Project Details

Search | All Active Projects


File Number
PUDSP252
Project Name
Flying Horse North PUD/SP Amendment (Major/Filings 6-7)
Parcels
5100000291 5100000291 5100000437 5100000437 5130000002 5130000002 5130000003 5130000003 5130000005 5130000005 5130000006 5130000006 5131000002 5131000002 6136000011 6136000011
Applicant
HR Green Inc.
Blaine Perkins ( blaine.perkins@hrgreen.com )
(719) 394-2430
Blaine Perkins ( blaine.perkins@hrgreen.com )
(719) 394-2430
File Prefix
PUDSP - Combined PUD/Preliminary Plan
Year
2025
Project Manager
Ryan Howser
Status
Active
Created
2/7/2025 3:08:51 PM

View: Review Comments



Additional Documents (7)

Link Document Comment
View Neighbor Notice & Vicinity Map Notice of Application letters were mailed to surrounding property owners on 05/02/2025. JM
View Mailing Labels Mailing Labels for the 84 surrounding property owners that received notices. Cost = $57.96. JM
View Selected Range Selected Range was 500 feet. JM
View Returned Notice 5/12/25
View Returned Notice 5/12/25
View Returned Notice 5/12/25
View meeting 8-5-25


Review Documents (22)

Link Document Date
View Application/Petition Form 2/19/2025 8:24:35 AM
View Landscape Plan drawings 4/17/2025 9:52:57 AM
View Legal Description (MS WORD Version required) 2/19/2025 8:24:37 AM
View Letter of Intent 2/28/2025 11:37:54 AM
View PUD Development Plan - can include phasing if proposed 4/18/2025 11:26:21 AM
View Title Commitment (Current within 30 days of submittal) 4/3/2025 1:47:39 PM
View Zoning Map 2/19/2025 8:29:43 AM
View Colorado Geological Survey Receipt 2/24/2025 10:11:26 AM
View Mineral Rights Certification 2/19/2025 8:24:38 AM
View PCM Applicability Form 2/19/2025 8:29:44 AM
View Electric Provider Commitment Letter 2/19/2025 8:24:35 AM
View Natural Gas Commitment Letter 2/19/2025 8:24:39 AM
View Drainage Report - Preliminary 3/17/2025 3:56:19 PM
View Fire Protection Report 2/19/2025 8:24:36 AM
View Forestry Management Plan 3/17/2025 3:40:02 PM
View Natural Features Report 2/19/2025 8:24:39 AM
View Soils & Geology Report 2/19/2025 8:24:36 AM
View Traffic Impact Study 2/19/2025 8:26:18 AM
View Wastewater Disposal Report 2/19/2025 8:29:41 AM
View Wildland Fire & Hazard Mitigation Plan 3/6/2025 1:15:43 PM
View Water Resources Report 3/28/2025 10:38:31 AM
View Water Supply Information Summary 3/28/2025 10:38:32 AM



Events (137)

