File Number
AASI231
Project Name
Colorado's Xcel Power Pathway 1041
Description
Electrical facilities proposed in El Paso County include 44 miles of 345 kilovolt double-circuit overhead transmission line to support wind and solar energy development. In service 2027 Segment 5 of overall project. 105-199 feet tall poles, 950-feet between steel poles within 150 foot Electrical transmission ROW. Concrete batch plants are included.Public Service Company of Colorado (PSCo), a Colorado corporation conducting business as Xcel Energy, is seeking approval of a permit to locate and construct major facilities of a public utility (1041 permit) from El Paso County to construct and operate a portion of Colorado’s Power Pathway (Pathway) located in El Paso County. Pathway is a $1.7 billion investment to improve the state’s electric grid and enable future renewable energy development around the state. Pathway will increase electric reliability, boost the regional economy, and create jobs during construction. Pathway includes: • Installation of approximately 550 miles of new 345-kilovolt (kV) double-circuit transmission line in 12 counties; • Construction of four new electric substations (Canal Crossing, Goose Creek, May Valley, and Sandstone); and • Expansion, equipment additions, or equipment upgrades at four existing electric substations (Fort St. Vrain, Pawnee, Harvest Mile, and Tundra). Pathway will be constructed in five segments. Each new or expanded electric substation will serve as an endpoint for the transmission line segments: • Fort St. Vrain – Canal Crossing (Segment 1) • Canal Crossing – Goose Creek (Segment 2) • Goose Creek – May Valley (Segment 3) • May Valley – Sandstone – Tundra (Segment 4) • Sandstone– Harvest Mile (Segment 5) Pathway facilities proposed in El Paso County include 45 miles of 345-kV transmission line within Segment 5. The proposed route in El Paso County is generally oriented in a north to south direction in the area south of Simla, near the El Paso/Lincoln county line.
Location
Eastern El Paso County
Applicant
Public Service Company of Colorado, a Colorado corporation conducting business as Xcel Energy
Tiffany Hennig ( tiffany.a.hennig@xcelenergy.com )
(806) 378-2146
Tiffany Hennig ( tiffany.a.hennig@xcelenergy.com )
(806) 378-2146
EA Number
EA2382
File Prefix
AASI - Areas and Activities of State Interest
Year
2023
Project Manager
Kari Parsons
Status
Closed
Created
8/24/2023 10:37:11 AM

View: Review Comments



Additional Documents (69)

Link Document Comment
View Notice of Application w/ Vicinity Map "Notice of Application" letters were mailed by PCD on 8/19/2024. MB
View Selected Range Selected Range was 500 feet. MB
View Mailing Labels Mailing Labels for the surrounding 86 addresses which received a notice. Cost billed to applicant = $59.34. MB
View Returned Mail - 8/26/2024
View Returned Mail - 8/28/2024
View Returned Mail - 9/3/24
View Public Comment Gardner, Jeremy C - Opposition - Received 9-4-2024.
View Returned Mail - 9/9/24
View Returned Mail - 9/9/24
View Jackie Thompson Comments
View Comments Jackie Thompson No. 2
View P Brook Opposition
View Returned Mail - 9/13/24
View P Reinbold Email and Petition Opposition
View J Thompson Pdf Comment Opposition 1
View J Thompson Pdf Comment Opposition 2
View Public Comment Reinbold, Paula - Opposition - Received 9-13-2024.
View Knox Comments
View Returned mail AASI231 Returned 9/23/2024
View Public Comment Knox, Greg - Opposition - Received 9-18-2024
View JGardner Opposition 2/18/2025
View Salmans Comments 2 25 2025
View Salmans Comments No 2 2 25 25
View PSCO Letter 4 10 25 emailed to staff
View TriCounty Fire Comments 4 23 2025 changes requested
View 5.201 Fire Program Comments
View Fire Letter Fire Program Comments
View ER Response Fire Program Comments
View Hearing Notice & Vicinity Map Hearing notice for Board of County Commissioner Hearing on 07/08/2025. JM
View Mailing Labels Mailing Labels for the 273 surrounding property owners that received notices. PCD mailed the letters on 06/11/2025. Cost = $188.37. JM
View Returned Notice - 6/18/25
View Returned Notice - 6/18/25
View Affidavit of Published Legal Advertisement Published in The Gazette on 06/13/2025 for the Board of County Commissioners Hearing on 07/08/2025. JM
View Hearing Notice & Vicinity Map Hearing notice for Board of County Commissioner Hearing on 07/24/2025. JM
View Returned Notices Returned Notices - Received 6-20-25 (21)
View Gazette Legal Notice on 6/23/25 For July 24 hearing
View email opposition 6/25/25 Jean Meinzer
View Affidavit of Published Legal Advertisement Published in The Gazette on 06/23/2025 for the Board of County Commissioners Hearing on 07/24/2025. JM
View Returned Notices Returned Notices - Received 6-24-25 (21)
View Returned Notices Returned Notices - Received 6-25-25 (3)
View C Churchwell comments 6 26 25
View Returned Notices Returned Notices - Received 6-26-25 (3)
View Kline Opposition 6 29 2025
View Returned Notices Returned Notices - Received 6-30-25 (47)
View Returned Notices Returned Notices - Received 7-01-25 (4)
View Returned Notices Returned Notices - Received 7-02-25 (4)
View XCELS Hearing Notice email
View Returned Notices Returned Notices - Received 7-07-25 (1)
View Public Comment Book, Penny - Opposition - Received 07-07-2025. JM
View Returned Notices Returned Notices - Received 7-07-25 (6)
View Returned Notices Returned Notices - Received 7-08-25 (6)
View Official hearing Notice by Applicant
View Returned Notice - 7/9/2025
View BOCC Staff Report - final with attachments Staff Report for the Board of County Commissioners hearing on 07/24/2025. JM
View Returned Notices Returned Notices - Received 7-10-25 (2)
View Returned Notices Returned Notices - Received 7-11-25 (8)
View Returned Notices Returned Notices - Received 7-14-25 (2)
View Returned Notices Returned Notices - Received 7/15/2025 (3)
View Returned Notices Returned Notices - Received 7/18/2025 (1)
View BOCC Hearing Agenda Hearing Agenda for the Board of County Commissioners hearing on 07/24/2025. JM
View G Knox Email 7 15 25 Opposition
View BT Construction email 7 15 25 Opposition
View Returned Notices Returned Notices - Received 7/18/2025 (1)
