| 10/30/2025 4:02:16 PM | Submission received from Applicant | 
                
                    | 10/21/2025 4:02:28 PM | Submission request sent to Applicant | 
                
                    | 10/21/2025 4:01:02 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/21/2025 3:58:26 PM | Request for Review Comments email resent for Project Foundation Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 10/21/2025 1:31:20 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 10/20/2025 7:58:59 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 10/16/2025 9:03:29 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/7/2025 8:43:16 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 10/7/2025 8:43:15 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 10/7/2025 8:43:14 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 10/7/2025 8:43:13 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 10/7/2025 8:43:11 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 10/7/2025 8:43:09 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 10/7/2025 8:43:08 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 10/7/2025 8:37:59 AM | Submission Triaged | 
                
                    | 10/6/2025 9:20:46 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 10/2/2025 1:15:38 PM | Submission received from Applicant | 
                
                    | 9/26/2025 10:51:05 AM | Request for Review Comments returned by Black Forest Fire Protection District | 
                
                    | 9/23/2025 11:25:06 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 9/22/2025 5:38:10 PM | Submission request sent to Applicant | 
                
                    | 9/22/2025 5:36:03 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/22/2025 4:51:12 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 9/22/2025 4:47:54 PM | Request for Review Comments email resent for Project Foundation Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 9/22/2025 4:05:32 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 9/16/2025 5:10:46 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 9/15/2025 1:01:47 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 9/9/2025 7:19:34 AM | Request for Review Comments returned by Academy SD 20 Building Fund | 
                
                    | 9/8/2025 1:20:54 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 9/8/2025 10:49:59 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 9/8/2025 10:49:58 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Harry Thomas on behalf of El Paso County Conservation Dist | 
                
                    | 9/8/2025 10:49:57 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist | 
                
                    | 9/8/2025 10:49:56 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Katie Miller on behalf of El Paso County Conservation Dist | 
                
                    | 9/8/2025 10:49:55 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Erica Carter on behalf of El Paso County Conservation Dist | 
                
                    | 9/8/2025 10:49:54 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by  on behalf of El Paso County Conservation Dist | 
                
                    | 9/8/2025 10:49:53 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist | 
                
                    | 9/8/2025 10:49:52 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Cassie Olgren on behalf of El Paso County Conservation Dist | 
                
                    | 9/8/2025 10:49:51 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Billy Richard on behalf of El Paso County Conservation Dist | 
                
                    | 9/8/2025 10:49:50 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila | 
                
                    | 9/8/2025 10:49:49 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila | 
                
                    | 9/8/2025 10:49:48 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 9/8/2025 10:49:47 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila | 
                
                    | 9/8/2025 10:49:46 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Rachel Dunn on behalf of Black Forest Fire Protection District | 
                
                    | 9/8/2025 10:49:45 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Michael Alvarado on behalf of Black Forest Fire Protection District | 
                
                    | 9/8/2025 10:49:44 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by  on behalf of Black Forest Fire Protection District | 
                
                    | 9/8/2025 10:49:43 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Fielding Lucas on behalf of Black Forest Fire Protection District | 
                
                    | 9/8/2025 10:49:42 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Chad Herdt on behalf of Black Forest Fire Protection District | 
                
                    | 9/8/2025 10:49:41 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Tom Gregory on behalf of Academy SD 20 Building Fund | 
                
                    | 9/8/2025 10:49:40 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Donald Smith on behalf of Academy SD 20 Building Fund | 
                
                    | 9/8/2025 10:49:39 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Becky Allan on behalf of Academy SD 20 Building Fund | 
                
                    | 9/8/2025 10:49:37 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 9/8/2025 10:49:36 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 9/8/2025 10:49:35 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 9/8/2025 10:49:34 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 9/8/2025 10:49:33 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 9/8/2025 10:49:32 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by  on behalf of EPC Parks Department | 
                
                    | 9/8/2025 10:49:31 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 9/8/2025 10:49:30 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 9/8/2025 10:49:29 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 9/8/2025 10:49:26 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 9/8/2025 10:49:24 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 9/8/2025 10:49:23 AM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 9/8/2025 10:14:17 AM | Submission Triaged | 
                
                    | 9/6/2025 9:32:35 AM | Submission received from Applicant | 
                
                    | 9/3/2025 1:43:50 PM | Submission request sent to Applicant | 
                
                    | 7/16/2025 5:08:47 PM | Submission request sent to Applicant | 
                
                    | 7/16/2025 5:05:58 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 7/15/2025 12:54:42 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 7/9/2025 9:13:07 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 7/2/2025 2:41:34 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 7/2/2025 2:41:33 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 7/2/2025 2:41:32 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 7/2/2025 2:41:31 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 7/2/2025 2:41:28 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 7/2/2025 2:41:27 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 7/2/2025 2:41:26 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 7/2/2025 2:12:20 PM | Submission Triaged | 
                
