Project Details

Search


File Number
PUDSP2111
Project Name
Cottages at Mesa Ridge PUD Prelim Plan
Description
A PUD for 122 homes constructed off site (mix of one story and two story -2 units stacked), on one lot to be owned by a single entity for long term lease; includes a clubhouse, internal drives, and common areas aka: horizontal MF apartment complex.. PUD to be approved as a prelim plan also and water sufficiency requested -anticipated administrative plat. Pre-site Dev Grading and installation utilities not requested with Prelim Plan.
Parcels
5529100006 5529100006
Applicant
HR Green
Phil Stuepfert ( pstuepfert@hrgreen.com )
(630) 220-7936
Phil Stuepfert ( pstuepfert@hrgreen.com )
(630) 220-7936
EA Number
EA2054
File Prefix
PUDSP - Combined PUD/Preliminary Plan
Year
2021
Project Manager
Kari Parsons
Status
Closed
Created
7/6/2021 2:24:30 PM

View: Review Comments



Additional Documents (35)

Link Document Comment
View Neighborhood meeting notice
View Opposition Email
View Opposition Email
View Opposition Email
View Opposition Email
View Opposition Email
View Opposition Email
View Opposition email This email summary differs from what was discussed at neighborhood meeting
View Applicants Meeting Minutes Neighborhood Meeting Nov. 18th 2021
View email w attachments regarding fire Comt. 26' ER road required per fire dept..
View Notice, Map and Labels
View Posting Photo
View Returned Mail
View Returned Mail
View Response to Notice of Public Hearing
View Returned Mail
View STAFF REPORT PC
View Returned Mail
View Updated Posting Photo
View Updated Posting Photo
View Returned Mail
View Returned Mail
View Returned Mail
View Returned Mail
View Returned Mail
View Notice of Public Hearing
View applicants email to neighbor color palette
View PC Resolution
View BoCC Resolution
View BoCC Staff Report
View Approved Preliminary Drainage Report
View Accepted Traffic Impact Study
View BOCC RESOLUTION 22-196
View Recorded BoCC Resolution 22-196 - 222078838
View Recorded Plat - 222145209


Review Documents (51)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 8/24/2021 6:33:54 AM
View Application/Petition Form 8/24/2021 6:33:56 AM
View Legal Description (MS WORD Version required) 8/24/2021 6:37:48 AM
View Letter of Intent 5/13/2022 12:04:44 PM
View PUD Development Plan - can include phasing if proposed 5/13/2022 11:54:17 AM
View Title Commitment (Current within 30 days of submittal) 8/24/2021 6:41:09 AM
View Vicinity/Location Map 8/24/2021 6:41:59 AM
View Colorado Geological Survey Receipt 8/24/2021 6:33:56 AM
View Mineral Rights Certification 8/24/2021 6:38:50 AM
View Landscape Plan drawings 5/13/2022 12:04:17 PM
View Zoning Map 8/24/2021 6:44:33 AM
View Wildlife Report 8/24/2021 6:44:13 AM
View Commitment letter from waste water service provider 4/4/2022 3:34:15 PM
View Commitment letter from water service provider 4/4/2022 3:28:23 PM
View Fire Commitment Letter 3/3/2022 7:40:17 AM
View Natural Gas Commitment Letter 8/24/2021 6:39:25 AM
View Drainage Report - Preliminary 5/13/2022 12:05:40 PM
View Fire Protection Report 8/24/2021 6:36:47 AM
View Natural Features Report 8/24/2021 6:38:50 AM
View Noxious Weed Management Plan 8/24/2021 6:39:54 AM
View Soils & Geology Report 1/20/2022 6:13:09 AM
View Subdivision Summary Sheet 4/4/2022 3:28:26 PM
View Traffic Impact Study 3/3/2022 7:41:50 AM
View Wastewater Disposal Report 8/24/2021 6:42:24 AM
View Water Resources Report 4/4/2022 3:28:26 PM
View Water Supply Information Summary 4/4/2022 3:28:27 PM
View 01_PUD-PRELIMINARY_PLAN-Review-Markup-HRG-RESPONSES 3/3/2022 7:49:56 AM
View 03-Landscape_Plans-Review-Markup-HRG-RESPONSES 3/3/2022 7:49:01 AM
View 04_LOI_Review-Markup-HRG-RESPONSES 3/3/2022 7:50:39 AM
View 05_PDR_Review-Markup-HRG-RESPONSES 3/3/2022 7:51:29 AM
View 06_TIA-Review-Markups-LSC-RESPONSES 3/3/2022 7:52:37 AM
View 08_Water_Resource_Report_Review-Markup-HRG-RESPONSES 3/3/2022 7:53:26 AM
View 09_Grading_Plan_Review-Markup-HRG-RESPONSES 3/3/2022 7:54:57 AM
View 22_Wastewater_Report-REV 9/10/2021 12:30:38 PM
View 23_Water_Resources_Report-REV 9/10/2021 12:30:39 PM
View adjacent owners 1/20/2022 7:05:22 AM
View agency 1/20/2022 6:33:52 AM
View CDOT access permit application or existing permit 8/24/2021 6:44:55 AM
View checklist 1/20/2022 6:35:35 AM
View checklist 1/20/2022 6:35:35 AM
View epc 1/20/2022 6:34:39 AM
View FMIC Authorization for ER Access Road 1/20/2022 6:15:27 AM
View fountain 1/20/2022 6:34:39 AM
View grading 1/20/2022 7:05:21 AM
View Grading Plan Preliminary 3/3/2022 7:41:11 AM
View landscape 1/20/2022 7:05:19 AM
View LOI 1/20/2022 7:05:20 AM
View Noise Study 1/20/2022 6:15:27 AM
View prelim drainage 1/20/2022 6:40:16 AM
View pud 1/20/2022 6:35:36 AM
View Widefield_School_District_Comments-Review-Markup-HRG-RESPONSES 3/3/2022 7:54:57 AM



