 5/6/2025 2:18:17 PM | Fees paid: 5/6/2025 (Receipt: 1010500) | 
                
                    | 5/6/2025 9:35:54 AM | Payment Request sent: 5/6/2025 | 
                
                    | 5/5/2025 8:01:22 AM | Request for Review Comments returned by Academy SD 20 Building Fund | 
                
                    | 5/3/2025 8:35:50 PM | Request for Review Comments returned by Black Forest Fire Protection District | 
                
                    | 5/2/2025 3:57:52 PM | Request for Review Comments returned by PCD Administrative Notice | 
                
                    | 5/2/2025 1:25:16 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager | 
                
                    | 5/1/2025 11:11:56 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 4/30/2025 3:18:08 PM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 4/30/2025 2:00:09 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas) | 
                
                    | 4/30/2025 2:00:08 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 4/30/2025 2:00:07 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Vicki Wood on behalf of Lewis Palmer 38 | 
                
                    | 4/30/2025 2:00:06 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Melissa Andrews on behalf of Lewis Palmer 38 | 
                
                    | 4/30/2025 2:00:05 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Brett Ridgway on behalf of Lewis Palmer 38 | 
                
                    | 4/30/2025 2:00:03 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Harry Thomas on behalf of El Paso County Conservation Dist | 
                
                    | 4/30/2025 2:00:02 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Oliver Watkins on behalf of El Paso County Conservation Dist | 
                
                    | 4/30/2025 2:00:02 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Katie Miller on behalf of El Paso County Conservation Dist | 
                
                    | 4/30/2025 2:00:00 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Erica Carter on behalf of El Paso County Conservation Dist | 
                
                    | 4/30/2025 1:59:59 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of El Paso County Conservation Dist | 
                
                    | 4/30/2025 1:59:58 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Mariah Hudson on behalf of El Paso County Conservation Dist | 
                
                    | 4/30/2025 1:59:57 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Cassie Olgren on behalf of El Paso County Conservation Dist | 
                
                    | 4/30/2025 1:59:56 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Billy Richard on behalf of El Paso County Conservation Dist | 
                
                    | 4/30/2025 1:59:55 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO) | 
                
                    | 4/30/2025 1:59:54 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 4/30/2025 1:59:53 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 4/30/2025 1:59:51 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Zaker Alazzeh on behalf of Colorado Springs Public Works | 
                
                    | 4/30/2025 1:59:50 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by LaShunda Simpson on behalf of Colorado Springs Public Works | 
                
                    | 4/30/2025 1:59:49 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Jonathan Scherer on behalf of Colorado Springs Public Works | 
                
                    | 4/30/2025 1:59:48 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Joel Dagnillo on behalf of Colorado Springs Public Works | 
                
                    | 4/30/2025 1:59:47 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Jeff Bailey on behalf of Colorado Springs Public Works | 
                
                    | 4/30/2025 1:59:46 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Hao Vo on behalf of Colorado Springs Public Works | 
                
                    | 4/30/2025 1:59:45 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Erin Powers on behalf of Colorado Springs Public Works | 
                
                    | 4/30/2025 1:59:44 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by General Email on behalf of Colorado Springs Public Works | 
                
                    | 4/30/2025 1:59:43 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Dana Davison on behalf of Colorado Springs Public Works | 
                
                    | 4/30/2025 1:59:42 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Brian Shevock on behalf of Colorado Springs Public Works | 
                
                    | 4/30/2025 1:59:41 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development | 
                
                    | 4/30/2025 1:59:40 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Drew Fox on behalf of Colorado Springs Planning & Community Development | 
                
                    | 4/30/2025 1:59:39 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila | 
                
                    | 4/30/2025 1:59:38 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Marcus Henderson on behalf of Black Hills Energy-Aquila | 
                
                    | 4/30/2025 1:59:37 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 4/30/2025 1:59:36 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Adam Magoon on behalf of Black Hills Energy-Aquila | 
                
                    | 4/30/2025 1:59:34 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Cheryl Pixley on behalf of Black Forest Trails Association | 
                
                    | 4/30/2025 1:59:33 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Terry Stokka on behalf of Black Forest Land Use Committee | 
                
                    | 4/30/2025 1:59:32 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Terry Stokka on behalf of Black Forest Land Use Committee | 
                
                    | 4/30/2025 1:59:31 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Rachel Dunn on behalf of Black Forest Fire Protection District | 
                
                    | 4/30/2025 1:59:30 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Michael Alvarado on behalf of Black Forest Fire Protection District | 
                
                    | 4/30/2025 1:59:29 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of Black Forest Fire Protection District | 
                
                    | 4/30/2025 1:59:28 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Chad Herdt on behalf of Black Forest Fire Protection District | 
                
                    | 4/30/2025 1:59:27 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Tom Gregory on behalf of Academy SD 20 Building Fund | 
                
                    | 4/30/2025 1:59:26 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Donald Smith on behalf of Academy SD 20 Building Fund | 
                