View Public Comment Potts, Sheryl - Opposition - Received 7-23-25
View Staff presentation BOCC Hearing 7 24 25
View Applicants Presentation 7 25 25 BoCC Hearing
View Tri County Fire POST BOCC Hearing
View Returned Notices Returned Notice - Received 8-06-2025 (1)
View Recorded BOCC Resolution AASI231 RECORDED BOCC RESOLUTION 25-214


Review Documents (59)

Link Document Date
View Application/Petition Form 7/1/2025 2:15:54 PM
View Legal Description (MS WORD Version required) 7/16/2024 8:26:05 AM
View Letter of Intent 7/1/2025 2:15:54 PM
View Vicinity/Location Map 4/1/2025 3:16:42 PM
View 1041 Documents Related to 5.201 (Items 1 - 11) 4/1/2025 3:16:45 PM
View Clearance Letter - Colorado Parks and Wildlife 6/4/2024 12:49:04 PM
View Colorado Geological Survey Receipt 7/16/2024 8:26:03 AM
View Determination of No Hazard from FAA 5/7/2025 4:14:15 PM
View Electromagnetic Interference Report 6/4/2024 12:48:30 PM
View Map Drawings 4/1/2025 3:16:39 PM
View Mineral Rights Certification 7/16/2024 8:26:06 AM
View Haul Route Plan 1/13/2025 1:38:59 PM
View Lighting Plan 6/4/2024 12:40:33 PM
View Zoning Map 4/1/2025 3:16:44 PM
View Wildlife Report 6/4/2024 12:46:08 PM
View Drainage Report - Preliminary 4/1/2025 3:16:41 PM
View Noxious Weed Management Plan 6/4/2024 12:42:51 PM
View Soils & Geology Report 7/16/2024 8:26:04 AM
View Traffic Impact Study 1/13/2025 1:38:57 PM
View Wetland Impact Letter 6/4/2024 12:45:26 PM
View 1041 Documents /Answers Related to 2.303 5/15/2025 12:14:51 PM
View 1041 Documents /Answers Related to 2.405 5/15/2025 12:14:50 PM
View 1041 Documents /Answers Related to 5.201 5/15/2025 12:14:52 PM
View 1041 Documents /Answers Related to 5.202 5/15/2025 12:14:51 PM
View 1041 Map Set 4/1/2025 3:16:47 PM
View Applicants response to opposition 7/22/2025 10:12:06 AM
View Applicants response to recommended conditions 7/22/2025 10:12:07 AM
View Attachment C: Routing and Siting Study (1 of 2) 6/4/2024 1:06:27 PM
View Attachment C: Routing and Siting Study (2 of 2) 6/4/2024 1:04:35 PM
View Attachment G: Soils, Geologic, and Natural Hazard Areas Map 6/4/2024 12:58:16 PM
View Attachment N, Existing Transmission Line Map 5/7/2025 4:14:20 PM
View Attachment P: Owners and Interests 6/4/2024 12:59:30 PM
View Attachment R: Studies Evaluating Potential Impacts to Livestock from Electric Transmission Lines 1/13/2025 1:39:07 PM
View Attachment S: Colorado Public Utilities Commission Decision Regarding CPCN and Noise and Magnetic Field Reasonableness for Pathway 1/13/2025 1:39:08 PM
View Attachment T, Fire District Coordination Letters Revised May 2025 5/7/2025 4:14:21 PM
View Attachment T: Fire District Coordination Letters 4/1/2025 3:16:52 PM
View Attachment V: Cultural Resources Desktop Review for Pathway in El Paso County 1/13/2025 1:39:09 PM
View Attachment W: Monitoring and Mitigation Plan 1/13/2025 1:44:33 PM
View Attachment W: Monitoring and Mitigation Plan 4/1/2025 3:16:54 PM
View Attachment X: Typical Cross Section 1/13/2025 1:44:34 PM
View Attachment: Cost and Schedule Information from the Pathway CPCN Application 4/1/2025 3:16:55 PM
View Cover Letter 6/4/2024 12:52:56 PM
View Development Agreement 7/1/2025 2:15:55 PM
View Elevation Plans 6/4/2024 12:39:13 PM
View Emergency Response Procedures 5/7/2025 4:14:16 PM
View Existing Transmission Line Map 6/4/2024 12:52:14 PM
View Final Response 7/3/2025 7:17:54 AM
View Land Cover Map from Attachment C, Routing and Siting Study from Segment 5 5/7/2025 4:14:19 PM
View Legal Description 1/13/2025 1:44:34 PM
View List of Adjacent Property Owners 6/4/2024 12:51:45 PM
View Noise Study 6/4/2024 12:42:32 PM
View Parcel List Attachment Q 1/13/2025 1:39:04 PM
View Pathway Responses to El Paso Third Referral Comments 5/7/2025 4:26:35 PM
View Responses to Second Referral Comments 4/1/2025 3:16:53 PM
View Slope Map from Attachment C, Routing and Siting Study from Segment 5 5/7/2025 4:14:19 PM
View Visual Impact Analysis 6/4/2024 12:44:50 PM
View Water Resources Map 6/4/2024 12:51:26 PM
View Wildfire Mitigation Plan - Colorado's Power Pathway, El Paso County Segment 5/7/2025 4:14:22 PM
View Xcel Energy Responses to El Paso County Referral Comments 1/13/2025 1:39:07 PM



Events (423)

Date Comment
7/29/2025 7:48:26 AM Project Closed
7/29/2025 7:48:26 AM Project Denied: 7/29/2025
7/22/2025 12:26:12 PM Submission Triaged
7/22/2025 10:13:28 AM Submission received from Applicant
7/21/2025 3:48:03 PM Submission request sent to Applicant
7/3/2025 7:18:39 AM Project reopened for Approval requests
7/3/2025 7:18:22 AM Project Closed
7/3/2025 7:18:22 AM Project Approved: 7/3/2025
7/3/2025 6:48:48 AM Submission Triaged
7/1/2025 2:19:41 PM Submission received from Applicant
6/26/2025 11:39:45 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
6/24/2025 10:31:17 AM Fees paid: 6/24/2025 (Receipt: 1010688)
6/24/2025 7:36:39 AM Payment Request sent: 6/24/2025
6/11/2025 1:19:43 PM Submission request sent to Applicant
6/11/2025 12:53:31 PM Submission request sent to Applicant
6/4/2025 11:15:15 AM Request for Review Comments returned by Tri-County Fire Protection District
6/3/2025 1:36:46 PM Submission request sent to Applicant
6/2/2025 8:09:46 AM Request for Review Comments returned by PCD Project Manager
5/28/2025 4:26:05 PM Request for Review Comments email resent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Kilgore on behalf of PCD Project Manager
5/28/2025 4:20:39 PM Request for Review Comments returned by PCD Project Manager
5/27/2025 1:39:39 PM Request for Review Comments returned by EPC Fire and Wildfire Program Manager
5/27/2025 10:14:29 AM Request for Review Comments returned by PCD Engineering Division
5/22/2025 1:42:07 PM Request for Review Comments returned by County Attorney - Development Review
5/21/2025 9:08:48 AM Request for Review Comments returned by Meadow Lake Airport Association
5/20/2025 7:18:36 AM Submission Triaged
5/16/2025 11:37:33 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
5/15/2025 12:15:18 PM Submission received from Applicant
5/12/2025 4:42:59 PM Submission request sent to Applicant
5/12/2025 4:14:40 PM Submission request sent to Applicant
5/12/2025 4:00:55 PM Submission request sent to Applicant
5/12/2025 4:00:19 PM Submission Triaged