Date Comment
7/18/2025 2:25:35 PM Submission request sent to Applicant
7/18/2025 2:25:18 PM Submission Triaged
7/17/2025 5:41:13 PM Submission received from Applicant
6/20/2025 5:37:24 PM Request for Review Comments returned by EPC Health Department
6/17/2025 8:43:45 AM Request for Review Comments returned by Parks Advisory Board
5/30/2025 4:03:48 PM Request for Review Comments returned by EPC Parks Department
5/29/2025 1:35:42 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
5/28/2025 3:07:43 PM Request for Review Comments returned by Colorado Division of Water Resources
5/28/2025 8:20:09 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/23/2025 10:44:12 AM Request for Review Comments returned by Colorado Parks and Wildlife
5/22/2025 4:45:57 PM Submission request sent to Applicant
5/22/2025 4:43:27 PM Request for Review Comments returned by PCD Engineering Division
5/22/2025 1:33:09 PM Request for Review Comments returned by County Attorney - Water
5/22/2025 8:15:32 AM Request for Review Comments returned by EPC Fire and Wildfire Program Manager
5/21/2025 4:41:00 PM Request for Review Comments returned by PCD Project Manager
5/21/2025 3:01:43 PM Request for Review Comments returned by County Attorney - Development Review
5/21/2025 1:17:04 PM Request for Review Comments returned by EPC DPW Stormwater
5/21/2025 8:13:30 AM Request for Review Comments returned by Colorado Springs Public Works
5/20/2025 1:53:03 PM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/20/2025 10:04:14 AM Request for Review Comments returned by Colorado Geological Survey
5/18/2025 6:34:23 PM Request for Review Comments returned by Black Forest Land Use Committee
5/12/2025 1:37:41 PM Request for Review Comments returned by Colorado Springs Planning & Community Development
5/8/2025 10:26:34 AM Request for Review Comments returned by Pikes Peak Regional Building Department
5/7/2025 3:34:50 PM Request for Review Comments returned by Colorado Department of Public Health and Environment
5/7/2025 2:28:02 PM Request for Review Comments returned by EPC Environmental Services
5/6/2025 2:18:17 PM Fees paid: 5/6/2025 (Receipt: 1010500)
5/6/2025 9:35:54 AM Payment Request sent: 5/6/2025
5/5/2025 8:01:22 AM Request for Review Comments returned by Academy SD 20 Building Fund
5/3/2025 8:35:50 PM Request for Review Comments returned by Black Forest Fire Protection District
5/2/2025 3:57:52 PM Request for Review Comments returned by PCD Administrative Notice
5/2/2025 1:25:16 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
5/1/2025 11:11:56 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
4/30/2025 3:18:08 PM Request for Review Comments returned by RBD Floodplain
4/30/2025 2:00:09 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
4/30/2025 2:00:08 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by General Email on behalf of Mountain View Electric Association, Inc.
4/30/2025 2:00:07 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Vicki Wood on behalf of Lewis Palmer 38
4/30/2025 2:00:06 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Melissa Andrews on behalf of Lewis Palmer 38
4/30/2025 2:00:05 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Brett Ridgway on behalf of Lewis Palmer 38
4/30/2025 2:00:03 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Harry Thomas on behalf of El Paso County Conservation Dist
4/30/2025 2:00:02 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Oliver Watkins on behalf of El Paso County Conservation Dist
4/30/2025 2:00:02 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Katie Miller on behalf of El Paso County Conservation Dist
4/30/2025 2:00:00 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Erica Carter on behalf of El Paso County Conservation Dist
4/30/2025 1:59:59 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by on behalf of El Paso County Conservation Dist
4/30/2025 1:59:58 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Mariah Hudson on behalf of El Paso County Conservation Dist
4/30/2025 1:59:57 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Cassie Olgren on behalf of El Paso County Conservation Dist
4/30/2025 1:59:56 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Billy Richard on behalf of El Paso County Conservation Dist
4/30/2025 1:59:55 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
4/30/2025 1:59:54 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/30/2025 1:59:53 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/30/2025 1:59:51 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
4/30/2025 1:59:50 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by LaShunda Simpson on behalf of Colorado Springs Public Works
4/30/2025 1:59:49 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Jonathan Scherer on behalf of Colorado Springs Public Works
4/30/2025 1:59:48 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Joel Dagnillo on behalf of Colorado Springs Public Works
4/30/2025 1:59:47 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Jeff Bailey on behalf of Colorado Springs Public Works
4/30/2025 1:59:46 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Hao Vo on behalf of Colorado Springs Public Works
4/30/2025 1:59:45 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Erin Powers on behalf of Colorado Springs Public Works
4/30/2025 1:59:44 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by General Email on behalf of Colorado Springs Public Works
4/30/2025 1:59:43 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Dana Davison on behalf of Colorado Springs Public Works
4/30/2025 1:59:42 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Brian Shevock on behalf of Colorado Springs Public Works
4/30/2025 1:59:41 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
4/30/2025 1:59:40 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Drew Fox on behalf of Colorado Springs Planning & Community Development
4/30/2025 1:59:39 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
4/30/2025 1:59:38 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
4/30/2025 1:59:37 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Bob Swatek on behalf of Black Hills Energy-Aquila
4/30/2025 1:59:36 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Adam Magoon on behalf of Black Hills Energy-Aquila
4/30/2025 1:59:34 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Cheryl Pixley on behalf of Black Forest Trails Association
4/30/2025 1:59:33 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Terry Stokka on behalf of Black Forest Land Use Committee
4/30/2025 1:59:32 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Terry Stokka on behalf of Black Forest Land Use Committee
4/30/2025 1:59:31 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Rachel Dunn on behalf of Black Forest Fire Protection District
