8/7/2025 9:58:08 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
8/5/2025 9:24:06 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by on behalf of Pikes Peak Regional Building Department
|
8/5/2025 9:24:05 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
8/5/2025 9:24:04 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
8/5/2025 9:24:02 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Justin Kilgore on behalf of PCD Project Manager
|
8/5/2025 9:22:33 AM
|
Submission Triaged
|
7/28/2025 2:27:59 PM
|
Submission received from Applicant
|
7/15/2025 7:54:15 AM
|
Submission request sent to Applicant
|
7/11/2025 6:15:22 PM
|
Request for Review Comments returned by EPC Health Department
|
7/9/2025 10:15:18 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Mike McCarthy on behalf of EPC Health Department
|
7/9/2025 10:15:17 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Catherine McGarvy on behalf of EPC Health Department
|
7/9/2025 10:15:16 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by HEAEH LandUse on behalf of EPC Health Department
|
7/9/2025 10:14:26 AM
|
Submission Triaged
|
7/9/2025 9:57:23 AM
|
Submission received from Applicant
|
7/9/2025 8:26:34 AM
|
Submission request sent to Applicant
|
7/3/2025 12:46:38 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/2/2025 9:50:31 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
7/2/2025 8:29:05 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/25/2025 10:04:23 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/23/2025 1:39:12 PM
|
Request for Review Comments returned by Falcon School District 49
|
6/23/2025 11:13:55 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
6/19/2025 7:06:03 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Evelyn galanephillips on behalf of Falcon School District 49
|
6/19/2025 7:06:02 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by on behalf of Pikes Peak Regional Building Department
|
6/19/2025 7:06:01 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
6/19/2025 7:06:00 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
6/19/2025 7:05:59 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Mike McCarthy on behalf of EPC Health Department
|
6/19/2025 7:05:58 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Catherine McGarvy on behalf of EPC Health Department
|
6/19/2025 7:05:57 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by HEAEH LandUse on behalf of EPC Health Department
|
6/19/2025 7:05:55 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Lori Seago on behalf of County Attorney - Development Review
|
6/19/2025 7:05:54 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Erika Keech on behalf of County Attorney - Development Review
|
6/19/2025 7:05:53 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by April Willie on behalf of County Attorney - Development Review
|
6/19/2025 7:05:51 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Justin Kilgore on behalf of PCD Project Manager
|
6/19/2025 7:05:48 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/19/2025 7:05:47 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Engineering Manager on behalf of PCD Engineering Division
|
6/19/2025 7:03:46 AM
|
Submission Triaged
|
6/19/2025 6:47:32 AM
|
Submission received from Applicant
|
6/18/2025 4:34:58 PM
|
Submission request sent to Applicant
|
6/18/2025 4:34:28 PM
|
Submission Triaged
|
6/18/2025 2:26:59 PM
|
Submission received from Applicant
|
5/22/2025 1:23:02 PM
|
Project Manager Assigned: Ryan Howser
|
5/14/2025 10:53:59 AM
|
Submission request sent to Applicant
|
5/13/2025 1:20:27 PM
|
Request for Review Comments returned by County Attorney - Water
|
5/13/2025 1:10:35 PM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Lori Seago on behalf of County Attorney - Water
|
5/13/2025 1:10:34 PM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Erika Keech on behalf of County Attorney - Water
|
5/13/2025 1:10:33 PM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by April Willie on behalf of County Attorney - Water
|
5/12/2025 10:28:58 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/12/2025 9:23:21 AM
|
Submission request sent to Applicant
|
5/11/2025 9:22:52 PM
|
Request for Review Comments returned by County Attorney - Water
|
5/7/2025 1:13:56 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/6/2025 2:52:57 PM
|
Submission request sent to Applicant
|
5/6/2025 2:27:48 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/6/2025 11:32:18 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/29/2025 8:16:09 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by on behalf of Pikes Peak Regional Building Department
|
4/29/2025 8:16:07 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Lori Seago on behalf of County Attorney - Water
|
4/29/2025 8:16:06 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Erika Keech on behalf of County Attorney - Water
|
4/29/2025 8:16:05 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by April Willie on behalf of County Attorney - Water
|
4/29/2025 8:16:04 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Lori Seago on behalf of County Attorney - Development Review
|
4/29/2025 8:16:03 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Erika Keech on behalf of County Attorney - Development Review
|
4/29/2025 8:16:02 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by April Willie on behalf of County Attorney - Development Review
|
4/29/2025 8:16:01 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Justin Kilgore on behalf of PCD Project Manager
|
4/29/2025 8:15:58 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/29/2025 8:15:57 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Engineering Manager on behalf of PCD Engineering Division
|
4/29/2025 8:14:06 AM
|
Submission Triaged
|