5/12/2025 3:54:48 PM Submission received from Applicant
5/12/2025 3:24:53 PM Submission request sent to Applicant
5/7/2025 5:02:34 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mark Stanwood on behalf of Tri-County Fire Protection District
5/7/2025 5:02:33 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Wyatt Manson on behalf of Tri-County Fire Protection District
5/7/2025 5:02:31 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by General Email on behalf of Mountain View Electric Association, Inc.
5/7/2025 5:02:30 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Dave Elliott on behalf of Meadow Lake Airport Association
5/7/2025 5:02:29 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Kevin Keith on behalf of Federal Aviation Administration (FAA)
5/7/2025 5:02:28 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Bauer on behalf of Federal Aviation Administration (FAA)
5/7/2025 5:02:27 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Lori Seago on behalf of County Attorney - Development Review
5/7/2025 5:02:26 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Erika Keech on behalf of County Attorney - Development Review
5/7/2025 5:02:25 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by April Willie on behalf of County Attorney - Development Review
5/7/2025 5:02:23 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Kilgore on behalf of PCD Project Manager
5/7/2025 5:02:21 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Gilbert LaForce on behalf of PCD Engineering Division
5/7/2025 5:02:19 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Engineering Manager on behalf of PCD Engineering Division
5/7/2025 5:02:17 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
5/7/2025 4:56:45 PM Submission Triaged
5/7/2025 4:27:26 PM Submission received from Applicant
5/1/2025 11:55:41 AM Request for Review Comments returned by County Attorney - Development Review
4/29/2025 11:04:22 AM Request for Review Comments returned by EPC Fire and Wildfire Program Manager
4/23/2025 1:26:50 PM Submission request sent to Applicant
4/23/2025 1:23:26 PM Submission request sent to Applicant
4/23/2025 1:20:29 PM Request for Review Comments returned by PCD Project Manager
4/23/2025 10:57:59 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Lori Seago on behalf of County Attorney - Development Review
4/23/2025 10:57:58 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Erika Keech on behalf of County Attorney - Development Review
4/23/2025 10:57:57 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by April Willie on behalf of County Attorney - Development Review
4/22/2025 1:16:52 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Kevin Niles on behalf of Arkansas Groundwater Users Association
4/22/2025 1:16:51 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
4/22/2025 1:16:50 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Osborne on behalf of Colorado State Land Board
4/22/2025 1:16:48 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
4/22/2025 1:16:47 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
4/22/2025 1:16:46 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
4/22/2025 1:16:45 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
4/22/2025 1:16:43 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
4/22/2025 10:26:26 AM Request for Review Comments returned by Hanover Fire Protection District
4/21/2025 4:34:42 PM Request for Review Comments returned by EPC Stormwater Review
4/21/2025 1:57:21 PM Request for Review Comments returned by PCD Engineering Division
4/18/2025 2:57:59 PM Request for Review Comments returned by USAFA Base Planner
4/14/2025 9:55:31 AM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
4/2/2025 9:08:21 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
4/2/2025 8:45:00 AM Request for Review Comments returned by EPC Parks Department
4/2/2025 8:33:20 AM Request for Review Comments returned by Peterson AFB
4/1/2025 5:42:09 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Sabrina Untal on behalf of USAFA Base Planner
4/1/2025 5:42:07 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
4/1/2025 5:42:06 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Amy Kelley on behalf of USAFA Base Planner
4/1/2025 5:42:05 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of USAFA Base Planner
4/1/2025 5:42:04 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tracy Doran on behalf of Upper Big Sandy GWMD
4/1/2025 5:42:02 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Cindy Tompkins on behalf of Town of Ramah
4/1/2025 5:42:01 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Springs East Airport
4/1/2025 5:42:00 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
4/1/2025 5:41:59 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Joan Armstrong on behalf of Pueblo County Planning
4/1/2025 5:41:57 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
4/1/2025 5:41:56 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tyler Swanson on behalf of Public Service Company of Colorado dba X-cel Energy
4/1/2025 5:41:55 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
4/1/2025 5:41:54 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Elizabeth Dukes on behalf of Peterson AFB
4/1/2025 5:41:52 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Danny McCrory on behalf of NuStar Energy (formerly Valero LP)
4/1/2025 5:41:51 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
4/1/2025 5:41:50 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
4/1/2025 5:41:49 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Dwight Barnes on behalf of Miami Yoder 60 JT
4/1/2025 5:41:47 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Patrick Dunakee on behalf of Magellan Pipeline Company, L.P.
4/1/2025 5:41:46 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Don Higbee on behalf of Lower Arkansas Water Management Association
4/1/2025 5:41:45 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Jackie Evans on behalf of Kiowa Conservation Dist
4/1/2025 5:41:44 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Carl Tatum on behalf of Hanover Fire Protection District
