6/8/2022 1:05:03 PM
|
Project Closed
|
6/8/2022 1:05:03 PM
|
Project Approved: 6/8/2022
|
5/23/2022 8:49:50 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/16/2022 7:36:37 AM
|
Submission Triaged
|
5/13/2022 12:06:39 PM
|
Submission received from Applicant
|
5/12/2022 1:11:03 PM
|
Submission request sent to Applicant
|
5/11/2022 11:16:02 AM
|
Submission request sent to Applicant
|
5/11/2022 9:19:34 AM
|
Submission request sent to Applicant
|
5/11/2022 7:26:52 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Kari Parsons on behalf of PCD Project Manager
|
5/11/2022 7:17:51 AM
|
Submission Triaged
|
5/10/2022 7:29:42 PM
|
Submission received from Applicant
|
5/9/2022 11:03:30 AM
|
Submission request sent to Applicant
|
5/9/2022 11:02:26 AM
|
Submission request sent to Applicant
|
4/27/2022 8:36:16 AM
|
Project reopened for Approval requests
|
4/27/2022 8:36:02 AM
|
Project Closed
|
4/27/2022 8:36:02 AM
|
Project Approved: 4/27/2022
|
4/13/2022 10:02:42 AM
|
Request for Review Comments returned by County Attorney - Water
|
4/11/2022 8:27:14 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/4/2022 4:37:47 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Edi Anderson on behalf of County Attorney - Water
|
4/4/2022 4:37:46 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Kari Parsons on behalf of PCD Project Manager
|
4/4/2022 4:36:38 PM
|
Submission Triaged
|
4/4/2022 3:34:20 PM
|
Submission received from Applicant
|
4/4/2022 3:00:29 PM
|
Submission request sent to Applicant
|
4/4/2022 2:42:34 PM
|
Submission request sent to Applicant
|
4/4/2022 9:09:49 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Edi Anderson on behalf of County Attorney - Water
|
3/31/2022 6:52:41 AM
|
Submission request sent to Applicant
|
3/28/2022 10:54:27 AM
|
Request for Review Comments returned by County Attorney - Water
|
3/24/2022 11:30:53 AM
|
Submission request sent to Applicant
|
3/24/2022 11:29:19 AM
|
Submission request sent to Applicant
|
3/24/2022 11:28:23 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/23/2022 4:52:49 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Edi Anderson on behalf of County Attorney - Water
|
3/23/2022 3:30:10 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/21/2022 4:09:00 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/21/2022 9:24:51 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
3/14/2022 12:36:01 PM
|
Request for Review Comments returned by Widefield SD 3
|
3/8/2022 2:50:11 PM
|
Submission request sent to Applicant
|
3/8/2022 2:29:36 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/3/2022 8:16:03 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
3/3/2022 8:14:15 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/3/2022 8:14:11 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Edi Anderson on behalf of County Attorney - Water
|
3/3/2022 8:06:41 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by COO Dave Gish on behalf of Widefield SD 3
|
3/3/2022 8:06:39 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/3/2022 8:06:37 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Kari Parsons on behalf of PCD Project Manager
|
3/3/2022 8:06:33 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/3/2022 8:01:44 AM
|
Submission Triaged
|
3/3/2022 7:58:01 AM
|
Submission received from Applicant
|
2/17/2022 7:46:04 AM
|
Request for Review Comments returned by Fountain
|
2/14/2022 5:34:36 PM
|
Submission request sent to Applicant
|
2/14/2022 5:33:25 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/14/2022 2:58:43 PM
|
Request for Review Comments returned by PCD Engineering Division
|
2/13/2022 12:20:35 PM
|
Request for Review Comments returned by Widefield SD 3
|
2/10/2022 5:20:03 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
2/7/2022 10:25:14 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
2/2/2022 11:05:34 AM
|
Request for Review Comments sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Ben Sheets on behalf of Fountain
|
1/31/2022 4:40:18 PM
|
Submission request sent to Applicant
|
1/31/2022 4:21:14 PM
|
Request for Review Comments returned by County Attorney - Water
|
1/21/2022 8:53:02 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/20/2022 1:43:35 PM
|
Submission request sent to Applicant
|
1/20/2022 1:42:52 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/20/2022 1:42:09 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
|
1/20/2022 1:42:06 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
|
1/20/2022 1:42:04 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Heather on behalf of City of Fountain Electric
|
1/20/2022 1:38:40 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Brandon Bernard on behalf of Widefield Water & San
|
1/20/2022 1:38:38 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by COO Dave Gish on behalf of Widefield SD 3
|
1/20/2022 1:38:35 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Richard Davis on behalf of Security Water District
|
1/20/2022 1:38:33 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Roy Heald on behalf of Security Water & Sanitation District
|
1/20/2022 1:38:30 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Jay Adriansen on behalf of Security Sanitation District
|
1/20/2022 1:38:28 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by on behalf of Security Fire Protection District
|
1/20/2022 1:38:26 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/20/2022 1:38:24 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
1/20/2022 1:38:21 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Edi Anderson on behalf of County Attorney - Water
|
1/20/2022 1:38:19 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Kari Parsons on behalf of PCD Project Manager
|
1/20/2022 1:38:15 PM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/20/2022 1:10:40 PM
|
Submission request canceled
|
1/20/2022 12:55:37 PM
|
Submission request sent to Applicant
|
1/20/2022 12:54:36 PM
|
Submission Triaged
|
1/20/2022 7:05:37 AM
|
Submission received from Applicant
|
1/18/2022 2:32:41 PM
|
