Project Details

Search


File Number
PPR2018
Project Name
Liberty Tree Site Development Plan
Description
Parking lot addition
Parcels
4232302001 4232302001
Applicant
Carhuff+Cueva Architects
David Kline ( Dave_Kline@matrixdesigngroup.com )
(719) 575-0100
David Kline ( Dave_Kline@matrixdesigngroup.com )
(719) 575-0100
File Prefix
PPR - Plot Plan Review
Year
2020
Project Manager
Petra Rangel
Status
Closed
Created
4/2/2020 10:32:41 AM

View: Review Comments



Additional Documents (3)

Link Document Comment
View Deviation Request No 2 Turn Lane Length Approved
View Comments 5-5-2021
View Pavement Report -approved


Review Documents (32)

Link Document Date
View Application/Petition Form 6/29/2020 3:41:46 PM
View Grading & Erosion Control checklist 12/10/2020 4:17:46 PM
View Legal Description (MS WORD Version required) 4/29/2020 5:12:18 PM
View Letter of Intent 9/2/2020 5:09:06 PM
View Title Commitment (Current within 30 days of submittal) 5/1/2020 4:34:17 PM
View Vicinity/Location Map 4/29/2020 5:12:22 PM
View Erosion and Stormwater Quality Control Permit (ESQCP) 9/22/2020 2:41:52 PM
View Financial Assurance Forms 12/10/2020 4:17:41 PM
View PBMP Applicability Form 5/6/2020 1:37:27 PM
View SWMP checklist 12/10/2020 4:17:47 PM
View Construction Drawings (Plans/Profiles) 4/5/2021 3:57:44 PM
View Grading & Erosion Control Plan 12/10/2020 4:17:43 PM
View Landscape Plan drawings 9/18/2020 8:26:24 AM
View Lighting Plan 9/2/2020 5:09:07 PM
View Sign Plan 6/29/2020 3:44:34 PM
View Site Development Plan 4/5/2021 3:57:47 PM
View Storm Water Management Plan (SWMP) 12/10/2020 4:17:44 PM
View Drainage Report - Final 1/28/2021 11:15:46 AM
View Traffic Impact Study 3/23/2021 4:01:35 PM
View Detention Maintenance Agreement (MS WORD version required - attachments included) 1/28/2021 11:15:46 AM
View CD Compiled Comment Responses 6/29/2020 3:51:29 PM
View Construction Documents 3/23/2021 3:42:54 PM
View Deviation Request Form 9/22/2020 2:41:55 PM
View Drainage Report 3/23/2021 3:42:59 PM
View Letter of Responsibility 6/29/2020 3:47:13 PM
View Private Detention Pond Exhibit 1/28/2021 12:22:31 PM
View Referral Compiled Comment Responses 6/29/2020 3:51:33 PM
View Reports Compiled Comment Responses 6/29/2020 3:51:34 PM
View Revised Striping Plan 8/19/2021 3:55:50 PM
View SDP Compiled Comment Responses 6/29/2020 3:51:32 PM
View Sign and marking plan 6/29/2020 3:47:12 PM
View Site Development Plan 3/23/2021 3:43:03 PM



Events (179)

