| 9/6/2024 2:59:15 PM | Project Closed | 
                
                    | 9/6/2024 2:59:15 PM | Project Approved: 9/6/2024 | 
                
                    | 7/10/2024 3:20:04 PM | Submission request sent to Applicant | 
                
                    | 4/10/2024 7:56:24 AM | Submission request sent to Applicant | 
                
                    | 4/10/2024 7:55:32 AM | Submission request sent to Applicant | 
                
                    | 4/10/2024 7:53:53 AM | Project reopened for Review Comments | 
                
                    | 2/22/2024 10:39:04 AM | Project Closed | 
                
                    | 2/22/2024 10:39:04 AM | Project Approved: 2/22/2024 | 
                
                    | 1/18/2024 10:09:13 AM | Project reopened for Approval requests | 
                
                    | 1/18/2024 10:09:04 AM | Project Closed | 
                
                    | 1/18/2024 10:09:04 AM | Project Approved: 1/18/2024 | 
                
                    | 1/18/2024 9:50:22 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 1/18/2024 9:19:50 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 1/17/2024 7:01:55 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 1/17/2024 7:01:53 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 1/17/2024 7:00:29 AM | Submission Triaged | 
                
                    | 1/16/2024 2:39:06 PM | Submission received from Applicant | 
                
                    | 1/11/2024 10:07:25 AM | Request for Review Comments returned by EPC Health Department | 
                
                    | 1/10/2024 3:41:43 PM | Submission request sent to Applicant | 
                
                    | 1/10/2024 3:40:42 PM | Submission Triaged | 
                
                    | 1/10/2024 2:42:36 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 1/10/2024 1:44:23 PM | Submission received from Applicant | 
                
                    | 1/10/2024 12:02:08 PM | Submission request sent to Applicant | 
                
                    | 1/10/2024 12:01:51 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 1/8/2024 11:31:24 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 1/8/2024 11:31:22 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 1/8/2024 11:29:58 AM | Submission Triaged | 
                
                    | 1/8/2024 10:04:49 AM | Submission received from Applicant | 
                
                    | 12/26/2023 11:28:41 AM | Submission request sent to Applicant | 
                
                    | 12/20/2023 4:19:16 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 12/20/2023 2:25:27 PM | Submission request sent to Applicant | 
                
                    | 12/20/2023 2:24:16 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 12/15/2023 9:59:09 AM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 12/14/2023 8:33:55 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 12/13/2023 11:29:54 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 12/13/2023 11:26:33 AM | Request for Review Comments email resent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 12/13/2023 11:03:23 AM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 12/11/2023 12:31:34 PM | Request for Review Comments email resent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 12/11/2023 11:09:11 AM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 12/7/2023 2:28:04 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 12/7/2023 11:37:02 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 12/7/2023 11:37:01 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 12/7/2023 11:36:58 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 12/7/2023 11:36:56 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 12/7/2023 11:36:54 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 12/7/2023 11:36:52 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 12/7/2023 11:36:48 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Lupe Packman on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 11:36:46 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 11:36:43 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 11:36:38 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Edward Schoenheit on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 11:36:36 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 11:36:34 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Charlene Durham on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 11:36:32 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 8:15:37 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 12/7/2023 8:15:33 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources | 
                
                    | 12/7/2023 8:15:31 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 12/7/2023 8:15:29 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 12/7/2023 8:15:27 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 12/7/2023 8:15:25 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 12/7/2023 8:15:23 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department | 
                
                    | 12/7/2023 8:15:21 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 12/7/2023 8:15:19 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department | 
                
                    | 12/7/2023 8:15:16 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water | 
                
                    | 12/7/2023 8:15:14 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 12/7/2023 8:15:09 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Lupe Packman on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 8:15:07 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 8:15:05 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 8:15:03 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Edward Schoenheit on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 8:15:01 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 8:14:59 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Charlene Durham on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 8:14:57 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division | 
                
                    | 12/7/2023 8:11:21 AM | Submission Triaged | 
                
                    | 12/7/2023 7:15:26 AM | Submission received from Applicant | 
                
                    | 10/17/2023 2:38:06 PM | Request for Review Comments returned by Black Forest Land Use Committee | 
                
                    | 10/9/2023 8:06:17 AM | Submission request sent to Applicant | 
                
                    | 10/9/2023 8:04:32 AM | Submission request sent to Applicant | 
                
                    | 10/9/2023 8:03:30 AM | Submission request sent to Applicant | 
                
                    | 9/27/2023 7:41:25 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 9/25/2023 4:22:50 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/25/2023 8:49:46 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 9/20/2023 10:12:08 AM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 9/19/2023 11:25:18 AM | Request for Review Comments returned by Colorado Springs Airport Advisory Commission | 
                
                    | 9/18/2023 9:37:59 AM | Request for Review Comments returned by Colorado Springs Planning & Community Development | 
                
                    | 9/14/2023 11:29:41 AM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 9/14/2023 9:45:32 AM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 9/14/2023 9:24:08 AM | Request for Review Comments returned by Colorado Springs Public Works | 
                
