9/15/2025 11:23:17 AM
|
Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
9/15/2025 8:50:07 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/15/2025 8:47:44 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/12/2025 12:47:20 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/12/2025 12:26:37 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/10/2025 4:31:21 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
9/10/2025 4:27:16 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
9/10/2025 4:14:01 PM
|
Request for Review Comments returned by RBD Floodplain
|
9/10/2025 3:50:34 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Travis Jones on behalf of Widefield Water & San
|
9/10/2025 3:50:33 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Rob Banister on behalf of Widefield Water & San
|
9/10/2025 3:50:32 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Travis Jones on behalf of Widefield Water & San
|
9/10/2025 3:50:31 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Dave Gish on behalf of Widefield SD 3
|
9/10/2025 3:50:30 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Tracy Doran on behalf of Upper Big Sandy GWMD
|
9/10/2025 3:50:29 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Susan Davies on behalf of Trails and Open Space Coalition
|
9/10/2025 3:50:28 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Rickie Cooper on behalf of Security Fire Protection District
|
9/10/2025 3:50:27 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Mark Stanwood on behalf of Security Fire Protection District
|
9/10/2025 3:50:26 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Jason Caddick on behalf of Security Fire Protection District
|
9/10/2025 3:50:24 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
9/10/2025 3:50:23 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Steve White on behalf of Mountain Metro Transit (City of COS)
|
9/10/2025 3:50:22 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
9/10/2025 3:50:21 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Gary Steen on behalf of Fountain Mutual Irrigation Company
|
9/10/2025 3:50:20 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
9/10/2025 3:50:19 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/10/2025 3:50:18 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/10/2025 3:50:16 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
|
9/10/2025 3:50:15 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by LaShunda Simpson on behalf of Colorado Springs Public Works
|
9/10/2025 3:50:15 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Jonathan Scherer on behalf of Colorado Springs Public Works
|
9/10/2025 3:50:14 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Joel Dagnillo on behalf of Colorado Springs Public Works
|
9/10/2025 3:50:13 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Jeff Bailey on behalf of Colorado Springs Public Works
|
9/10/2025 3:50:12 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Hao Vo on behalf of Colorado Springs Public Works
|
9/10/2025 3:50:11 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Erin Powers on behalf of Colorado Springs Public Works
|
9/10/2025 3:50:10 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by General Email on behalf of Colorado Springs Public Works
|
9/10/2025 3:50:08 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Dana Davison on behalf of Colorado Springs Public Works
|
9/10/2025 3:50:07 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Brian Shevock on behalf of Colorado Springs Public Works
|
9/10/2025 3:50:06 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Tamara Baxter on behalf of Colorado Springs Planning & Community Development
|
9/10/2025 3:50:05 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Drew Fox on behalf of Colorado Springs Planning & Community Development
|
9/10/2025 3:50:04 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
|
9/10/2025 3:50:03 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
9/10/2025 3:50:02 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
9/10/2025 3:50:01 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
9/10/2025 3:50:00 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
9/10/2025 3:50:00 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Travis Jones on behalf of Widefield Water & San
|
9/10/2025 3:49:59 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Keith Curtis on behalf of RBD Floodplain
|
9/10/2025 3:49:58 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Rob Banister on behalf of Widefield Water & San
|
9/10/2025 3:49:57 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by on behalf of Pikes Peak Regional Building Department
|
9/10/2025 3:49:57 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Travis Jones on behalf of Widefield Water & San
|
9/10/2025 3:49:56 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/10/2025 3:49:56 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Dave Gish on behalf of Widefield SD 3
|
9/10/2025 3:49:55 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
9/10/2025 3:49:55 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Tracy Doran on behalf of Upper Big Sandy GWMD
|
9/10/2025 3:49:54 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Susan Davies on behalf of Trails and Open Space Coalition