Submission request sent to Applicant
|
12/6/2021 8:44:55 PM
|
Request for Review Comments returned by EPC Health Department
|
11/19/2021 10:36:24 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
10/26/2021 11:08:59 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
10/25/2021 11:18:39 AM
|
Fees paid: 10/25/2021 (Receipt: 1005292)
|
10/21/2021 1:23:07 PM
|
Submission request sent to Applicant
|
10/21/2021 1:18:37 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/21/2021 1:16:51 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/21/2021 12:29:34 PM
|
Payment Request sent: 10/21/2021
|
10/20/2021 3:11:37 PM
|
File # Assigned: PUDSP2111
|
10/19/2021 2:04:13 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
10/14/2021 2:24:05 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/14/2021 11:12:15 AM
|
Request for Review Comments returned by Parks Advisory Board
|
10/7/2021 9:40:18 AM
|
Request for Review Comments returned by Fountain
|
10/6/2021 2:42:25 PM
|
Request for Review Comments returned by EPC Parks Department
|
10/5/2021 1:34:51 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
10/5/2021 8:48:51 AM
|
Request for Review Comments returned by EPC Environmental Services
|
10/4/2021 3:12:33 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
10/4/2021 10:50:49 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
10/1/2021 6:59:50 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/28/2021 3:29:56 PM
|
Request for Review Comments returned by Widefield SD 3
|
9/23/2021 10:56:55 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
9/16/2021 1:41:20 PM
|
Request for Review Comments returned by County Attorney - Water
|
9/16/2021 10:08:49 AM
|
Request for Review Comments returned by Fountain Mutual Irrigation Company
|
9/16/2021 8:24:07 AM
|
Request for Review Comments returned by US Postal Service
|
9/14/2021 11:12:41 AM
|
Request for Review Comments returned by RBD Floodplain
|
9/14/2021 11:09:34 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Brandon Bernard on behalf of Widefield Water & San
|
9/14/2021 11:09:31 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by COO Dave Gish on behalf of Widefield SD 3
|
9/14/2021 11:09:29 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Richard Davis on behalf of Security Water District
|
9/14/2021 11:09:27 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Roy Heald on behalf of Security Water & Sanitation District
|
9/14/2021 11:09:25 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Jay Adriansen on behalf of Security Sanitation District
|
9/14/2021 11:09:23 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by on behalf of Security Fire Protection District
|
9/14/2021 11:09:21 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by General Email on behalf of Mountain View Electric Association, Inc.
|
9/14/2021 11:09:19 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
9/14/2021 11:09:16 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
|
9/14/2021 11:09:16 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Keith Curtis on behalf of RBD Floodplain
|
9/14/2021 11:09:14 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Kristy Martinez on behalf of Fountain
|
9/14/2021 11:09:09 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/14/2021 11:09:06 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
|
9/14/2021 11:09:04 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Fire Protection Engineer II Steve Smith on behalf of Colorado Springs Fire Department
|
9/14/2021 11:09:02 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
|
9/14/2021 11:08:59 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Heather on behalf of City of Fountain Electric
|
9/14/2021 11:08:57 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
9/14/2021 11:08:54 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
9/14/2021 11:08:52 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
|
9/14/2021 11:08:50 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
9/14/2021 11:08:48 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Elaine Kelly on behalf of US Postal Service
|
9/14/2021 11:08:46 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Kimberly Berscheid on behalf of Colorado Parks and Wildlife
|
9/14/2021 11:08:40 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
9/14/2021 11:08:38 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
9/14/2021 11:08:36 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
9/14/2021 11:08:34 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by on behalf of Parks Advisory Board
|
9/14/2021 11:08:32 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/14/2021 11:08:29 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
9/14/2021 11:08:26 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by on behalf of EPC Parks Department
|
9/14/2021 11:08:23 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Catherine McGarvy on behalf of EPC Health Department
|
9/14/2021 11:08:05 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Kathy Andrew on behalf of EPC Environmental Services
|
9/14/2021 11:08:02 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Edi Anderson on behalf of County Attorney - Water
|
9/14/2021 11:07:59 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Kari Parsons on behalf of PCD Project Manager
|
9/14/2021 11:07:56 AM
|
Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/14/2021 10:52:26 AM
|
Fees paid: 9/14/2021 (Receipt: 1005093)
|
9/14/2021 9:59:38 AM
|
Payment Request sent: 9/14/2021
|
9/14/2021 9:59:38 AM
|
File # Assigned: PUD212
|
9/14/2021 9:59:29 AM
|
Submission Triaged
|
9/10/2021 12:31:24 PM
|
Submission received from Applicant
|
8/24/2021 11:21:16 AM
|
Submission request sent to Applicant
|
8/24/2021 11:20:54 AM
|
Submission Triaged
|
8/24/2021 6:47:33 AM
|
Submission received from Applicant
|
7/8/2021 11:53:30 AM
|
Submission request sent to Applicant
|
7/6/2021 2:24:51 PM
|
Project Manager Assigned: Kari Parsons
|
7/6/2021 2:24:51 PM
|
EA Assigned: EA2054
|
7/6/2021 2:24:50 PM
|
Project Created
|