4/28/2025 5:10:39 PM
|
Submission received from Applicant
|
4/22/2025 1:08:57 PM
|
Submission request sent to Applicant
|
4/22/2025 1:06:26 PM
|
Submission request sent to Applicant
|
4/22/2025 1:05:18 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/22/2025 12:38:36 PM
|
Request for Review Comments returned by County Attorney - Water
|
4/21/2025 2:46:35 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/15/2025 12:44:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/10/2025 7:44:59 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Lori Seago on behalf of County Attorney - Water
|
4/10/2025 7:44:58 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Erika Keech on behalf of County Attorney - Water
|
4/10/2025 7:44:57 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by April Willie on behalf of County Attorney - Water
|
4/10/2025 7:44:56 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Lori Seago on behalf of County Attorney - Development Review
|
4/10/2025 7:44:55 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Erika Keech on behalf of County Attorney - Development Review
|
4/10/2025 7:44:54 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by April Willie on behalf of County Attorney - Development Review
|
4/10/2025 7:44:52 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Justin Kilgore on behalf of PCD Project Manager
|
4/10/2025 7:44:49 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/10/2025 7:44:48 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Engineering Manager on behalf of PCD Engineering Division
|
4/10/2025 7:43:40 AM
|
Submission Triaged
|
4/9/2025 2:23:05 PM
|
Submission received from Applicant
|
4/9/2025 9:08:24 AM
|
Submission request sent to Applicant
|
4/9/2025 9:07:34 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/8/2025 5:31:01 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/8/2025 2:07:29 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/25/2025 8:56:43 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/25/2025 8:56:42 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/25/2025 8:56:41 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Christina Prete on behalf of EPC Stormwater Review
|
3/25/2025 8:56:40 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Justin Kilgore on behalf of PCD Project Manager
|
3/25/2025 8:56:37 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/25/2025 8:56:36 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Engineering Manager on behalf of PCD Engineering Division
|
3/25/2025 8:15:45 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/25/2025 8:15:44 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/25/2025 8:15:44 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Christina Prete on behalf of EPC Stormwater Review
|
3/25/2025 8:15:42 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Justin Kilgore on behalf of PCD Project Manager
|
3/25/2025 8:15:39 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/25/2025 8:15:38 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Engineering Manager on behalf of PCD Engineering Division
|
3/25/2025 8:01:49 AM
|
Submission Triaged
|
3/24/2025 9:12:47 AM
|
Submission received from Applicant
|
3/21/2025 9:50:28 AM
|
Request for Review Comments returned by County Attorney - Water
|
3/6/2025 11:50:01 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Lori Seago on behalf of County Attorney - Water
|
3/6/2025 11:50:00 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by Erika Keech on behalf of County Attorney - Water
|
3/6/2025 11:49:59 AM
|
Request for Review Comments email sent for Project Team Chris Subdivision (Final Plat) for review by April Willie on behalf of County Attorney - Water
|
3/5/2025 1:30:26 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/4/2025 11:48:18 AM
|
Submission request sent to Applicant
|
3/4/2025 11:47:36 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/4/2025 11:47:08 AM
|
Request for Review Comments email resent for Project Team Chris Subdivision (Final Plat) for review by Justin Kilgore on behalf of PCD Project Manager
|
3/4/2025 11:44:46 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/3/2025 5:12:28 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/3/2025 9:30:39 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
3/3/2025 9:30:38 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/27/2025 2:12:31 PM
|
Submission Triaged
|
2/27/2025 1:42:21 PM
|
Submission received from Applicant
|
2/27/2025 12:02:11 PM
|
Submission request sent to Applicant
|
2/26/2025 3:17:32 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/24/2025 10:20:19 AM
|
Request for Review Comments returned by County Attorney - Water
|
2/14/2025 7:50:39 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
2/14/2025 7:50:38 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Glenn Reese on behalf of EPC Stormwater Review
|
2/14/2025 7:50:37 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Christina Prete on behalf of EPC Stormwater Review
|
2/14/2025 7:50:36 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Lori Seago on behalf of County Attorney - Water
|
2/14/2025 7:50:35 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Erika Keech on behalf of County Attorney - Water
|
2/14/2025 7:50:34 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by April Willie on behalf of County Attorney - Water
|
2/14/2025 7:50:33 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Justin Kilgore on behalf of PCD Project Manager
|
2/14/2025 7:50:29 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Gilbert LaForce on behalf of PCD Engineering Division
|
2/14/2025 7:50:29 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Engineering Manager on behalf of PCD Engineering Division
|
2/14/2025 7:17:14 AM
|
Submission Triaged
|