Events (149)

Date Comment
6/8/2022 1:05:03 PM Project Closed
6/8/2022 1:05:03 PM Project Approved: 6/8/2022
5/23/2022 8:49:50 AM Request for Review Comments returned by PCD Project Manager
5/16/2022 7:36:37 AM Submission Triaged
5/13/2022 12:06:39 PM Submission received from Applicant
5/12/2022 1:11:03 PM Submission request sent to Applicant
5/11/2022 11:16:02 AM Submission request sent to Applicant
5/11/2022 9:19:34 AM Submission request sent to Applicant
5/11/2022 7:26:52 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Kari Parsons on behalf of PCD Project Manager
5/11/2022 7:17:51 AM Submission Triaged
5/10/2022 7:29:42 PM Submission received from Applicant
5/9/2022 11:03:30 AM Submission request sent to Applicant
5/9/2022 11:02:26 AM Submission request sent to Applicant
4/27/2022 8:36:16 AM Project reopened for Approval requests
4/27/2022 8:36:02 AM Project Closed
4/27/2022 8:36:02 AM Project Approved: 4/27/2022
4/13/2022 10:02:42 AM Request for Review Comments returned by County Attorney - Water
4/11/2022 8:27:14 AM Request for Review Comments returned by PCD Project Manager
4/4/2022 4:37:47 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Edi Anderson on behalf of County Attorney - Water
4/4/2022 4:37:46 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Kari Parsons on behalf of PCD Project Manager
4/4/2022 4:36:38 PM Submission Triaged
4/4/2022 3:34:20 PM Submission received from Applicant
4/4/2022 3:00:29 PM Submission request sent to Applicant
4/4/2022 2:42:34 PM Submission request sent to Applicant
4/4/2022 9:09:49 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Edi Anderson on behalf of County Attorney - Water
3/31/2022 6:52:41 AM Submission request sent to Applicant
3/28/2022 10:54:27 AM Request for Review Comments returned by County Attorney - Water
3/24/2022 11:30:53 AM Submission request sent to Applicant
3/24/2022 11:29:19 AM Submission request sent to Applicant
3/24/2022 11:28:23 AM Request for Review Comments returned by PCD Project Manager
3/23/2022 4:52:49 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Edi Anderson on behalf of County Attorney - Water
3/23/2022 3:30:10 PM Request for Review Comments returned by Colorado Division of Water Resources
3/21/2022 4:09:00 PM Request for Review Comments returned by PCD Engineering Division
3/21/2022 9:24:51 AM Request for Review Comments returned by Colorado Geological Survey
3/14/2022 12:36:01 PM Request for Review Comments returned by Widefield SD 3
3/8/2022 2:50:11 PM Submission request sent to Applicant
3/8/2022 2:29:36 PM Request for Review Comments returned by County Attorney - Water
3/3/2022 8:16:03 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
3/3/2022 8:14:15 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
3/3/2022 8:14:11 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Edi Anderson on behalf of County Attorney - Water
3/3/2022 8:06:41 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by COO Dave Gish on behalf of Widefield SD 3
3/3/2022 8:06:39 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
3/3/2022 8:06:37 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Kari Parsons on behalf of PCD Project Manager
3/3/2022 8:06:33 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/3/2022 8:01:44 AM Submission Triaged
3/3/2022 7:58:01 AM Submission received from Applicant
2/17/2022 7:46:04 AM Request for Review Comments returned by Fountain
2/14/2022 5:34:36 PM Submission request sent to Applicant
2/14/2022 5:33:25 PM Request for Review Comments returned by PCD Project Manager
2/14/2022 2:58:43 PM Request for Review Comments returned by PCD Engineering Division
2/13/2022 12:20:35 PM Request for Review Comments returned by Widefield SD 3
2/10/2022 5:20:03 PM Request for Review Comments returned by EPC Stormwater Review
2/7/2022 10:25:14 AM Request for Review Comments returned by Colorado Geological Survey
2/2/2022 11:05:34 AM Request for Review Comments sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Ben Sheets on behalf of Fountain
1/31/2022 4:40:18 PM Submission request sent to Applicant
1/31/2022 4:21:14 PM Request for Review Comments returned by County Attorney - Water
1/21/2022 8:53:02 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