|
9/10/2025 3:49:54 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
9/10/2025 3:49:53 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Rickie Cooper on behalf of Security Fire Protection District
|
9/10/2025 3:49:53 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
9/10/2025 3:49:52 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Mark Stanwood on behalf of Security Fire Protection District
|
9/10/2025 3:49:52 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
9/10/2025 3:49:51 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Jason Caddick on behalf of Security Fire Protection District
|
9/10/2025 3:49:50 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
9/10/2025 3:49:49 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
9/10/2025 3:49:49 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Mike Till on behalf of Colorado State Forest Service
|
9/10/2025 3:49:48 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Steve White on behalf of Mountain Metro Transit (City of COS)
|
9/10/2025 3:49:48 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
9/10/2025 3:49:47 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
9/10/2025 3:49:47 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
9/10/2025 3:49:46 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Gary Steen on behalf of Fountain Mutual Irrigation Company
|
9/10/2025 3:49:46 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Peter Chapman on behalf of Colorado Parks and Wildlife
|
9/10/2025 3:49:45 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
9/10/2025 3:49:45 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
9/10/2025 3:49:44 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
|
9/10/2025 3:49:44 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/10/2025 3:49:42 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/10/2025 3:49:42 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
9/10/2025 3:49:41 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Javier Vargas-Johnson on behalf of Colorado Division of Water Resources
|
9/10/2025 3:49:41 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
|
9/10/2025 3:49:40 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Ailis Thyne on behalf of Colorado Division of Water Resources
|
9/10/2025 3:49:40 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by LaShunda Simpson on behalf of Colorado Springs Public Works
|
9/10/2025 3:49:39 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
9/10/2025 3:49:39 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Jonathan Scherer on behalf of Colorado Springs Public Works
|
9/10/2025 3:49:38 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
9/10/2025 3:49:38 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Joel Dagnillo on behalf of Colorado Springs Public Works
|
9/10/2025 3:49:37 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
9/10/2025 3:49:37 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Jeff Bailey on behalf of Colorado Springs Public Works
|
9/10/2025 3:49:36 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by General Email on behalf of Mountain View Electric Association, Inc.
|
9/10/2025 3:49:36 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Hao Vo on behalf of Colorado Springs Public Works
|
9/10/2025 3:49:35 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by on behalf of Parks Advisory Board
|
9/10/2025 3:49:35 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Erin Powers on behalf of Colorado Springs Public Works
|
9/10/2025 3:49:34 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by General Email on behalf of Colorado Springs Public Works
|
9/10/2025 3:49:34 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
9/10/2025 3:49:33 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Dana Davison on behalf of Colorado Springs Public Works
|
9/10/2025 3:49:33 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
9/10/2025 3:49:32 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
9/10/2025 3:49:32 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Brian Shevock on behalf of Colorado Springs Public Works
|
9/10/2025 3:49:31 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Tamara Baxter on behalf of Colorado Springs Planning & Community Development
|
9/10/2025 3:49:31 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by on behalf of EPC Parks Department
|
9/10/2025 3:49:30 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Drew Fox on behalf of Colorado Springs Planning & Community Development
|
9/10/2025 3:49:30 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Mike McCarthy on behalf of EPC Health Department
|
9/10/2025 3:49:29 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
|
9/10/2025 3:49:29 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Catherine McGarvy on behalf of EPC Health Department
|
9/10/2025 3:49:28 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by HEAEH LandUse on behalf of EPC Health Department
|
9/10/2025 3:49:28 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
9/10/2025 3:49:26 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Kathy Andrew on behalf of EPC Environmental Services
|
9/10/2025 3:49:26 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
