12/4/2024 2:32:42 PM
|
Project Closed
|
12/4/2024 2:32:42 PM
|
Project Approved: 12/4/2024
|
6/17/2024 2:56:09 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
6/17/2024 2:53:30 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/13/2024 6:17:54 PM
|
Request for Review Comments returned by County Attorney - Water
|
6/13/2024 6:06:53 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/3/2024 11:22:19 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
6/3/2024 11:22:17 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
6/3/2024 11:22:16 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by April Willie on behalf of County Attorney - Water
|
6/3/2024 11:22:13 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
6/3/2024 11:22:12 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
|
6/3/2024 11:22:10 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
6/3/2024 11:22:08 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
6/3/2024 11:20:09 AM
|
Submission Triaged
|
6/3/2024 9:25:15 AM
|
Submission received from Applicant
|
6/3/2024 9:19:34 AM
|
Submission request sent to Applicant
|
6/3/2024 9:05:57 AM
|
Submission request sent to Applicant
|
5/28/2024 8:47:25 AM
|
Submission request sent to Applicant
|
5/24/2024 4:23:31 PM
|
Request for Review Comments returned by County Attorney - Water
|
5/13/2024 5:05:19 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
5/10/2024 8:12:27 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/10/2024 8:08:29 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
5/10/2024 8:08:27 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
5/10/2024 8:08:23 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
5/10/2024 8:08:21 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Erika Keech on behalf of County Attorney - Water
|
5/10/2024 8:08:19 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by April Willie on behalf of County Attorney - Water
|
5/9/2024 1:25:02 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/25/2024 3:38:39 PM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
4/25/2024 3:38:33 PM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/25/2024 3:38:31 PM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
4/25/2024 3:36:54 PM
|
Submission Triaged
|
4/25/2024 3:32:40 PM
|
Submission received from Applicant
|
4/25/2024 3:14:35 PM
|
Submission request sent to Applicant
|
4/18/2024 10:44:26 AM
|
Submission request sent to Applicant
|
4/18/2024 10:33:32 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/17/2024 2:13:03 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/4/2024 2:24:08 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/4/2024 8:00:04 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
4/4/2024 8:00:02 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
4/4/2024 8:00:01 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
4/4/2024 7:59:58 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Kari Parsons on behalf of PCD Project Manager
|
4/4/2024 7:59:53 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/4/2024 7:59:51 AM
|
Request for Review Comments email sent for Project Ivilo Heights Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
4/4/2024 7:57:26 AM
|
Submission Triaged
|
4/3/2024 12:37:12 PM
|
Submission received from Applicant
|
4/1/2024 9:30:58 AM
|
Submission request sent to Applicant
|
3/18/2024 10:48:16 AM
|
Payment Request sent: 3/18/2024
|
3/13/2024 12:34:52 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
3/13/2024 12:34:04 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
3/8/2024 4:41:12 PM
|
Request for Review Comments returned by EPC Health Department
|
3/7/2024 9:33:35 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
2/29/2024 11:35:36 AM
|
Request for Review Comments returned by PCD Project Manager
|
2/29/2024 9:09:11 AM
|
Request for Review Comments returned by County Attorney - Water
|
2/28/2024 6:05:35 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/28/2024 7:42:08 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
2/27/2024 9:11:21 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
2/22/2024 1:29:05 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/21/2024 4:52:47 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/19/2024 9:39:59 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/19/2024 9:39:18 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
2/15/2024 7:23:37 AM
|
Request for Review Comments returned by Parks Advisory Board
|
2/14/2024 12:27:42 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
2/14/2024 10:30:51 AM
|
Request for Review Comments returned by PCD Administrative Notice
|
2/12/2024 9:12:32 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
2/12/2024 8:08:03 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
2/10/2024 8:56:07 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
2/9/2024 1:12:48 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/8/2024 4:03:22 PM
|
Request for Review Comments returned by EPC Sheriff's Department
|
2/8/2024 3:07:36 PM
|
Request for Review Comments returned by EPC Parks Department
|
2/7/2024 3:39:04 PM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by on behalf of PCD Administrative Notice
|
2/7/2024 3:18:13 PM
|
Request for Review Comments returned by EPC Environmental Services
|
2/7/2024 9:39:00 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
|
2/7/2024 9:38:58 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Katie Miller on behalf of El Paso County Conservation Dist
|
2/7/2024 9:38:55 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
2/7/2024 9:38:53 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
2/7/2024 9:38:51 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
2/7/2024 9:38:49 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