4/1/2025 5:41:42 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mark Anderson on behalf of Edison Volunteer Fire Department
4/1/2025 5:41:41 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
4/1/2025 5:41:39 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
4/1/2025 5:41:38 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Chuck Reed on behalf of Cherry Creek Basin Water Quality Authority
4/1/2025 5:41:36 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Hillmann on behalf of Big Sandy Fire Protection District
4/1/2025 5:41:34 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Fred Lundy on behalf of Lincoln County Land Use
4/1/2025 5:41:33 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
4/1/2025 5:41:32 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
4/1/2025 5:41:31 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
4/1/2025 5:41:30 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Bauer on behalf of Federal Aviation Administration (FAA)
4/1/2025 5:41:29 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
4/1/2025 5:41:28 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
4/1/2025 5:41:27 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
4/1/2025 5:41:25 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mikayla Hartford on behalf of EPC Stormwater Review
4/1/2025 5:41:24 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Glenn Reese on behalf of EPC Stormwater Review
4/1/2025 5:41:23 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Christina Prete on behalf of EPC Stormwater Review
4/1/2025 5:41:22 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Jeff Kramer on behalf of EPC Sheriff's Department
4/1/2025 5:41:21 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
4/1/2025 5:41:20 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Andrew Prehm on behalf of EPC Sheriff's Department
4/1/2025 5:41:19 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of EPC Public Works, County Engineer
4/1/2025 5:41:18 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of EPC Public Works, County Engineer
4/1/2025 5:41:17 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of EPC Parks Department
4/1/2025 5:41:15 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Jim Schanel on behalf of EPC Fire Marshal
4/1/2025 5:41:14 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Shanna Smith on behalf of EPC Finance
4/1/2025 5:41:13 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Nikki Simmons on behalf of EPC Finance
4/1/2025 5:41:11 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Kilgore on behalf of PCD Project Manager
4/1/2025 5:41:10 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Gilbert LaForce on behalf of PCD Engineering Division
4/1/2025 5:41:09 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Engineering Manager on behalf of PCD Engineering Division
4/1/2025 5:33:02 PM Submission Triaged
4/1/2025 3:19:48 PM Submission received from Applicant
3/5/2025 11:24:48 AM Request for Review Comments returned by Tri-County Fire Protection District
3/5/2025 11:24:31 AM Request for Review Comments returned by Tri-County Fire Protection District
3/5/2025 11:04:17 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
3/5/2025 11:03:31 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
2/13/2025 2:04:28 PM Request for Review Comments returned by County Attorney - Development Review
2/13/2025 1:55:35 PM Submission request sent to Applicant
2/13/2025 1:54:45 PM Submission request sent to Applicant
2/13/2025 1:51:50 PM Request for Review Comments returned by PCD Project Manager
2/13/2025 12:27:04 PM Request for Review Comments returned by USAFA Base Planner
2/13/2025 12:26:21 PM Request for Review Comments returned by USAFA Base Planner
2/13/2025 12:24:07 PM Request for Review Comments returned by USAFA Base Planner
2/13/2025 9:45:07 AM Request for Review Comments returned by PCD Engineering Division
2/13/2025 9:42:37 AM Request for Review Comments email resent for Project Colorado's Xcel Power Pathway 1041 for review by Lori Seago on behalf of County Attorney - Development Review
2/13/2025 9:04:57 AM Request for Review Comments returned by County Attorney - Development Review
2/12/2025 9:42:42 AM Request for Review Comments returned by Pikes Peak Regional Building Department
2/11/2025 4:03:11 PM Request for Review Comments returned by Colorado Geological Survey
2/11/2025 4:02:26 PM Request for Review Comments returned by Colorado Geological Survey
2/11/2025 1:24:07 PM Request for Review Comments returned by EPC Stormwater Review
2/10/2025 1:39:50 PM Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
2/10/2025 1:39:22 PM Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
2/10/2025 10:05:51 AM Request for Review Comments returned by Xcel Energy
1/29/2025 9:02:48 AM Request for Review Comments returned by Schriever AFB
1/29/2025 9:02:32 AM Request for Review Comments returned by Schriever AFB
1/27/2025 3:43:24 PM Request for Review Comments returned by Schriever AFB
1/27/2025 3:29:59 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
1/22/2025 12:21:03 PM Request for Review Comments returned by Colorado Department of Public Health and Environment
1/21/2025 1:28:26 PM Request for Review Comments returned by EPC Environmental Services
1/20/2025 1:37:19 PM Request for Review Comments returned by Tri-County Fire Protection District
1/19/2025 6:09:40 PM Request for Review Comments returned by EPC Health Department
1/17/2025 3:54:51 PM Request for Review Comments returned by EPC Parks Department
1/17/2025 8:08:07 AM Request for Review Comments returned by Meadow Lake Airport Association
1/15/2025 11:25:32 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
1/14/2025 2:06:22 PM Request for Review Comments returned by RBD Floodplain
1/14/2025 1:06:36 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Sabrina Untal on behalf of USAFA Base Planner
1/14/2025 1:06:35 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
1/14/2025 1:06:35 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Amy Kelley on behalf of USAFA Base Planner
1/14/2025 1:06:34 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of USAFA Base Planner
