7/17/2025 2:13:49 PM
|
Project Closed
|
7/17/2025 2:13:49 PM
|
Project Approved: 7/17/2025
|
4/21/2025 5:27:50 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
4/17/2025 2:01:04 PM
|
Submission Triaged
|
4/17/2025 12:59:36 PM
|
Submission received from Applicant
|
4/17/2025 10:18:40 AM
|
Submission request sent to Applicant
|
4/16/2025 8:48:18 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Rachel Dunn on behalf of Black Forest Fire Protection District
|
4/16/2025 8:48:17 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Michael Alvarado on behalf of Black Forest Fire Protection District
|
4/16/2025 8:48:16 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by on behalf of Black Forest Fire Protection District
|
4/16/2025 8:48:15 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Chad Herdt on behalf of Black Forest Fire Protection District
|
4/5/2025 9:01:27 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
4/3/2025 6:53:32 PM
|
Fees paid: 4/3/2025 (Receipt: 1010384)
|
4/3/2025 12:59:57 PM
|
Payment Request sent: 4/3/2025
|
3/19/2025 8:18:49 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/18/2025 8:34:10 AM
|
Submission Triaged
|
3/17/2025 4:43:33 PM
|
Submission received from Applicant
|
3/17/2025 10:33:20 AM
|
Submission request sent to Applicant
|
3/17/2025 7:34:05 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
3/17/2025 7:34:04 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
3/17/2025 7:34:03 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by April Willie on behalf of County Attorney - Water
|
3/17/2025 7:32:38 AM
|
Submission Triaged
|
3/14/2025 4:36:23 PM
|
Submission received from Applicant
|
3/11/2025 4:28:26 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/11/2025 2:20:41 PM
|
Submission request sent to Applicant
|
3/11/2025 2:18:46 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/11/2025 11:37:08 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
3/11/2025 9:49:01 AM
|
Request for Review Comments returned by PCD Engineering Division
|
3/10/2025 3:41:49 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/10/2025 3:16:23 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/3/2025 10:36:41 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/3/2025 7:17:02 AM
|
Request for Review Comments email resent for Project Renehan Ranch Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/28/2025 10:41:17 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/25/2025 8:41:09 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by on behalf of Black Forest Fire Protection District
|
2/25/2025 8:41:08 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
2/25/2025 8:41:05 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
2/25/2025 8:41:04 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/25/2025 8:41:03 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
2/25/2025 8:41:02 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
2/25/2025 8:41:01 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
2/25/2025 8:41:00 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
2/25/2025 8:40:59 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
2/25/2025 8:40:58 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by April Willie on behalf of County Attorney - Water
|
2/25/2025 8:40:57 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
2/25/2025 8:40:56 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
2/25/2025 8:40:55 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
2/25/2025 8:40:54 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
|
2/25/2025 8:40:51 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
2/25/2025 8:40:50 AM
|
Request for Review Comments email sent for Project Renehan Ranch Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
2/25/2025 8:39:06 AM
|
Submission Triaged
|
2/24/2025 6:05:05 PM
|
Submission received from Applicant
|
2/6/2025 1:02:05 PM
|
Submission request sent to Applicant
|
1/4/2025 7:33:09 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
1/2/2025 9:15:34 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/31/2024 12:48:36 PM
|
Request for Review Comments returned by County Attorney - Water
|
12/23/2024 9:00:01 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/19/2024 7:16:34 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by on behalf of Black Forest Fire Protection District
|
12/19/2024 7:16:31 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
12/19/2024 7:16:29 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
12/19/2024 7:16:28 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
12/19/2024 7:16:26 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
|
12/19/2024 7:16:20 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/19/2024 7:16:17 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
12/19/2024 7:12:57 AM
|
Submission Triaged
|
12/18/2024 4:29:47 PM
|
Submission received from Applicant
|
10/10/2024 8:48:30 AM
|
Submission request sent to Applicant
|
9/25/2024 9:58:53 AM
|
Submission request canceled
|
9/24/2024 10:39:47 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
9/10/2024 12:51:37 PM
|
Submission request sent to Applicant
|
9/10/2024 12:50:39 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/10/2024 9:30:02 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
9/9/2024 9:56:36 AM
|
Request for Review Comments returned by PCD Engineering Division