9/10/2025 3:49:25 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
9/10/2025 3:49:25 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Zachary Jannusch on behalf of EPC DPW Stormwater
|
9/10/2025 3:49:24 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
9/10/2025 3:49:24 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Mikayla Hartford on behalf of EPC DPW Stormwater
|
9/10/2025 3:49:23 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Keith Curtis on behalf of RBD Floodplain
|
9/10/2025 3:49:23 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Glenn Reese on behalf of EPC DPW Stormwater
|
9/10/2025 3:49:22 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Christina Prete on behalf of EPC DPW Stormwater
|
9/10/2025 3:49:22 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by on behalf of Pikes Peak Regional Building Department
|
9/10/2025 3:49:21 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/10/2025 3:49:21 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Lori Seago on behalf of County Attorney - Water
|
9/10/2025 3:49:20 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
9/10/2025 3:49:20 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Erika Keech on behalf of County Attorney - Water
|
9/10/2025 3:49:19 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by April Willie on behalf of County Attorney - Water
|
9/10/2025 3:49:19 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Travis Jones on behalf of Widefield Water & San
|
9/10/2025 3:49:19 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
9/10/2025 3:49:18 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Rob Banister on behalf of Widefield Water & San
|
9/10/2025 3:49:18 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Lori Seago on behalf of County Attorney - Development Review
|
9/10/2025 3:49:18 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
9/10/2025 3:49:17 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Travis Jones on behalf of Widefield Water & San
|
9/10/2025 3:49:17 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Erika Keech on behalf of County Attorney - Development Review
|
9/10/2025 3:49:17 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
9/10/2025 3:49:16 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Dave Gish on behalf of Widefield SD 3
|
9/10/2025 3:49:16 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by April Willie on behalf of County Attorney - Development Review
|
9/10/2025 3:49:15 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
9/10/2025 3:49:15 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Tracy Doran on behalf of Upper Big Sandy GWMD
|
9/10/2025 3:49:14 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Mike Till on behalf of Colorado State Forest Service
|
9/10/2025 3:49:13 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Susan Davies on behalf of Trails and Open Space Coalition
|
9/10/2025 3:49:13 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Justin Kilgore on behalf of PCD Project Manager
|
9/10/2025 3:49:13 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
9/10/2025 3:49:12 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Rickie Cooper on behalf of Security Fire Protection District
|
9/10/2025 3:49:12 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Gilbert LaForce on behalf of PCD Engineering Division
|
9/10/2025 3:49:12 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
9/10/2025 3:49:11 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Mark Stanwood on behalf of Security Fire Protection District
|
9/10/2025 3:49:11 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Peter Chapman on behalf of Colorado Parks and Wildlife
|
9/10/2025 3:49:11 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Engineering Manager on behalf of PCD Engineering Division
|
9/10/2025 3:49:10 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Jason Caddick on behalf of Security Fire Protection District
|
9/10/2025 3:49:10 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
9/10/2025 3:49:09 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
9/10/2025 3:49:09 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
|
9/10/2025 3:49:08 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Steve White on behalf of Mountain Metro Transit (City of COS)
|
9/10/2025 3:49:07 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
9/10/2025 3:49:06 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Gary Steen on behalf of Fountain Mutual Irrigation Company
|
9/10/2025 3:49:04 PM
|
Request for Review Comments email sent for Project Rolling Meadows / Bull Hill Phase 1 PUDSP for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
|
9/10/2025 8:19:25 AM
|
Project Manager Assigned: Kylie Bagley
|
9/10/2025 7:20:12 AM
|
Project Manager Assigned: Ryan Howser
|
9/9/2025 1:12:33 PM
|
Fees paid: 9/9/2025 (Receipt: 1011018)
|
9/9/2025 11:49:15 AM
|
Payment Request sent: 9/9/2025
|
9/9/2025 11:49:14 AM
|
File # Assigned: PUDSP255
|
9/9/2025 11:49:13 AM
|
Submission Triaged
|
9/9/2025 10:34:20 AM
|
Submission received from Applicant
|
9/24/2024 5:24:51 PM
|
Submission request sent to Applicant
|
9/18/2024 3:18:37 PM
|
Project Manager Assigned: Ryan Howser
|
9/18/2024 3:18:37 PM
|
EA Assigned: EA24102
|
9/18/2024 3:18:37 PM
|
Project Created
|