1/14/2025 1:06:32 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mark Stanwood on behalf of Tri-County Fire Protection District
1/14/2025 1:06:31 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Wyatt Manson on behalf of Tri-County Fire Protection District
1/14/2025 1:06:30 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Cindy Tompkins on behalf of Town of Ramah
1/14/2025 1:06:29 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Springs East Airport
1/14/2025 1:06:28 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Darren Horstmeier on behalf of Schriever AFB
1/14/2025 1:06:27 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
1/14/2025 1:06:26 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tyler Swanson on behalf of Public Service Company of Colorado dba X-cel Energy
1/14/2025 1:06:24 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
1/14/2025 1:06:23 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Danny McCrory on behalf of NuStar Energy (formerly Valero LP)
1/14/2025 1:06:22 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
1/14/2025 1:06:21 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by General Email on behalf of Mountain View Electric Association, Inc.
1/14/2025 1:06:20 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Dave Elliott on behalf of Meadow Lake Airport Association
1/14/2025 1:06:19 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Jackie Evans on behalf of Kiowa Conservation Dist
1/14/2025 1:06:17 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Carl Tatum on behalf of Hanover Fire Protection District
1/14/2025 1:06:16 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
1/14/2025 1:06:15 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
1/14/2025 1:06:14 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Chuck Reed on behalf of Cherry Creek Basin Water Quality Authority
1/14/2025 1:06:13 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Keith Curtis on behalf of RBD Floodplain
1/14/2025 1:06:11 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Pikes Peak Regional Building Department
1/14/2025 1:06:10 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Fred Lundy on behalf of Lincoln County Land Use
1/14/2025 1:06:09 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
1/14/2025 1:06:08 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
1/14/2025 1:06:07 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
1/14/2025 1:06:06 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
1/14/2025 1:06:05 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
1/14/2025 1:06:04 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
1/14/2025 1:06:03 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Bauer on behalf of Federal Aviation Administration (FAA)
1/14/2025 1:06:01 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Osborne on behalf of Colorado State Land Board
1/14/2025 1:06:00 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
1/14/2025 1:05:59 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
1/14/2025 1:05:58 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
1/14/2025 1:05:57 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
1/14/2025 1:05:56 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
1/14/2025 1:05:54 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
1/14/2025 1:05:53 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
1/14/2025 1:05:52 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
1/14/2025 1:05:51 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Colorado Department of Public Health and Environment
1/14/2025 1:05:50 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment
1/14/2025 1:05:48 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Xcel energy Review on behalf of Xcel Energy
1/14/2025 1:05:47 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Michael Diehl on behalf of Xcel Energy
1/14/2025 1:05:46 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mikayla Hartford on behalf of EPC Stormwater Review
1/14/2025 1:05:45 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Glenn Reese on behalf of EPC Stormwater Review
1/14/2025 1:05:44 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Christina Prete on behalf of EPC Stormwater Review
1/14/2025 1:05:43 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Jeff Kramer on behalf of EPC Sheriff's Department
1/14/2025 1:05:42 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
1/14/2025 1:05:41 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Andrew Prehm on behalf of EPC Sheriff's Department
1/14/2025 1:05:41 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Sabrina Untal on behalf of USAFA Base Planner
1/14/2025 1:05:40 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of EPC Public Works, County Engineer
1/14/2025 1:05:40 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
1/14/2025 1:05:39 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of EPC Public Works, County Engineer
1/14/2025 1:05:39 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Amy Kelley on behalf of USAFA Base Planner
1/14/2025 1:05:38 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of USAFA Base Planner
1/14/2025 1:05:38 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of EPC Parks Department
1/14/2025 1:05:37 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mark Stanwood on behalf of Tri-County Fire Protection District
1/14/2025 1:05:37 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mike McCarthy on behalf of EPC Health Department
1/14/2025 1:05:36 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Catherine McGarvy on behalf of EPC Health Department
1/14/2025 1:05:36 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Wyatt Manson on behalf of Tri-County Fire Protection District
1/14/2025 1:05:34 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by HEAEH LandUse on behalf of EPC Health Department
1/14/2025 1:05:34 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Cindy Tompkins on behalf of Town of Ramah
1/14/2025 1:05:33 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Jim Schanel on behalf of EPC Fire Marshal