Date Comment
9/8/2022 3:47:25 PM Project Closed
9/8/2022 3:47:25 PM Project Cancelled: 9/8/2022
8/30/2021 8:49:54 AM Submission request sent to Applicant
8/25/2021 7:09:50 AM Request for Review Comments returned by PCD Engineering Division
8/19/2021 3:56:57 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
8/19/2021 3:56:30 PM Project reopened for Review Comments
4/7/2021 3:39:48 PM Project Closed
4/7/2021 3:39:48 PM Project Approved: 4/7/2021
4/6/2021 5:12:18 PM Request for Review Comments returned by PCD Engineering Division
4/6/2021 7:44:47 AM Request for Review Comments returned by PCD Project Manager
4/5/2021 4:15:37 PM Submission Triaged
4/5/2021 3:58:00 PM Submission received from Applicant
4/5/2021 10:35:54 AM Submission request sent to Applicant
4/3/2021 12:17:55 AM Request for Review Comments returned by County Attorney - Development Review
4/2/2021 6:58:53 PM Request for Review Comments returned by EPC Stormwater Review
3/23/2021 4:15:34 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
3/23/2021 4:15:26 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
3/23/2021 4:15:24 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
3/23/2021 4:15:22 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
3/23/2021 4:15:20 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
3/23/2021 4:15:16 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
3/23/2021 4:11:54 PM Submission Triaged
3/23/2021 4:03:08 PM Submission received from Applicant
3/1/2021 10:41:09 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
2/23/2021 10:07:19 AM Request for Review Comments returned by County Attorney - Development Review
2/16/2021 2:48:00 PM Submission request sent to Applicant
2/15/2021 12:16:59 PM Request for Review Comments returned by PCD Engineering Division
2/12/2021 9:37:00 AM Request for Review Comments returned by PCD Project Manager
2/10/2021 4:14:18 PM Request for Review Comments returned by EPC Stormwater Review
1/28/2021 12:24:21 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
1/28/2021 12:24:14 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
1/28/2021 12:24:12 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
1/28/2021 12:24:10 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
1/28/2021 12:24:06 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/28/2021 12:20:27 PM Submission Triaged
1/28/2021 11:16:19 AM Submission received from Applicant
1/6/2021 2:51:14 PM Submission request sent to Applicant
1/6/2021 2:35:13 PM Request for Review Comments returned by County Attorney - Development Review
1/5/2021 2:10:25 PM Submission request sent to Applicant
1/5/2021 1:59:36 PM Request for Review Comments returned by PCD Project Manager
1/4/2021 2:26:46 PM Request for Review Comments returned by PCD Engineering Division
1/4/2021 8:08:29 AM Request for Review Comments email resent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/1/2021 4:46:31 PM Request for Review Comments returned by PCD Engineering Division
12/23/2020 8:09:43 AM Request for Review Comments returned by EPC Stormwater Review
12/14/2020 7:41:19 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
12/14/2020 7:41:15 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/11/2020 8:55:18 AM Submission Triaged
12/11/2020 8:41:11 AM Submission received from Applicant
12/11/2020 8:32:33 AM Submission request sent to Applicant
12/11/2020 7:53:41 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
12/11/2020 7:53:39 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Melissa Andrews on behalf of Falcon School District 49
12/11/2020 7:53:35 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
12/11/2020 7:53:33 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
12/11/2020 7:53:31 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
12/11/2020 7:53:22 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
12/11/2020 7:53:20 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
12/11/2020 7:53:16 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
12/11/2020 7:47:57 AM Submission Triaged
12/10/2020 4:18:17 PM Submission received from Applicant
12/10/2020 2:21:32 PM Submission Triaged
12/10/2020 1:44:31 PM Submission request sent to Applicant
12/10/2020 1:34:13 PM Submission received from Applicant
12/10/2020 1:05:10 PM Submission request sent to Applicant
11/5/2020 2:34:52 PM Submission request sent to Applicant
11/5/2020 2:02:22 PM Request for Review Comments returned by County Attorney - Development Review
10/27/2020 10:23:23 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
10/27/2020 10:22:53 AM Submission Triaged
10/27/2020 10:04:50 AM Submission received from Applicant
10/22/2020 9:47:41 AM Submission request sent to Applicant
9/28/2020 8:30:39 AM Submission request sent to Applicant
9/26/2020 9:18:57 PM Request for Review Comments returned by County Attorney - Development Review
9/24/2020 4:15:13 PM Request for Review Comments returned by PCD Engineering Division
9/24/2020 9:19:23 AM Request for Review Comments returned by PCD Project Manager
9/24/2020 9:18:39 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
9/24/2020 9:18:35 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/23/2020 1:57:17 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
9/22/2020 4:01:28 PM Submission Triaged
9/22/2020 2:43:43 PM Submission received from Applicant
9/22/2020 12:46:25 PM Submission request sent to Applicant
9/21/2020 2:38:07 PM Submission request sent to Applicant
9/21/2020 2:11:54 PM Request for Review Comments returned by PCD Project Manager
9/21/2020 1:54:47 PM Request for Review Comments returned by PCD Engineering Division
9/21/2020 12:57:53 PM Request for Review Comments returned by EPC Stormwater Review
9/18/2020 8:12:22 AM Request for Review Comments email resent for Project Liberty Tree Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/17/2020 11:35:50 AM Request for Review Comments returned by EPC Stormwater Review
9/8/2020 1:42:30 PM Request for Review Comments returned by County Attorney - Development Review
9/3/2020 1:07:30 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
9/3/2020 12:08:50 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
9/3/2020 12:08:48 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/3/2020 11:53:07 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
9/3/2020 11:53:06 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Melissa Andrews on behalf of Falcon School District 49