2/7/2024 9:38:47 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by PJ Langmaid on behalf of Black Forest Fire Protection District
|
2/7/2024 9:38:46 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Black Forest Fire Chief on behalf of Black Forest Fire Protection District
|
2/7/2024 9:38:44 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Tom Gregory on behalf of Academy SD 20 Building Fund
|
2/7/2024 9:38:42 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Donald Smith on behalf of Academy SD 20 Building Fund
|
2/7/2024 9:38:40 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Becky Allan on behalf of Academy SD 20 Building Fund
|
2/7/2024 9:38:37 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by on behalf of Pikes Peak Regional Building Department
|
2/7/2024 9:38:35 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
2/7/2024 9:38:33 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
2/7/2024 9:38:31 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Tyson Floersheim on behalf of Colorado Parks and Wildlife
|
2/7/2024 9:38:29 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
2/7/2024 9:38:28 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
2/7/2024 9:38:26 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Sarah Watson on behalf of Colorado Parks and Wildlife
|
2/7/2024 9:38:24 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Philip Gurule on behalf of Colorado Parks and Wildlife
|
2/7/2024 9:38:22 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
2/7/2024 9:38:20 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Corey Adler on behalf of Colorado Parks and Wildlife
|
2/7/2024 9:38:18 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
2/7/2024 9:38:16 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Drew Vrbenec on behalf of Colorado Parks and Wildlife
|
2/7/2024 9:38:15 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Aaron Berscheid on behalf of Colorado Parks and Wildlife
|
2/7/2024 9:38:13 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
2/7/2024 9:38:10 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
2/7/2024 9:38:08 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/7/2024 9:38:06 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
2/7/2024 9:38:05 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
2/7/2024 9:38:03 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
2/7/2024 9:38:01 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
2/7/2024 9:37:59 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by on behalf of Parks Advisory Board
|
2/7/2024 9:37:57 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
2/7/2024 9:37:55 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
|
2/7/2024 9:37:53 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
|
2/7/2024 9:37:51 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
2/7/2024 9:37:49 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
2/7/2024 9:37:47 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
2/7/2024 9:37:45 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by on behalf of EPC Parks Department
|
2/7/2024 9:37:43 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Mike McCarthy on behalf of EPC Health Department
|
2/7/2024 9:37:41 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
2/7/2024 9:37:39 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by HEAEH LandUse on behalf of EPC Health Department
|
2/7/2024 9:37:37 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Jim Schanel on behalf of EPC Fire Marshal
|
2/7/2024 9:37:35 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
2/7/2024 9:37:33 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
2/7/2024 9:37:31 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by April Willie on behalf of County Attorney - Water
|
2/7/2024 9:37:28 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
2/7/2024 9:37:28 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
|
2/7/2024 9:37:26 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by April Willie on behalf of County Attorney - Development Review
|
2/7/2024 9:37:26 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Katie Miller on behalf of El Paso County Conservation Dist
|
2/7/2024 9:37:24 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
2/7/2024 9:37:22 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
2/7/2024 9:37:21 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
2/7/2024 9:37:20 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
2/7/2024 9:37:20 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
2/7/2024 9:37:18 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by on behalf of PCD Administrative Notice
|
2/7/2024 9:37:18 AM
|
Request for Review Comments email sent for Project Ivilo Final Plat for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
2/7/2024 7:59:08 AM
|
Fees paid: 2/7/2024 (Receipt: 1008769)
|
1/31/2024 10:01:23 AM
|
File # Assigned: SF245
|
1/31/2024 9:23:58 AM
|
Payment Request sent: 1/31/2024
|
1/31/2024 9:22:11 AM
|
File # Assigned: MS241
|
1/31/2024 9:20:52 AM
|
Submission Triaged
|
1/29/2024 8:29:28 AM
|
Submission received from Applicant
|
1/8/2024 1:07:48 PM
|
Submission request sent to Applicant
|
1/8/2024 8:51:19 AM
|
Submission request sent to Applicant
|
1/8/2024 8:50:34 AM
|
Submission request sent to Applicant
|
1/8/2024 8:42:10 AM
|
Project Manager Assigned: Ashlyn Mathy
|
12/18/2023 10:55:16 AM
|
Project reopened for Review Comments
|
6/20/2023 12:00:00 AM
|
Project Closed
|
6/20/2023 12:00:00 AM
|
Project Expired one year after 06/20/2022 Submission Request 06/20/2023
|
6/20/2022 5:29:25 PM
|
Submission request sent to Applicant
|
6/20/2022 1:36:59 PM
|
Project Manager Assigned: Matthew Fitzsimmons
|
6/20/2022 1:36:59 PM
|
EA Assigned: EA22103
|
6/20/2022 1:36:59 PM
|
Project Created
|