1/14/2025 1:05:33 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Sabrina Untal on behalf of USAFA Base Planner
1/14/2025 1:05:32 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Springs East Airport
1/14/2025 1:05:31 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Shanna Smith on behalf of EPC Finance
1/14/2025 1:05:31 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
1/14/2025 1:05:31 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Darren Horstmeier on behalf of Schriever AFB
1/14/2025 1:05:30 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Nikki Simmons on behalf of EPC Finance
1/14/2025 1:05:30 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Amy Kelley on behalf of USAFA Base Planner
1/14/2025 1:05:30 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Joan Armstrong on behalf of Pueblo County Planning
1/14/2025 1:05:29 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tracy Doran on behalf of Upper Big Sandy GWMD
1/14/2025 1:05:29 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of USAFA Base Planner
1/14/2025 1:05:29 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Kathy Andrew on behalf of EPC Environmental Services
1/14/2025 1:05:29 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
1/14/2025 1:05:28 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Cindy Tompkins on behalf of Town of Ramah
1/14/2025 1:05:28 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mark Stanwood on behalf of Tri-County Fire Protection District
1/14/2025 1:05:28 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Lori Seago on behalf of County Attorney - Development Review
1/14/2025 1:05:27 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Elizabeth Dukes on behalf of Peterson AFB
1/14/2025 1:05:27 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Springs East Airport
1/14/2025 1:05:27 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Wyatt Manson on behalf of Tri-County Fire Protection District
1/14/2025 1:05:27 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Erika Keech on behalf of County Attorney - Development Review
1/14/2025 1:05:26 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Danny McCrory on behalf of NuStar Energy (formerly Valero LP)
1/14/2025 1:05:26 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
1/14/2025 1:05:26 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Cindy Tompkins on behalf of Town of Ramah
1/14/2025 1:05:26 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by April Willie on behalf of County Attorney - Development Review
1/14/2025 1:05:25 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
1/14/2025 1:05:25 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Springs East Airport
1/14/2025 1:05:25 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Joan Armstrong on behalf of Pueblo County Planning
1/14/2025 1:05:24 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
1/14/2025 1:05:23 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Darren Horstmeier on behalf of Schriever AFB
1/14/2025 1:05:23 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
1/14/2025 1:05:23 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tracy Doran on behalf of Upper Big Sandy GWMD
1/14/2025 1:05:23 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Kilgore on behalf of PCD Project Manager
1/14/2025 1:05:22 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Joan Armstrong on behalf of Pueblo County Planning
1/14/2025 1:05:22 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Cindy Tompkins on behalf of Town of Ramah
1/14/2025 1:05:22 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Elizabeth Dukes on behalf of Peterson AFB
1/14/2025 1:05:22 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Gilbert LaForce on behalf of PCD Engineering Division
1/14/2025 1:05:21 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Springs East Airport
1/14/2025 1:05:21 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Danny McCrory on behalf of NuStar Energy (formerly Valero LP)
1/14/2025 1:05:21 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
1/14/2025 1:05:21 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Engineering Manager on behalf of PCD Engineering Division
1/14/2025 1:05:20 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
1/14/2025 1:05:20 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
1/14/2025 1:05:20 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Elizabeth Dukes on behalf of Peterson AFB
1/14/2025 1:05:19 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
1/14/2025 1:05:18 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Joan Armstrong on behalf of Pueblo County Planning
1/14/2025 1:05:17 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Dwight Barnes on behalf of Miami Yoder 60 JT
1/14/2025 1:05:17 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of PCD Administrative Notice
1/14/2025 1:05:17 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
1/14/2025 1:05:15 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Patrick Dunakee on behalf of Magellan Pipeline Company, L.P.
1/14/2025 1:05:15 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Elizabeth Dukes on behalf of Peterson AFB
1/14/2025 1:05:14 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Don Higbee on behalf of Lower Arkansas Water Management Association
1/14/2025 1:05:13 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Danny McCrory on behalf of NuStar Energy (formerly Valero LP)
1/14/2025 1:05:12 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mark Anderson on behalf of Edison Volunteer Fire Department
1/14/2025 1:05:11 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
1/14/2025 1:05:10 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
1/14/2025 1:05:09 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
1/14/2025 1:05:08 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Dwight Barnes on behalf of Miami Yoder 60 JT
1/14/2025 1:05:07 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Chuck Reed on behalf of Cherry Creek Basin Water Quality Authority
1/14/2025 1:05:06 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Patrick Dunakee on behalf of Magellan Pipeline Company, L.P.
