12/9/2024 1:22:29 PM
|
Project Closed
|
12/9/2024 1:22:29 PM
|
Project Approved: 12/9/2024
|
12/6/2024 8:17:09 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/27/2024 11:25:53 AM
|
Project reopened for Review Comments
|
11/27/2024 11:25:17 AM
|
Request for Review Comments sent for Project Rhetoric Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
11/26/2024 10:48:29 AM
|
Project Closed
|
11/26/2024 10:48:29 AM
|
Project Approved: 11/26/2024
|
11/25/2024 12:59:20 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/14/2024 11:40:29 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
11/14/2024 11:40:25 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
11/14/2024 9:23:46 AM
|
Submission Triaged
|
11/13/2024 1:41:21 PM
|
Submission received from Applicant
|
11/12/2024 11:36:30 AM
|
Submission request sent to Applicant
|
10/22/2024 9:53:28 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
10/15/2024 3:41:22 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/15/2024 8:20:17 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
10/15/2024 8:20:15 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
10/15/2024 8:20:13 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
10/14/2024 2:48:36 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/10/2024 3:01:53 PM
|
Submission Triaged
|
10/10/2024 9:27:31 AM
|
Submission received from Applicant
|
10/10/2024 8:08:02 AM
|
Submission request sent to Applicant
|
10/8/2024 11:20:20 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
10/8/2024 11:20:16 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
10/8/2024 11:20:10 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
10/8/2024 11:14:19 AM
|
Submission Triaged
|
10/8/2024 10:02:40 AM
|
Submission received from Applicant
|
9/24/2024 2:28:11 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/24/2024 10:42:44 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/23/2024 2:06:12 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/19/2024 1:48:16 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/18/2024 9:19:21 AM
|
Submission request sent to Applicant
|
9/10/2024 11:04:38 AM
|
Fees paid: 9/10/2024 (Receipt: 1009559)
|
9/10/2024 10:34:54 AM
|
Payment Request sent: 9/10/2024
|
9/10/2024 9:01:00 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
9/10/2024 9:00:58 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
9/10/2024 9:00:56 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
9/10/2024 9:00:54 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
9/10/2024 9:00:52 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
9/10/2024 9:00:50 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
9/10/2024 9:00:48 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
9/10/2024 9:00:46 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
9/10/2024 9:00:44 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
9/10/2024 9:00:42 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
9/10/2024 9:00:39 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
9/10/2024 9:00:37 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
9/10/2024 9:00:33 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
9/10/2024 8:55:31 AM
|
Submission Triaged
|
9/9/2024 10:57:20 AM
|
Submission received from Applicant
|
8/13/2024 2:27:42 PM
|
Submission request sent to Applicant
|
8/13/2024 2:26:53 PM
|
Request for Review Comments returned by PCD Project Manager
|
8/12/2024 4:48:50 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/12/2024 1:12:21 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/12/2024 9:47:29 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
8/8/2024 3:20:20 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/30/2024 8:06:13 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
7/30/2024 8:06:11 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
7/30/2024 8:06:09 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
7/30/2024 8:06:07 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
7/30/2024 8:06:05 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
7/30/2024 8:06:03 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
7/30/2024 8:06:01 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
|
7/30/2024 8:05:59 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
7/30/2024 8:05:55 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
7/30/2024 8:05:53 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/30/2024 8:05:50 AM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
7/30/2024 7:53:31 AM
|
Submission Triaged
|
7/29/2024 12:53:29 PM
|
Submission received from Applicant
|
5/23/2024 2:43:37 PM
|
Submission request sent to Applicant
|
5/23/2024 2:33:19 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/22/2024 5:24:36 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/22/2024 5:08:03 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/22/2024 3:59:03 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/22/2024 8:59:53 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
5/22/2024 8:10:17 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
5/15/2024 9:32:46 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
5/9/2024 7:10:47 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/9/2024 6:12:13 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
5/8/2024 2:47:52 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
5/8/2024 2:47:50 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
5/8/2024 2:47:48 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:47 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Rae Carlson on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:45 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Patrick Morris on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:43 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by LaShunda Simpson on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:41 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Jonathan Scherer on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:39 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Joel Metzker on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:37 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Joel Dagnillo on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:35 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Jeff Bailey on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:33 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Erin Powers on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:31 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by General Email on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:29 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Dana Davison on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:27 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Brian Shevock on behalf of Colorado Springs Public Works