2/14/2025 6:50:53 AM
|
Submission received from Applicant
|
1/27/2025 10:17:28 AM
|
Submission request sent to Applicant
|
1/10/2025 5:09:38 PM
|
Request for Review Comments returned by EPC Health Department
|
12/23/2024 12:26:42 PM
|
Submission request sent to Applicant
|
12/23/2024 12:25:31 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/23/2024 12:19:06 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/18/2024 2:18:26 PM
|
Submission Triaged
|
12/18/2024 10:57:18 AM
|
Submission received from Applicant
|
12/17/2024 1:43:13 PM
|
Submission request sent to Applicant
|
12/17/2024 1:42:07 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/17/2024 11:59:59 AM
|
Request for Review Comments returned by County Attorney - Water
|
12/16/2024 4:01:47 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/10/2024 8:13:22 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Jackie Evans on behalf of Kiowa Conservation Dist
|
12/10/2024 8:13:20 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
12/10/2024 8:13:18 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
12/10/2024 8:13:16 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
12/10/2024 8:13:14 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
12/10/2024 8:13:12 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Robert Schorr on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/10/2024 8:13:10 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/10/2024 8:13:08 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/10/2024 8:13:06 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
12/10/2024 8:13:04 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
12/10/2024 8:13:02 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
12/10/2024 8:13:01 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
12/10/2024 8:12:57 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
|
12/10/2024 8:12:55 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
12/10/2024 8:12:53 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/10/2024 8:12:49 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
12/10/2024 8:12:47 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Glenn Reese on behalf of EPC Stormwater Review
|
12/10/2024 8:12:45 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Christina Prete on behalf of EPC Stormwater Review
|
12/10/2024 8:12:43 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
12/10/2024 8:12:41 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
12/10/2024 8:12:39 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
12/10/2024 8:12:37 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Mike McCarthy on behalf of EPC Health Department
|
12/10/2024 8:12:35 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Catherine McGarvy on behalf of EPC Health Department
|
12/10/2024 8:12:33 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by HEAEH LandUse on behalf of EPC Health Department
|
12/10/2024 8:12:30 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Jim Schanel on behalf of EPC Fire Marshal
|
12/10/2024 8:12:28 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Lori Seago on behalf of County Attorney - Water
|
12/10/2024 8:12:26 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Erika Keech on behalf of County Attorney - Water
|
12/10/2024 8:12:24 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by April Willie on behalf of County Attorney - Water
|
12/10/2024 8:12:22 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Justin Kilgore on behalf of PCD Project Manager
|
12/10/2024 8:12:14 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/10/2024 8:12:13 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Engineering Manager on behalf of PCD Engineering Division
|
12/10/2024 8:07:45 AM
|
Submission Triaged
|
12/9/2024 4:03:05 PM
|
Submission received from Applicant
|
11/12/2024 1:21:00 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
11/5/2024 8:41:48 AM
|
Submission request sent to Applicant
|
11/5/2024 8:39:27 AM
|
Request for Review Comments returned by PCD Project Manager
|
11/4/2024 5:26:44 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/4/2024 5:09:34 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
11/4/2024 3:47:46 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/4/2024 1:55:55 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
11/1/2024 9:04:49 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
10/31/2024 11:57:31 AM
|
Request for Review Comments returned by Falcon School District 49
|
10/29/2024 7:46:21 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/28/2024 11:37:53 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/28/2024 8:07:56 AM
|
Request for Review Comments returned by Colorado State Forest Service
|
10/23/2024 11:04:32 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
10/18/2024 1:20:34 PM
|
Request for Review Comments returned by Parks Advisory Board
|
10/18/2024 1:19:48 PM
|
Request for Review Comments returned by EPC Parks Department
|
10/18/2024 9:48:45 AM
|
Request for Review Comments returned by EPC Environmental Services
|
10/17/2024 5:12:42 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/16/2024 10:04:07 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
10/15/2024 3:30:58 PM
|
Request for Review Comments returned by County Attorney - Water
|
10/15/2024 9:24:12 AM
|
Request for Review Comments returned by US Forest Service, Pikes Peak Ranger District
|
10/14/2024 8:04:51 PM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
10/14/2024 12:23:05 PM
|
Request for Review Comments returned by Road Impact Fee Administrator
|
10/14/2024 11:51:13 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
10/14/2024 11:29:45 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by General Email on behalf of Mountain View Electric Association, Inc.