1/14/2025 1:05:06 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Hillmann on behalf of Big Sandy Fire Protection District
1/14/2025 1:05:03 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Don Higbee on behalf of Lower Arkansas Water Management Association
1/14/2025 1:05:03 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Kevin Niles on behalf of Arkansas Groundwater Users Association
1/14/2025 1:05:02 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
1/14/2025 1:05:01 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Fred Lundy on behalf of Lincoln County Land Use
1/14/2025 1:05:00 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
1/14/2025 1:04:59 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
1/14/2025 1:04:58 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Chuck Reed on behalf of Cherry Creek Basin Water Quality Authority
1/14/2025 1:04:58 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
1/14/2025 1:04:56 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Hillmann on behalf of Big Sandy Fire Protection District
1/14/2025 1:04:56 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
1/14/2025 1:04:54 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Kevin Niles on behalf of Arkansas Groundwater Users Association
1/14/2025 1:04:54 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
1/14/2025 1:04:52 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Bauer on behalf of Federal Aviation Administration (FAA)
1/14/2025 1:04:52 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Fred Lundy on behalf of Lincoln County Land Use
1/14/2025 1:04:50 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Osborne on behalf of Colorado State Land Board
1/14/2025 1:04:48 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
1/14/2025 1:04:46 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
1/14/2025 1:04:45 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
1/14/2025 1:04:43 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
1/14/2025 1:04:41 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
1/14/2025 1:04:39 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
1/14/2025 1:04:36 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
1/14/2025 1:04:35 PM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
1/14/2025 12:44:39 PM Submission Triaged
1/13/2025 1:48:10 PM Submission received from Applicant
10/4/2024 4:22:09 PM Request for Review Comments returned by USAFA Base Planner
9/13/2024 5:27:49 PM Request for Review Comments returned by EPC Health Department
9/8/2024 2:10:01 PM Request for Review Comments returned by Hanover Fire Protection District
8/20/2024 5:13:02 PM Request for Review Comments returned by County Attorney - Development Review
8/19/2024 11:08:55 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
8/19/2024 9:52:43 AM Request for Review Comments returned by PCD Administrative Notice
8/19/2024 7:44:31 AM Submission request sent to Applicant
8/19/2024 7:31:01 AM Submission request sent to Applicant
8/19/2024 7:29:13 AM Request for Review Comments returned by PCD Project Manager
8/19/2024 7:22:39 AM Request for Review Comments returned by Pikes Peak Regional Building Department
8/16/2024 2:23:04 PM Request for Review Comments returned by PCD Engineering Division
8/16/2024 10:38:37 AM Request for Review Comments returned by Colorado Parks and Wildlife
8/15/2024 2:47:42 PM Request for Review Comments returned by Tri-County Fire Protection District
8/14/2024 3:58:06 PM Request for Review Comments returned by Colorado Geological Survey
8/14/2024 1:14:51 PM Request for Review Comments email resent for Project Colorado's Xcel Power Pathway 1041 for review by Lori Seago on behalf of County Attorney - Development Review
8/13/2024 4:03:03 PM Request for Review Comments returned by EPC Stormwater Review
8/1/2024 3:00:41 PM Request for Review Comments returned by Schriever AFB
7/30/2024 11:39:15 AM Request for Review Comments returned by Meadow Lake Airport Association
7/30/2024 11:32:28 AM Request for Review Comments returned by County Attorney - Development Review
7/29/2024 11:13:01 PM Request for Review Comments returned by Colorado Springs Airport Advisory Commission
7/19/2024 3:26:11 PM Request for Review Comments returned by EPC Environmental Services
7/19/2024 9:49:04 AM Request for Review Comments returned by RBD Floodplain
7/18/2024 2:43:00 PM Request for Review Comments returned by EPC Parks Department
7/18/2024 11:28:12 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
7/18/2024 8:44:24 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
7/17/2024 7:52:05 PM Request for Review Comments returned by Kiowa Conservation Dist
7/17/2024 11:24:04 AM Request for Review Comments returned by Public Service Company of Colorado dba X-cel Energy
7/17/2024 9:57:03 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Rachel Martell on behalf of USAFA Base Planner
7/17/2024 9:57:01 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by matthew. fitzsimmons on behalf of USAFA Base Planner
7/17/2024 9:56:59 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Amy Kelley on behalf of USAFA Base Planner
7/17/2024 9:56:57 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of USAFA Base Planner
7/17/2024 9:56:55 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tracy Doran on behalf of Upper Big Sandy GWMD
7/17/2024 9:56:53 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mark Stanwood on behalf of Tri-County Fire Protection District
7/17/2024 9:56:51 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Scott Markle on behalf of Tri-County Fire Protection District
7/17/2024 9:56:49 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Wyatt Manson on behalf of Tri-County Fire Protection District
7/17/2024 9:56:47 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Cindy Tompkins on behalf of Town of Ramah
7/17/2024 9:56:45 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Springs East Airport
7/17/2024 9:56:43 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
7/17/2024 9:56:40 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Darren Horstmeier on behalf of Schriever AFB
7/17/2024 9:56:39 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Joan Armstrong on behalf of Pueblo County Planning
7/17/2024 9:56:36 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
7/17/2024 9:56:35 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tyler Swanson on behalf of Public Service Company of Colorado dba X-cel Energy
7/17/2024 9:56:32 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
7/17/2024 9:56:30 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Elizabeth Dukes on behalf of Peterson AFB
7/17/2024 9:56:28 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Danny McCrory on behalf of NuStar Energy (formerly Valero LP)
7/17/2024 9:56:26 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
7/17/2024 9:56:24 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
7/17/2024 9:56:21 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by General Email on behalf of Mountain View Electric Association, Inc.