9/3/2020 11:53:05 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
9/3/2020 11:53:03 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
9/3/2020 11:53:02 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
9/3/2020 11:53:01 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
9/3/2020 11:52:58 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
9/3/2020 11:52:57 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
9/3/2020 11:52:55 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
9/3/2020 8:24:18 AM Submission Triaged
9/2/2020 5:12:49 PM Submission received from Applicant
8/28/2020 2:08:39 PM Submission request sent to Applicant
8/27/2020 12:21:55 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
8/27/2020 12:18:30 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
7/30/2020 3:30:06 PM Submission request sent to Applicant
7/30/2020 3:04:31 PM Request for Review Comments returned by PCD Engineering Division
7/30/2020 2:56:11 PM Request for Review Comments email resent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/30/2020 12:43:44 PM Request for Review Comments returned by PCD Engineering Division
7/30/2020 10:30:19 AM Request for Review Comments returned by PCD Project Manager
7/29/2020 2:37:00 PM Request for Review Comments returned by EPC Stormwater Review
7/24/2020 8:39:55 AM Request for Review Comments returned by Pikes Peak Regional Building Department
7/15/2020 11:37:38 AM Request for Review Comments returned by El Paso County Conservation Dist
7/14/2020 4:01:16 PM Request for Review Comments returned by County Attorney - Development Review
7/9/2020 1:58:42 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
7/9/2020 1:58:40 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
7/9/2020 1:58:39 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/9/2020 10:40:31 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
7/9/2020 8:04:57 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
7/9/2020 8:04:56 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Melissa Andrews on behalf of Falcon School District 49
7/9/2020 8:04:55 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
7/9/2020 8:04:54 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
7/9/2020 8:04:52 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
7/9/2020 8:04:50 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
7/9/2020 8:04:48 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
7/9/2020 8:04:47 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
7/9/2020 8:04:44 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
7/9/2020 8:04:43 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
7/9/2020 8:04:41 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
7/9/2020 7:53:00 AM Submission Triaged
7/8/2020 4:10:44 PM Submission received from Applicant
7/7/2020 1:40:01 PM Submission request sent to Applicant
7/7/2020 1:37:33 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
7/7/2020 11:25:21 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
6/29/2020 11:07:10 AM Submission request sent to Applicant
6/9/2020 2:59:49 PM Submission request sent to Applicant
6/9/2020 2:35:23 PM Request for Review Comments returned by PCD Project Manager
6/9/2020 11:50:57 AM Request for Review Comments returned by PCD Engineering Division
6/8/2020 5:12:33 PM Request for Review Comments returned by EPC Stormwater Review
6/4/2020 10:41:15 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
6/4/2020 10:41:14 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
6/4/2020 10:41:12 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
6/3/2020 3:00:27 PM Request for Review Comments returned by Woodmen Hills Metro
6/3/2020 2:45:06 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
6/1/2020 2:43:23 PM Request for Review Comments returned by County Attorney - Development Review
5/27/2020 3:45:07 PM Request for Review Comments returned by Pikes Peak Regional Building Department
5/25/2020 10:47:22 AM Request for Review Comments returned by Falcon Fire Protection District
5/20/2020 3:50:25 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/20/2020 10:31:09 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/20/2020 10:12:56 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
5/20/2020 10:12:55 AM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/20/2020 6:51:20 AM Request for Review Comments returned by Meadow Lake Airport Association
5/14/2020 12:09:39 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Jerry Jacobson on behalf of Woodmen Hills Metro
5/14/2020 12:09:38 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
5/14/2020 12:09:37 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
5/14/2020 12:09:36 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Melissa Andrews on behalf of Falcon School District 49
5/14/2020 12:09:36 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District
5/14/2020 12:09:35 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist
5/14/2020 12:09:34 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/14/2020 12:09:33 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
5/14/2020 12:09:32 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
5/14/2020 12:09:31 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office
5/14/2020 12:09:30 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
5/14/2020 12:09:28 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
5/14/2020 12:09:27 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
5/14/2020 12:09:24 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
5/14/2020 12:09:23 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Petra Rangel on behalf of PCD Project Manager
5/14/2020 12:09:22 PM Request for Review Comments email sent for Project Liberty Tree Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
5/13/2020 1:28:29 PM Fees paid: 5/13/2020 (Receipt: 1002738)
5/6/2020 2:00:21 PM Payment Request sent: 5/6/2020
5/6/2020 2:00:21 PM File # Assigned: PPR2018
5/6/2020 2:00:18 PM Submission Triaged
5/6/2020 1:37:36 PM Submission received from Applicant
5/5/2020 12:30:22 PM Submission request sent to Applicant
5/5/2020 7:47:28 AM Submission request sent to Applicant
5/3/2020 7:50:43 PM Submission request sent to Applicant
5/3/2020 7:50:33 PM Submission Triaged
5/1/2020 4:34:46 PM Submission received from Applicant
4/7/2020 10:20:57 AM Submission request sent to Applicant
4/2/2020 10:32:52 AM Project Manager Assigned: Petra Rangel
4/2/2020 10:32:52 AM Project Created