                    | 9/13/2023 10:09:23 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 9/11/2023 1:27:55 PM | Request for Review Comments returned by County Attorney - Water | 
                
                    | 9/11/2023 9:44:49 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 9/11/2023 9:11:27 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 9/6/2023 3:21:42 PM | Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 9/6/2023 3:20:22 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 9/2/2023 12:06:11 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 8/31/2023 10:39:13 AM | Request for Review Comments returned by Colorado State Forest Service | 
                
                    | 8/30/2023 4:03:59 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 8/29/2023 7:33:36 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 8/29/2023 7:33:10 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 8/29/2023 7:33:07 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/29/2023 7:33:06 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/29/2023 7:32:22 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 8/29/2023 7:32:19 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/29/2023 7:32:18 AM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/29/2023 7:21:02 AM | Submission Triaged | 
                
                    | 8/28/2023 9:22:18 PM | Request for Review Comments returned by Black Forest Fire Protection District | 
                
                    | 8/28/2023 3:08:58 PM | Submission received from Applicant | 
                
                    | 8/28/2023 8:19:11 AM | Request for Review Comments returned by Academy SD 20 Building Fund | 
                
                    | 8/25/2023 2:47:25 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 8/25/2023 11:41:16 AM | Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 8/24/2023 2:59:37 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 8/24/2023 2:59:34 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/24/2023 2:59:33 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/24/2023 2:55:41 PM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 8/24/2023 1:34:44 PM | Submission request sent to Applicant | 
                
                    | 8/24/2023 1:34:41 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by General Email on behalf of Mountain View Electric Association, Inc. | 
                
                    | 8/24/2023 1:34:40 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources) | 
                
                    | 8/24/2023 1:34:39 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works | 
                
                    | 8/24/2023 1:34:28 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development | 
                
                    | 8/24/2023 1:34:27 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission | 
                
                    | 8/24/2023 1:34:24 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila | 
                
                    | 8/24/2023 1:34:22 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Cheryl Pixley on behalf of Black Forest Trails Association | 
                
                    | 8/24/2023 1:34:21 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Terry Stokka on behalf of Black Forest Land Use Committee | 
                
                    | 8/24/2023 1:34:18 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by 6/2023 updated email Black Forest Fire  Chief on behalf of Black Forest Fire Protection District | 
                
                    | 8/24/2023 1:34:16 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund | 
                
                    | 8/24/2023 1:34:15 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Paul Brown on behalf of Traffic Review Consultant | 
                
                    | 8/24/2023 1:34:13 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 8/24/2023 1:34:12 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 8/24/2023 1:34:10 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 8/24/2023 1:34:09 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 8/24/2023 1:34:08 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 8/24/2023 1:34:07 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 8/24/2023 1:34:05 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service | 
                
                    | 8/24/2023 1:34:04 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife | 
                
                    | 8/24/2023 1:33:54 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 8/24/2023 1:33:52 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 8/24/2023 1:33:50 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by  on behalf of Parks Advisory Board | 
                
                    | 8/24/2023 1:33:49 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 8/24/2023 1:33:45 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Bill Elder on behalf of EPC Sheriff's Department | 
                
                    | 8/24/2023 1:33:44 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Bill Elder on behalf of EPC Sheriff's Department | 
                
                    | 8/24/2023 1:33:43 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by County Engineer on behalf of EPC Public Works, County Engineer | 
                
                    | 8/24/2023 1:33:41 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by County Engineer on behalf of EPC Public Works, County Engineer | 
                
                    | 8/24/2023 1:33:40 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by  on behalf of EPC Parks Department | 
                
                    | 8/24/2023 1:33:39 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department | 
                
                    | 8/24/2023 1:33:36 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 8/24/2023 1:33:35 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by April Willie on behalf of County Attorney - Water | 
                
                    | 8/24/2023 1:33:33 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 8/24/2023 1:33:31 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/24/2023 1:33:30 PM | Request for Review Comments email sent for Project Sterling Ranch East Fil No 5 Preliminary Plan for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 8/23/2023 3:58:32 PM | Fees paid: 8/23/2023 (Receipt: 1008241) | 
                
                    | 8/16/2023 5:02:23 PM | Payment Request sent: 8/16/2023 | 
                
                    | 8/16/2023 5:02:23 PM | File # Assigned: SP235 | 
                
                    | 8/16/2023 5:02:19 PM | Submission Triaged | 
                
                    | 8/16/2023 3:00:12 PM | Submission received from Applicant | 
                
                    | 5/25/2023 12:39:35 PM | Submission request sent to Applicant | 
                
                    | 5/15/2023 10:51:40 AM | Submission request sent to Applicant | 
                
                    | 5/15/2023 10:31:01 AM | Project Manager Assigned: Kari Parsons | 
                
                    | 5/15/2023 10:31:01 AM | EA Assigned: EA21117 | 
                
                    | 5/15/2023 10:31:01 AM | Project Created |