7/17/2024 9:56:19 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Dwight Barnes on behalf of Miami Yoder 60 JT
7/17/2024 9:56:17 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Dave Elliott on behalf of Meadow Lake Airport Association
7/17/2024 9:56:15 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Patrick Dunakee on behalf of Magellan Pipeline Company, L.P.
7/17/2024 9:56:13 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Don Higbee on behalf of Lower Arkansas Water Management Association
7/17/2024 9:56:11 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Jackie Evans on behalf of Kiowa Conservation Dist
7/17/2024 9:56:09 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Carl Tatum on behalf of Hanover Fire Protection District
7/17/2024 9:56:07 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mark Anderson on behalf of Edison Volunteer Fire Department
7/17/2024 9:56:05 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
7/17/2024 9:56:03 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
7/17/2024 9:56:01 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Chuck Reed on behalf of Cherry Creek Basin Water Quality Authority
7/17/2024 9:55:58 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Hillmann on behalf of Big Sandy Fire Protection District
7/17/2024 9:55:55 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Kevin Niles on behalf of Arkansas Groundwater Users Association
7/17/2024 9:55:52 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Keith Curtis on behalf of RBD Floodplain
7/17/2024 9:55:50 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Pikes Peak Regional Building Department
7/17/2024 9:55:48 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Fred Lundy on behalf of Lincoln County Land Use
7/17/2024 9:55:46 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
7/17/2024 9:55:44 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
7/17/2024 9:55:42 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
7/17/2024 9:55:40 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
7/17/2024 9:55:38 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
7/17/2024 9:55:36 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
7/17/2024 9:55:34 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by John Bauer on behalf of Federal Aviation Administration (FAA)
7/17/2024 9:55:31 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Justin Osborne on behalf of Colorado State Land Board
7/17/2024 9:55:29 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
7/17/2024 9:55:27 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
7/17/2024 9:55:26 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
7/17/2024 9:55:24 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Cassidy English on behalf of Colorado Parks and Wildlife
7/17/2024 9:55:22 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
7/17/2024 9:55:20 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
7/17/2024 9:55:18 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
7/17/2024 9:55:16 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
7/17/2024 9:55:14 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
7/17/2024 9:55:12 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of Colorado Department of Public Health and Environment
7/17/2024 9:55:10 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Michael Diehl on behalf of Xcel Energy
7/17/2024 9:55:08 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Shannon Mustoe on behalf of EPC Stormwater Review
7/17/2024 9:55:06 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mikayla Hartford on behalf of EPC Stormwater Review
7/17/2024 9:55:04 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Glenn Reese on behalf of EPC Stormwater Review
7/17/2024 9:55:02 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Christina Prete on behalf of EPC Stormwater Review
7/17/2024 9:55:00 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Jeff Kramer on behalf of EPC Sheriff's Department
7/17/2024 9:54:59 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
7/17/2024 9:54:57 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Andrew Prehm on behalf of EPC Sheriff's Department
7/17/2024 9:54:55 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of EPC Public Works, County Engineer
7/17/2024 9:54:53 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of EPC Public Works, County Engineer
7/17/2024 9:54:50 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of EPC Parks Department
7/17/2024 9:54:48 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Mike McCarthy on behalf of EPC Health Department
7/17/2024 9:54:46 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Catherine McGarvy on behalf of EPC Health Department
7/17/2024 9:54:44 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by HEAEH LandUse on behalf of EPC Health Department
7/17/2024 9:54:42 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Jim Schanel on behalf of EPC Fire Marshal
7/17/2024 9:54:40 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Shanna Smith on behalf of EPC Finance
7/17/2024 9:54:38 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Nikki Simmons on behalf of EPC Finance
7/17/2024 9:54:36 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Kathy Andrew on behalf of EPC Environmental Services
7/17/2024 9:54:34 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Lori Seago on behalf of County Attorney - Development Review
7/17/2024 9:54:32 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Erika Keech on behalf of County Attorney - Development Review
7/17/2024 9:54:30 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by April Willie on behalf of County Attorney - Development Review
7/17/2024 9:54:28 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Kari Parsons on behalf of PCD Project Manager
7/17/2024 9:54:26 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Gilbert LaForce on behalf of PCD Engineering Division
7/17/2024 9:54:24 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Engineering Manager on behalf of PCD Engineering Division
7/17/2024 9:54:22 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by on behalf of PCD Administrative Notice
7/17/2024 9:54:20 AM Request for Review Comments email sent for Project Colorado's Xcel Power Pathway 1041 for review by Miranda Benson on behalf of PCD Administrative Notice
7/16/2024 2:20:47 PM Fees paid: 7/16/2024 (Receipt: 1009355)
7/16/2024 11:00:19 AM Payment Request sent: 7/16/2024
7/16/2024 11:00:14 AM Submission Triaged
7/16/2024 8:28:26 AM Submission received from Applicant
6/4/2024 3:18:10 PM Submission request sent to Applicant
6/4/2024 3:18:01 PM Submission Triaged
6/4/2024 1:06:52 PM Submission received from Applicant
11/15/2023 2:14:35 PM Submission request sent to Applicant
8/24/2023 10:46:12 AM File # Assigned: AASI231
8/24/2023 10:37:13 AM Project Manager Assigned: Kari Parsons
8/24/2023 10:37:13 AM EA Assigned: EA2382
8/24/2023 10:37:13 AM Project Created