                    | 4/30/2025 1:59:25 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Becky Allan on behalf of Academy SD 20 Building Fund | 
                
                    | 4/30/2025 1:59:23 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 4/30/2025 1:59:22 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 4/30/2025 1:59:21 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 4/30/2025 1:59:20 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Glenn West on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 4/30/2025 1:59:19 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Kimberly Wilkes on behalf of US Forest Service, Pikes Peak Ranger District | 
                
                    | 4/30/2025 1:59:18 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District | 
                
                    | 4/30/2025 1:59:17 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 4/30/2025 1:59:16 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 4/30/2025 1:59:15 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 4/30/2025 1:59:14 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 4/30/2025 1:59:13 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Mike Till on behalf of Colorado State Forest Service | 
                
                    | 4/30/2025 1:59:11 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Travis Sauder on behalf of Colorado Parks and Wildlife | 
                
                    | 4/30/2025 1:59:10 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Tim Kroening on behalf of Colorado Parks and Wildlife | 
                
                    | 4/30/2025 1:59:09 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 4/30/2025 1:59:08 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife | 
                
                    | 4/30/2025 1:59:07 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 4/30/2025 1:59:06 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources | 
                
                    | 4/30/2025 1:59:05 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Ailis Thyne on behalf of Colorado Division of Water Resources | 
                
                    | 4/30/2025 1:59:04 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 4/30/2025 1:59:03 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 4/30/2025 1:59:02 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 4/30/2025 1:59:01 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of Colorado Department of Public Health and Environment | 
                
                    | 4/30/2025 1:59:00 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment | 
                
                    | 4/30/2025 1:58:59 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of Parks Advisory Board | 
                
                    | 4/30/2025 1:58:57 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Jeff Kramer on behalf of EPC Sheriff's Department | 
                
                    | 4/30/2025 1:58:56 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Christopher Gonzalez on behalf of EPC Sheriff's Department | 
                
                    | 4/30/2025 1:58:55 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Andrew Prehm on behalf of EPC Sheriff's Department | 
                
                    | 4/30/2025 1:58:54 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 4/30/2025 1:58:53 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of EPC Public Works, County Engineer | 
                
                    | 4/30/2025 1:58:52 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of EPC Parks Department | 
                
                    | 4/30/2025 1:58:51 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 4/30/2025 1:58:50 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 4/30/2025 1:58:49 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 4/30/2025 1:58:48 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 4/30/2025 1:58:46 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Zachary Jannusch on behalf of EPC DPW Stormwater | 
                
                    | 4/30/2025 1:58:45 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Mikayla Hartford on behalf of EPC DPW Stormwater | 
                
                    | 4/30/2025 1:58:44 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Glenn Reese on behalf of EPC DPW Stormwater | 
                
                    | 4/30/2025 1:58:43 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Christina Prete on behalf of EPC DPW Stormwater | 
                
                    | 4/30/2025 1:58:42 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 4/30/2025 1:58:41 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Erika Keech on behalf of County Attorney - Water | 
                
                    | 4/30/2025 1:58:40 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by April Willie on behalf of County Attorney - Water | 
                
                    | 4/30/2025 1:58:39 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 4/30/2025 1:58:38 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Erika Keech on behalf of County Attorney - Development Review | 
                
                    | 4/30/2025 1:58:37 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by April Willie on behalf of County Attorney - Development Review | 
                
                    | 4/30/2025 1:58:35 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 4/30/2025 1:58:34 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 4/30/2025 1:58:33 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 4/30/2025 1:58:32 PM | Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by  on behalf of PCD Administrative Notice | 
                
                    | 4/29/2025 11:18:32 AM | Fees paid: 4/29/2025 (Receipt: 1010471) | 
                
                    | 4/18/2025 4:05:40 PM | Payment Request sent: 4/18/2025 | 
                
                    | 4/18/2025 4:05:39 PM | File # Assigned: PUDSP252 | 
                
                    | 4/18/2025 4:05:32 PM | Submission Triaged | 
                
                    | 4/18/2025 11:26:33 AM | Submission received from Applicant | 
                
                    | 4/18/2025 10:57:33 AM | Submission request sent to Applicant | 
                
                    | 2/28/2025 2:00:18 PM | Submission request sent to Applicant | 
                
                    | 2/28/2025 2:00:08 PM | Submission Triaged | 
                
                    | 2/28/2025 11:39:49 AM | Submission received from Applicant | 
                
                    | 2/7/2025 3:29:45 PM | Submission request sent to Applicant | 
                
                    | 2/7/2025 3:16:14 PM | Set Applicant to HR Green Inc. | 
                
                    | 2/7/2025 3:16:03 PM | Set Applicant to HR GREEN | 
                
                    | 2/7/2025 3:08:58 PM | Project Manager Assigned: Ryan Howser | 
                
                    | 2/7/2025 3:08:58 PM | Project Created |