|
9/5/2024 4:06:32 PM
|
Request for Review Comments returned by County Attorney - Water
|
8/29/2024 1:17:09 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
8/29/2024 11:59:27 AM
|
Request for Review Comments email resent for Project Renehan Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
8/29/2024 10:51:27 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
8/27/2024 2:14:36 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
8/27/2024 2:11:48 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
8/27/2024 2:11:46 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
8/27/2024 2:11:44 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
8/27/2024 2:11:42 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
8/27/2024 2:11:40 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
8/27/2024 2:11:38 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
8/27/2024 2:11:32 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
8/27/2024 2:11:30 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
8/22/2024 4:34:02 PM
|
Request for Review Comments email resent for Project Renehan Minor Subdivision for review by on behalf of Black Forest Fire Protection District
|
8/22/2024 4:28:55 PM
|
Submission Triaged
|
8/22/2024 4:15:48 PM
|
Submission received from Applicant
|
7/31/2024 9:31:31 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
7/16/2024 9:15:13 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by PJ Langmaid on behalf of Black Forest Fire Protection District
|
7/16/2024 9:15:11 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Black Forest Fire Chief on behalf of Black Forest Fire Protection District
|
6/27/2024 9:47:14 AM
|
Submission request sent to Applicant
|
6/27/2024 9:46:51 AM
|
Submission request sent to Applicant
|
6/27/2024 9:45:02 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/26/2024 10:38:06 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
6/25/2024 3:56:27 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/25/2024 11:30:42 AM
|
Request for Review Comments returned by County Attorney - Water
|
6/24/2024 4:37:34 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
6/17/2024 10:53:32 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
6/13/2024 5:29:41 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
6/13/2024 5:29:39 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
6/13/2024 5:29:37 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
6/13/2024 5:29:35 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
6/13/2024 5:29:33 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
6/13/2024 5:29:31 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Erika Keech on behalf of County Attorney - Water
|
6/13/2024 5:29:29 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
6/13/2024 5:29:27 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Kari Parsons on behalf of PCD Project Manager
|
6/13/2024 5:29:21 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/13/2024 5:29:19 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
6/13/2024 5:24:49 PM
|
Submission Triaged
|
6/13/2024 3:26:02 PM
|
Submission received from Applicant
|
12/19/2023 4:43:25 PM
|
Submission request sent to Applicant
|
12/19/2023 4:36:35 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/19/2023 4:12:45 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/19/2023 4:00:37 PM
|
Request for Review Comments email resent for Project Renehan Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
12/19/2023 12:53:46 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
12/19/2023 11:40:57 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/19/2023 10:12:37 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/19/2023 8:06:30 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/14/2023 3:54:46 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/11/2023 7:58:03 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/6/2023 9:09:17 AM
|
Request for Review Comments returned by County Attorney - Water
|
12/5/2023 11:55:35 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/5/2023 7:57:00 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by on behalf of Pikes Peak Regional Building Department
|
12/5/2023 7:56:58 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/5/2023 7:56:56 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
12/5/2023 7:56:54 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
12/5/2023 7:56:50 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
12/5/2023 7:56:48 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/5/2023 7:56:46 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
12/5/2023 7:56:44 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Glenn Reese on behalf of EPC Stormwater Review
|
12/5/2023 7:56:42 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Christina Prete on behalf of EPC Stormwater Review
|
12/5/2023 7:56:39 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Lori Seago on behalf of County Attorney - Water
|
12/5/2023 7:56:37 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by April Willie on behalf of County Attorney - Water
|
12/5/2023 7:56:35 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
12/5/2023 7:56:33 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by April Willie on behalf of County Attorney - Development Review
|