|
5/8/2024 2:47:25 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by PJ Langmaid on behalf of Black Forest Fire Protection District
|
5/8/2024 2:47:23 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Black Forest Fire Chief on behalf of Black Forest Fire Protection District
|
5/8/2024 2:47:21 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
5/8/2024 2:47:19 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
5/8/2024 2:47:17 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
5/8/2024 2:47:15 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
5/8/2024 2:47:14 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
5/8/2024 2:47:12 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
5/8/2024 2:47:10 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
5/8/2024 2:47:08 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
5/8/2024 2:47:04 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
5/8/2024 2:47:02 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/8/2024 2:46:58 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
5/8/2024 2:36:37 PM
|
Submission Triaged
|
5/7/2024 5:15:17 PM
|
Submission received from Applicant
|
12/8/2023 2:53:52 PM
|
Request for Review Comments returned by EPC Health Department
|
10/30/2023 10:25:34 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
10/30/2023 10:18:13 AM
|
Submission request sent to Applicant
|
10/29/2023 10:58:57 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
10/26/2023 2:51:36 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
10/25/2023 10:26:19 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
10/25/2023 1:42:10 PM
|
Request for Review Comments returned by County Attorney - Water
|
10/24/2023 3:54:34 PM
|
Submission request sent to Applicant
|
10/24/2023 3:53:25 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/24/2023 3:40:35 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
10/24/2023 9:30:23 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
10/23/2023 4:27:32 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/18/2023 11:15:24 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/18/2023 9:56:22 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/18/2023 8:02:38 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/10/2023 1:09:01 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
10/10/2023 9:14:02 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
10/9/2023 3:16:18 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/9/2023 2:33:15 PM
|
Request for Review Comments returned by Parks Advisory Board
|
10/9/2023 2:32:24 PM
|
Request for Review Comments returned by EPC Parks Department
|
10/6/2023 10:03:35 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
10/6/2023 9:42:23 AM
|
Request for Review Comments returned by EPC Environmental Services
|
10/5/2023 9:34:46 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
10/4/2023 7:05:39 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
10/3/2023 3:00:02 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by General Email on behalf of Mountain View Electric Association, Inc.
|
10/3/2023 3:00:00 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
|
10/3/2023 2:59:57 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
10/3/2023 2:59:55 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works
|
10/3/2023 2:59:53 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
10/3/2023 2:59:51 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Senior Planner Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
|
10/3/2023 2:59:49 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
10/3/2023 2:59:46 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila
|
10/3/2023 2:59:44 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by 6/2023 updated email Black Forest Fire Chief on behalf of Black Forest Fire Protection District
|
10/3/2023 2:59:42 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
10/3/2023 2:59:40 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
10/3/2023 2:59:38 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/3/2023 2:59:35 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
10/3/2023 2:59:15 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/3/2023 2:59:13 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
10/3/2023 2:59:09 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by on behalf of Parks Advisory Board
|
10/3/2023 2:59:07 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/3/2023 2:58:59 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by on behalf of EPC Parks Department
|
10/3/2023 2:58:57 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
10/3/2023 2:58:50 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/3/2023 2:58:48 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by April Willie on behalf of County Attorney - Water
|
10/3/2023 2:58:44 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
10/3/2023 2:58:40 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Kylie Bagley on behalf of PCD Project Manager
|
10/3/2023 2:58:38 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
10/3/2023 2:58:36 PM
|
Request for Review Comments email sent for Project Rhetoric Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
10/3/2023 2:54:28 PM
|
Submission Triaged
|
10/3/2023 2:44:33 PM
|
Submission received from Applicant
|
10/3/2023 1:25:12 PM
|
Submission request sent to Applicant
|
9/29/2023 8:17:55 PM
|
Submission request sent to Applicant
|
9/26/2023 11:28:09 AM
|
Project Manager Assigned: Kylie Bagley
|
9/26/2023 11:27:14 AM
|
Fees paid: 9/26/2023 (Receipt: 1008349)
|
9/26/2023 11:19:43 AM
|
Payment Request sent: 9/26/2023
|
9/26/2023 11:19:42 AM
|
File # Assigned: SF2325
|
9/26/2023 11:19:37 AM
|
Submission Triaged
|
9/26/2023 10:53:05 AM
|
Submission received from Applicant
|
9/26/2023 7:34:23 AM
|
Submission request sent to Applicant
|
9/26/2023 7:34:13 AM
|
Submission Triaged
|
9/25/2023 7:14:29 PM
|
Submission received from Applicant
|
7/12/2023 7:42:50 AM
|
Submission request sent to Applicant
|
7/12/2023 7:42:22 AM
|
Set Applicant to JR Engineering
|
7/12/2023 7:42:05 AM
|
Set Applicant to N.E.S.
|
7/11/2023 4:35:43 PM
|
Submission request sent to Applicant
|
7/11/2023 4:35:02 PM
|
Submission request sent to Applicant
|
7/11/2023 4:28:12 PM
|
Project Manager Assigned: Kari Parsons
|
7/11/2023 4:28:12 PM
|
Project Created
|