4/30/2025 1:59:30 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Michael Alvarado on behalf of Black Forest Fire Protection District
4/30/2025 1:59:29 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by on behalf of Black Forest Fire Protection District
4/30/2025 1:59:28 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Chad Herdt on behalf of Black Forest Fire Protection District
4/30/2025 1:59:27 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Tom Gregory on behalf of Academy SD 20 Building Fund
4/30/2025 1:59:26 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Donald Smith on behalf of Academy SD 20 Building Fund
4/30/2025 1:59:25 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Becky Allan on behalf of Academy SD 20 Building Fund
4/30/2025 1:59:23 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Keith Curtis on behalf of RBD Floodplain
4/30/2025 1:59:22 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by on behalf of Pikes Peak Regional Building Department
4/30/2025 1:59:21 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
4/30/2025 1:59:20 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
4/30/2025 1:59:19 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Kimberly Wilkes on behalf of US Forest Service, Pikes Peak Ranger District
4/30/2025 1:59:18 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
4/30/2025 1:59:17 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
4/30/2025 1:59:16 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
4/30/2025 1:59:15 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
4/30/2025 1:59:14 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
4/30/2025 1:59:13 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Mike Till on behalf of Colorado State Forest Service
4/30/2025 1:59:11 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Travis Sauder on behalf of Colorado Parks and Wildlife
4/30/2025 1:59:10 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Tim Kroening on behalf of Colorado Parks and Wildlife
4/30/2025 1:59:09 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Karen Voltura on behalf of Colorado Parks and Wildlife
4/30/2025 1:59:08 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
4/30/2025 1:59:07 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
4/30/2025 1:59:06 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
4/30/2025 1:59:05 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Ailis Thyne on behalf of Colorado Division of Water Resources
4/30/2025 1:59:04 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
4/30/2025 1:59:03 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
4/30/2025 1:59:02 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
4/30/2025 1:59:01 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by on behalf of Colorado Department of Public Health and Environment
4/30/2025 1:59:00 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment
4/30/2025 1:58:59 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by on behalf of Parks Advisory Board
4/30/2025 1:58:57 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Jeff Kramer on behalf of EPC Sheriff's Department
4/30/2025 1:58:56 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
4/30/2025 1:58:55 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Andrew Prehm on behalf of EPC Sheriff's Department
4/30/2025 1:58:54 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by on behalf of EPC Public Works, County Engineer
4/30/2025 1:58:53 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by on behalf of EPC Public Works, County Engineer
4/30/2025 1:58:52 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by on behalf of EPC Parks Department
4/30/2025 1:58:51 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Mike McCarthy on behalf of EPC Health Department
4/30/2025 1:58:50 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Catherine McGarvy on behalf of EPC Health Department
4/30/2025 1:58:49 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by HEAEH LandUse on behalf of EPC Health Department
4/30/2025 1:58:48 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Kathy Andrew on behalf of EPC Environmental Services
4/30/2025 1:58:46 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Zachary Jannusch on behalf of EPC DPW Stormwater
4/30/2025 1:58:45 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Mikayla Hartford on behalf of EPC DPW Stormwater
4/30/2025 1:58:44 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Glenn Reese on behalf of EPC DPW Stormwater
4/30/2025 1:58:43 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Christina Prete on behalf of EPC DPW Stormwater
4/30/2025 1:58:42 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Lori Seago on behalf of County Attorney - Water
4/30/2025 1:58:41 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Erika Keech on behalf of County Attorney - Water
4/30/2025 1:58:40 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by April Willie on behalf of County Attorney - Water
4/30/2025 1:58:39 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Lori Seago on behalf of County Attorney - Development Review
4/30/2025 1:58:38 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Erika Keech on behalf of County Attorney - Development Review
4/30/2025 1:58:37 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by April Willie on behalf of County Attorney - Development Review
4/30/2025 1:58:35 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Justin Kilgore on behalf of PCD Project Manager
4/30/2025 1:58:34 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Gilbert LaForce on behalf of PCD Engineering Division
4/30/2025 1:58:33 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by Engineering Manager on behalf of PCD Engineering Division
4/30/2025 1:58:32 PM Request for Review Comments email sent for Project Flying Horse North PUD/SP Amendment (Major/Filings 6-7) for review by on behalf of PCD Administrative Notice
4/29/2025 11:18:32 AM Fees paid: 4/29/2025 (Receipt: 1010471)
4/18/2025 4:05:40 PM Payment Request sent: 4/18/2025
4/18/2025 4:05:39 PM File # Assigned: PUDSP252
4/18/2025 4:05:32 PM Submission Triaged
4/18/2025 11:26:33 AM Submission received from Applicant
4/18/2025 10:57:33 AM Submission request sent to Applicant
2/28/2025 2:00:18 PM Submission request sent to Applicant
2/28/2025 2:00:08 PM Submission Triaged
2/28/2025 11:39:49 AM Submission received from Applicant
2/7/2025 3:29:45 PM Submission request sent to Applicant
2/7/2025 3:16:14 PM Set Applicant to HR Green Inc.
2/7/2025 3:16:03 PM Set Applicant to HR GREEN
2/7/2025 3:08:58 PM Project Manager Assigned: Ryan Howser
2/7/2025 3:08:58 PM Project Created