1/20/2022 1:43:35 PM Submission request sent to Applicant
1/20/2022 1:42:52 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
1/20/2022 1:42:09 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
1/20/2022 1:42:06 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
1/20/2022 1:42:04 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Heather on behalf of City of Fountain Electric
1/20/2022 1:38:40 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Brandon Bernard on behalf of Widefield Water & San
1/20/2022 1:38:38 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by COO Dave Gish on behalf of Widefield SD 3
1/20/2022 1:38:35 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Richard Davis on behalf of Security Water District
1/20/2022 1:38:33 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Roy Heald on behalf of Security Water & Sanitation District
1/20/2022 1:38:30 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Jay Adriansen on behalf of Security Sanitation District
1/20/2022 1:38:28 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by on behalf of Security Fire Protection District
1/20/2022 1:38:26 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
1/20/2022 1:38:24 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
1/20/2022 1:38:21 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Edi Anderson on behalf of County Attorney - Water
1/20/2022 1:38:19 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Kari Parsons on behalf of PCD Project Manager
1/20/2022 1:38:15 PM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD Prelim Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/20/2022 1:10:40 PM Submission request canceled
1/20/2022 12:55:37 PM Submission request sent to Applicant
1/20/2022 12:54:36 PM Submission Triaged
1/20/2022 7:05:37 AM Submission received from Applicant
1/18/2022 2:32:41 PM Submission request sent to Applicant
12/6/2021 8:44:55 PM Request for Review Comments returned by EPC Health Department
11/19/2021 10:36:24 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
10/26/2021 11:08:59 AM Request for Review Comments returned by Colorado Division of Water Resources
10/25/2021 11:18:39 AM Fees paid: 10/25/2021 (Receipt: 1005292)
10/21/2021 1:23:07 PM Submission request sent to Applicant
10/21/2021 1:18:37 PM Request for Review Comments returned by PCD Engineering Division
10/21/2021 1:16:51 PM Request for Review Comments returned by PCD Project Manager
10/21/2021 12:29:34 PM Payment Request sent: 10/21/2021
10/20/2021 3:11:37 PM File # Assigned: PUDSP2111
10/19/2021 2:04:13 PM Request for Review Comments returned by Colorado Parks and Wildlife
10/14/2021 2:24:05 PM Request for Review Comments returned by EPC Stormwater Review
10/14/2021 11:12:15 AM Request for Review Comments returned by Parks Advisory Board
10/7/2021 9:40:18 AM Request for Review Comments returned by Fountain
10/6/2021 2:42:25 PM Request for Review Comments returned by EPC Parks Department
10/5/2021 1:34:51 PM Request for Review Comments returned by Pikes Peak Regional Building Department
10/5/2021 8:48:51 AM Request for Review Comments returned by EPC Environmental Services
10/4/2021 3:12:33 PM Request for Review Comments returned by Colorado Geological Survey
10/4/2021 10:50:49 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
10/1/2021 6:59:50 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/28/2021 3:29:56 PM Request for Review Comments returned by Widefield SD 3
9/23/2021 10:56:55 AM Request for Review Comments returned by 911 Authority - El Paso/Teller County
9/16/2021 1:41:20 PM Request for Review Comments returned by County Attorney - Water
9/16/2021 10:08:49 AM Request for Review Comments returned by Fountain Mutual Irrigation Company
9/16/2021 8:24:07 AM Request for Review Comments returned by US Postal Service
9/14/2021 11:12:41 AM Request for Review Comments returned by RBD Floodplain
9/14/2021 11:09:34 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Brandon Bernard on behalf of Widefield Water & San
9/14/2021 11:09:31 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by COO Dave Gish on behalf of Widefield SD 3