                    | 7/2/2025 11:11:25 AM | Submission received from Applicant | 
                
                    | 6/6/2025 4:25:11 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 5/22/2025 3:49:40 PM | Project Manager Assigned: Lacey Dean | 
                
                    | 5/12/2025 8:22:21 AM | Submission request sent to Applicant | 
                
                    | 5/8/2025 2:01:56 PM | Submission request sent to Applicant | 
                
                    | 5/8/2025 1:57:16 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 5/8/2025 1:38:12 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 5/8/2025 11:57:38 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 4/24/2025 12:25:32 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review | 
                
                    | 4/24/2025 12:25:31 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 4/24/2025 12:25:30 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 4/24/2025 12:25:29 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 4/24/2025 12:25:28 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 4/24/2025 12:25:27 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 4/24/2025 12:25:26 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 4/24/2025 12:25:24 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 4/24/2025 12:25:22 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 4/24/2025 12:25:21 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 4/24/2025 12:24:20 PM | Submission Triaged | 
                
                    | 4/23/2025 4:19:29 PM | Submission received from Applicant | 
                
                    | 4/18/2025 2:38:14 PM | Submission request sent to Applicant | 
                
                    | 4/6/2025 6:41:55 AM | Request for Review Comments returned by Black Forest Fire Protection District | 
                
                    | 3/21/2025 11:18:35 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 3/20/2025 3:17:59 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 3/20/2025 1:25:34 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 3/18/2025 12:09:06 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 3/12/2025 12:55:08 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 3/7/2025 9:14:54 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 3/5/2025 7:39:17 AM | Request for Review Comments returned by Academy SD 20 Building Fund | 
                
                    | 3/4/2025 2:28:54 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 3/4/2025 2:28:53 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Harry Thomas on behalf of El Paso County Conservation Dist | 
                
                    | 3/4/2025 2:28:52 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist | 
                
                    | 3/4/2025 2:28:51 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Katie Miller on behalf of El Paso County Conservation Dist | 
                
                    | 3/4/2025 2:28:49 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Erica Carter on behalf of El Paso County Conservation Dist | 
                
                    | 3/4/2025 2:28:48 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by  on behalf of El Paso County Conservation Dist | 
                
                    | 3/4/2025 2:28:47 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist | 
                
                    | 3/4/2025 2:28:46 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Cassie Olgren on behalf of El Paso County Conservation Dist | 
                
                    | 3/4/2025 2:28:45 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Billy Richard on behalf of El Paso County Conservation Dist | 
                
                    | 3/4/2025 2:28:44 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila | 
                
                    | 3/4/2025 2:28:43 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila | 
                
                    | 3/4/2025 2:28:42 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 3/4/2025 2:28:41 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila | 
                
                    | 3/4/2025 2:28:40 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by  on behalf of Black Forest Fire Protection District | 
                
                    | 3/4/2025 2:28:39 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Tom Gregory on behalf of Academy SD 20 Building Fund | 
                
                    | 3/4/2025 2:28:37 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Donald Smith on behalf of Academy SD 20 Building Fund | 
                
                    | 3/4/2025 2:28:36 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Becky Allan on behalf of Academy SD 20 Building Fund | 
                
                    | 3/4/2025 2:28:35 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by  on behalf of Pikes Peak Regional Building Department | 
                
                    | 3/4/2025 2:28:34 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 3/4/2025 2:28:33 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 3/4/2025 2:28:32 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 3/4/2025 2:28:31 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by  on behalf of EPC Parks Department | 
                
                    | 3/4/2025 2:28:30 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 3/4/2025 2:28:29 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 3/4/2025 2:28:28 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 3/4/2025 2:28:26 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager | 
                
                    | 3/4/2025 2:28:24 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 3/4/2025 2:28:23 PM | Request for Review Comments email sent for Project Foundation Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 3/4/2025 12:51:04 PM | Project Manager Assigned: Ashlyn Mathy | 
                
                    | 3/4/2025 12:11:53 PM | Fees paid: 3/4/2025 (Receipt: 1010229) | 
                
                    | 2/26/2025 10:10:00 AM | Payment Request sent: 2/26/2025 | 
                
                    | 2/26/2025 10:10:00 AM | File # Assigned: PPR258 | 
                
                    | 2/26/2025 10:09:53 AM | Submission Triaged | 
                
                    | 2/26/2025 5:36:59 AM | Submission received from Applicant | 
                
                    | 2/25/2025 4:52:20 PM | Submission request sent to Applicant | 
                
                    | 2/25/2025 4:52:02 PM | Submission Triaged | 
                
                    | 2/25/2025 4:19:38 PM | Submission received from Applicant | 
                
                    | 12/27/2024 7:31:02 AM | Submission request sent to Applicant | 
                
                    | 12/11/2024 5:09:50 PM | Project Manager Assigned: Ryan Howser | 
                
                    | 12/11/2024 5:09:50 PM | Project Created |