12/5/2023 7:56:29 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Lupe Packman on behalf of PCD Engineering Division
|
12/5/2023 7:56:27 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/5/2023 7:56:25 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/5/2023 7:56:23 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Edward Schoenheit on behalf of PCD Engineering Division
|
12/5/2023 7:56:21 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
12/5/2023 7:56:17 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Charlene Durham on behalf of PCD Engineering Division
|
12/5/2023 7:56:15 AM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
|
12/5/2023 7:20:19 AM
|
Submission Triaged
|
12/4/2023 4:35:13 PM
|
Submission received from Applicant
|
11/11/2023 9:19:25 PM
|
Request for Review Comments returned by EPC Health Department
|
10/27/2023 9:14:31 AM
|
Request for Review Comments returned by County Attorney - Water
|
10/17/2023 2:50:43 PM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
10/16/2023 7:40:31 AM
|
Submission request sent to Applicant
|
10/12/2023 5:14:40 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/10/2023 5:28:32 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/10/2023 4:54:09 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/9/2023 2:39:47 PM
|
Request for Review Comments returned by Parks Advisory Board
|
10/9/2023 2:32:02 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
10/9/2023 11:04:57 AM
|
Request for Review Comments email resent for Project Renehan Minor Subdivision for review by on behalf of Parks Advisory Board
|
10/6/2023 4:27:36 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/5/2023 2:18:41 PM
|
Request for Review Comments returned by Parks Advisory Board
|
10/4/2023 8:34:55 AM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
10/3/2023 3:15:32 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/29/2023 7:11:28 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/27/2023 4:20:36 PM
|
Request for Review Comments returned by EPC Parks Department
|
9/27/2023 3:26:42 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
9/26/2023 2:54:56 PM
|
Request for Review Comments returned by EPC Environmental Services
|
9/26/2023 7:24:54 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
9/20/2023 10:31:24 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
9/19/2023 1:45:16 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
9/19/2023 1:36:35 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Transportation and Land Use Chair Bob Mooney on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
9/19/2023 1:36:34 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
9/19/2023 1:36:33 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
9/19/2023 1:36:32 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
9/19/2023 1:36:31 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
9/19/2023 1:36:30 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/19/2023 1:36:28 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
9/19/2023 1:36:20 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
9/19/2023 1:36:19 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
9/19/2023 1:36:17 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by on behalf of Parks Advisory Board
|
9/19/2023 1:36:16 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/19/2023 1:36:15 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Bill Elder on behalf of EPC Sheriff's Department
|
9/19/2023 1:36:14 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Bill Elder on behalf of EPC Sheriff's Department
|
9/19/2023 1:36:13 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by on behalf of EPC Parks Department
|
9/19/2023 1:36:12 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
9/19/2023 1:36:10 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
9/19/2023 1:36:09 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Edi Anderson on behalf of County Attorney - Water
|
9/19/2023 1:36:05 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
9/19/2023 1:36:03 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Joe Letke on behalf of PCD Project Manager
|
9/19/2023 1:36:01 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
9/19/2023 1:36:01 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by Engineering Manager on behalf of PCD Engineering Division
|
9/19/2023 1:36:00 PM
|
Request for Review Comments email sent for Project Renehan Minor Subdivision for review by on behalf of PCD Administrative Notice
|
9/19/2023 11:19:27 AM
|
Fees paid: 9/19/2023 (Receipt: 1008313)
|
9/12/2023 12:23:50 PM
|
Project Manager Assigned: Joe Letke
|
9/12/2023 12:23:26 PM
|
Payment Request sent: 9/12/2023
|
9/12/2023 12:23:26 PM
|
File # Assigned: MS238
|
9/12/2023 12:23:17 PM
|
Submission Triaged
|
9/12/2023 10:14:48 AM
|
Submission received from Applicant
|
5/8/2023 10:44:55 AM
|
Submission request sent to Applicant
|
4/18/2023 1:37:48 PM
|
Submission request sent to Applicant
|
3/31/2023 3:41:50 PM
|
Submission request sent to Applicant
|
3/31/2023 3:41:40 PM
|
Submission Triaged
|
3/31/2023 11:38:44 AM
|
Submission received from Applicant
|
2/1/2023 1:47:14 PM
|
Submission request sent to Applicant
|
6/30/2022 7:16:43 AM
|
Submission request sent to Applicant
|
6/23/2022 10:33:46 AM
|
Project Manager Assigned: Ryan Howser
|
6/23/2022 10:33:46 AM
|
EA Assigned: EA2293
|
6/23/2022 10:33:46 AM
|
Project Created
|