9/14/2021 11:09:29 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Richard Davis on behalf of Security Water District
9/14/2021 11:09:27 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Roy Heald on behalf of Security Water & Sanitation District
9/14/2021 11:09:25 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Jay Adriansen on behalf of Security Sanitation District
9/14/2021 11:09:23 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by on behalf of Security Fire Protection District
9/14/2021 11:09:21 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by General Email on behalf of Mountain View Electric Association, Inc.
9/14/2021 11:09:19 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
9/14/2021 11:09:16 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
9/14/2021 11:09:16 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Keith Curtis on behalf of RBD Floodplain
9/14/2021 11:09:14 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Kristy Martinez on behalf of Fountain
9/14/2021 11:09:09 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/14/2021 11:09:06 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Katie Carleo on behalf of Colorado Springs Planning & Community Development
9/14/2021 11:09:04 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Fire Protection Engineer II Steve Smith on behalf of Colorado Springs Fire Department
9/14/2021 11:09:02 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Airport Planner Kevin Keith on behalf of Colorado Springs Airport Advisory Commission
9/14/2021 11:08:59 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Heather on behalf of City of Fountain Electric
9/14/2021 11:08:57 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Joe Valdez on behalf of Black Hills Energy-Aquila
9/14/2021 11:08:54 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
9/14/2021 11:08:52 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
9/14/2021 11:08:50 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
9/14/2021 11:08:48 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Elaine Kelly on behalf of US Postal Service
9/14/2021 11:08:46 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Kimberly Berscheid on behalf of Colorado Parks and Wildlife
9/14/2021 11:08:40 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Colorado Geological Survey on behalf of Colorado Geological Survey
9/14/2021 11:08:38 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Joanna Williams on behalf of Colorado Division of Water Resources
9/14/2021 11:08:36 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
9/14/2021 11:08:34 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by on behalf of Parks Advisory Board
9/14/2021 11:08:32 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/14/2021 11:08:29 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Commander John Padgett on behalf of EPC Sheriff's Department
9/14/2021 11:08:26 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by on behalf of EPC Parks Department
9/14/2021 11:08:23 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Catherine McGarvy on behalf of EPC Health Department
9/14/2021 11:08:05 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Kathy Andrew on behalf of EPC Environmental Services
9/14/2021 11:08:02 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Edi Anderson on behalf of County Attorney - Water
9/14/2021 11:07:59 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Kari Parsons on behalf of PCD Project Manager
9/14/2021 11:07:56 AM Request for Review Comments email sent for Project Cottages at Mesa Ridge PUD for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/14/2021 10:52:26 AM Fees paid: 9/14/2021 (Receipt: 1005093)
9/14/2021 9:59:38 AM Payment Request sent: 9/14/2021
9/14/2021 9:59:38 AM File # Assigned: PUD212
9/14/2021 9:59:29 AM Submission Triaged
9/10/2021 12:31:24 PM Submission received from Applicant
8/24/2021 11:21:16 AM Submission request sent to Applicant
8/24/2021 11:20:54 AM Submission Triaged
8/24/2021 6:47:33 AM Submission received from Applicant
7/8/2021 11:53:30 AM Submission request sent to Applicant
7/6/2021 2:24:51 PM Project Manager Assigned: Kari Parsons
7/6/2021 2:24:51 PM EA Assigned: EA2054
7/6/2021 2:24:50 PM Project Created