|
10/14/2024 11:29:43 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Jackie Evans on behalf of Kiowa Conservation Dist
|
10/14/2024 11:29:41 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Evelyn galanephillips on behalf of Falcon School District 49
|
10/14/2024 11:29:39 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Trent Harwig on behalf of Falcon Fire Protection District
|
10/14/2024 11:29:37 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Curtis Kauffman on behalf of Falcon Fire Protection District
|
10/14/2024 11:29:35 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Harry Thomas on behalf of El Paso County Conservation Dist
|
10/14/2024 11:29:34 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Oliver Watkins on behalf of El Paso County Conservation Dist
|
10/14/2024 11:29:32 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Katie Miller on behalf of El Paso County Conservation Dist
|
10/14/2024 11:29:30 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Erica Carter on behalf of El Paso County Conservation Dist
|
10/14/2024 11:29:28 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
10/14/2024 11:29:26 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Cassie Olgren on behalf of El Paso County Conservation Dist
|
10/14/2024 11:29:24 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Billy Richard on behalf of El Paso County Conservation Dist
|
10/14/2024 11:29:22 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
10/14/2024 11:29:20 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
10/14/2024 11:29:18 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
10/14/2024 11:29:16 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
10/14/2024 11:29:14 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
10/14/2024 11:29:12 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
10/14/2024 11:29:10 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
10/14/2024 11:29:08 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by on behalf of Pikes Peak Regional Building Department
|
10/14/2024 11:29:06 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/14/2024 11:29:04 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
10/14/2024 11:29:02 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Kimberly Wilkes on behalf of US Forest Service, Pikes Peak Ranger District
|
10/14/2024 11:29:01 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
|
10/14/2024 11:28:59 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
10/14/2024 11:28:57 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
10/14/2024 11:28:55 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
10/14/2024 11:28:53 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Andy Schlosberg on behalf of Colorado State Forest Service
|
10/14/2024 11:28:51 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
10/14/2024 11:28:49 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
10/14/2024 11:28:47 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
10/14/2024 11:28:45 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
10/14/2024 11:28:43 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/14/2024 11:28:41 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
10/14/2024 11:28:39 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
10/14/2024 11:28:37 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
10/14/2024 11:28:35 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
10/14/2024 11:28:34 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
10/14/2024 11:28:32 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
10/14/2024 11:28:30 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by on behalf of Parks Advisory Board
|
10/14/2024 11:28:28 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
10/14/2024 11:28:26 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Glenn Reese on behalf of EPC Stormwater Review
|
10/14/2024 11:28:24 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Christina Prete on behalf of EPC Stormwater Review
|
10/14/2024 11:28:22 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
10/14/2024 11:28:20 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
10/14/2024 11:28:18 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
10/14/2024 11:28:16 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by on behalf of EPC Parks Department
|
10/14/2024 11:28:14 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Mike McCarthy on behalf of EPC Health Department
|
10/14/2024 11:28:13 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Catherine McGarvy on behalf of EPC Health Department
|
10/14/2024 11:28:11 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by HEAEH LandUse on behalf of EPC Health Department
|
10/14/2024 11:28:09 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Jim Schanel on behalf of EPC Fire Marshal
|
10/14/2024 11:28:07 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/14/2024 11:28:05 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Lori Seago on behalf of County Attorney - Water
|
10/14/2024 11:28:03 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Erika Keech on behalf of County Attorney - Water
|
10/14/2024 11:28:01 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by April Willie on behalf of County Attorney - Water
|
10/14/2024 11:27:59 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Lori Seago on behalf of County Attorney - Development Review
|
10/14/2024 11:27:57 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Erika Keech on behalf of County Attorney - Development Review
|
10/14/2024 11:27:55 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by April Willie on behalf of County Attorney - Development Review
|
10/14/2024 11:27:53 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Kari Parsons on behalf of PCD Project Manager
|
10/14/2024 11:27:49 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Gilbert LaForce on behalf of PCD Engineering Division
|
10/14/2024 11:27:47 AM
|
Request for Review Comments email sent for Project 18412-18440 Black Squirrel Rd Minor Sub for review by Engineering Manager on behalf of PCD Engineering Division
|
10/10/2024 2:08:58 PM
|
Fees paid: 10/10/2024 (Receipt: 1009697)
|
10/7/2024 1:06:06 PM
|
Payment Request sent: 10/7/2024
|
10/7/2024 1:06:05 PM
|
File # Assigned: SF2426
|
10/7/2024 1:05:58 PM
|
Submission Triaged
|
10/7/2024 10:24:51 AM
|
Submission received from Applicant
|
10/7/2024 9:34:39 AM
|
Submission request sent to Applicant
|
10/7/2024 9:34:27 AM
|
Submission Triaged
|
10/7/2024 8:03:36 AM
|
Submission received from Applicant
|
10/4/2024 2:54:16 PM
|
Submission request sent to Applicant
|
10/4/2024 2:53:33 PM
|
Submission Triaged
|
10/4/2024 6:59:44 AM
|
Submission received from Applicant
|
6/26/2024 9:16:50 AM
|
Submission request sent to Applicant
|
6/25/2024 8:22:22 AM
|
Submission request sent to Applicant
|
11/16/2023 10:52:57 AM
|
Submission request sent to Applicant
|
11/6/2023 9:00:01 AM
|
Project Manager Assigned: Ashlyn Mathy
|
11/6/2023 9:00:01 AM
|
EA Assigned: EA23103
|
11/6/2023 9:00:01 AM
|
Project Created
|