Project Details

Search


File Number
PUD173
Project Name
Retreat at TimberRidge PUD
Description
A request for a PUD Single-family development.
Location
The site is located east of Vollmer, and north of the Sterling Ranch development.
Parcels
5200000277 5200000277 5200000393 5200000393 5200000397 5200000397 5200000398 5200000398 5222000017 5222000017 5222000023 5222000023 5227000001 5227000001 5227000003 5227000003 5227000004 5227000004 5228000019 5228000019
Applicant
N.E.S.
John Maynard ( jmaynard@nescolorado.com )
(719) 884-1369
John Maynard ( jmaynard@nescolorado.com )
(719) 884-1369
EA Number
17-4
File Prefix
PUD - Planned Unit Development
Year
2017
Project Manager
Kari Parsons
Status
Closed
Created
4/3/2017 1:34:04 PM

View: Review Comments



Additional Documents (28)

Link Document Comment
View Dept. of Army
View Deviations -Approved
View Letter from adjacent developer regarding access depicted on PUD plan
View Hearing notification
View poster 1
View poster 2
View poster 3
View Adjacent property letters
View Approved MDDP
View Planning Commission Denial Letter 7-0
View Newspaper Advertisement
View PC Staff Report
View BoCC Staff Report
View Emails in Opposition
View Emails in Opposition
View Emails in Opposition
View Emails in Opposition
View Letter in Opposition
View Letters to Commissioner VanderWerf
View Letters to Commissioner VanderWerf
View Letters to Commissioner VanderWerf
View Letters to Commissioner VanderWerf
View Support Letter
View Adjacent property notification
View BoCC Resolution Recorded
View BoCC Approval Letter
View Recorded PUD Plan
View Court Order to Dismiss 106


Review Documents (39)

Link Document Date
View Adjacent Property Owner Notification 12/6/2017 5:18:19 PM
View Application/Petition Form 1/16/2018 11:34:51 AM
View Legal Description 12/6/2017 3:32:22 PM
View Letter of Intent 2/20/2018 11:41:25 AM
View Title/Ownership & Encumbrance Statement 4/26/2017 10:39:57 AM
View Vicinity/Location Map 4/10/2017 2:37:58 PM
View Additional Exhibits 4/17/2017 11:36:34 AM
View Applicant Comment Response Letter 1/29/2018 10:28:45 AM
View Colorado Geological Survey Receipt 4/10/2017 2:15:50 PM
View Easement(s) 9/5/2017 5:07:40 PM
View Mineral Rights Certification 4/5/2017 9:36:12 AM
View Neighborhood Meeting Summary 4/19/2017 1:55:36 PM
View Landscape Plan drawings (24" x 36") 1/29/2018 2:09:54 PM
View Zoning Map 1/22/2018 10:50:59 AM
View Wetlands Analysis Report 12/6/2017 5:09:39 PM
View Wildlife Report 4/4/2017 12:01:55 PM
View Electric Provider Commitment Letter 12/6/2017 5:18:21 PM
View Fire Commitment Letter 4/19/2017 1:32:40 PM
View Natural Gas Commitment Letter 1/16/2018 11:34:52 AM
View FEMA LOMR, CLOMR, LOMA 4/10/2017 3:28:22 PM
View Natural Landforms, Vegetation, Riparian Analysis 12/6/2017 5:13:37 PM
View Soils & Geology Report 12/5/2017 8:28:25 AM
View Traffic Impact Study 1/29/2018 9:29:42 AM
View Wildland Fire & Hazard Mitigation Plan 12/6/2017 4:34:46 PM
View Commitment letter from waste water service provider 12/6/2017 5:18:20 PM
View Commitment letter from water service provider 12/6/2017 5:18:20 PM
View Cooke/Pilbrow letter of support 1/23/2018 9:22:57 AM
View Detail Plans, Signs & Lighting 12/6/2017 5:21:05 PM
View Development Guidelines 1/24/2018 9:02:44 AM
View Development Plan 2/15/2018 2:28:49 PM
View Deviation for temporary driveway access to west side of Vollmer Road 1/29/2018 9:29:44 AM
View Maintenance Agreement 4/10/2017 2:15:52 PM
View Master Development Drainage Plan (MDDP) 2/26/2018 9:31:30 AM
View Phasing Plan 1/29/2018 2:09:54 PM
View Response Letter 2/15/2018 2:28:50 PM
View Sterling Ranch Letter of Support 1/16/2018 11:34:53 AM
View Title Commitment 4/14/2017 10:30:05 AM
View Turner Letter of Support 1/16/2018 11:34:53 AM
View Visual Impact Analysis 7/11/2017 10:16:27 AM



Events (216)

Date Comment
4/13/2018 12:00:00 AM Project Closed
4/12/2018 3:29:35 PM Project Approved: 4/12/2018
3/17/2018 8:41:00 PM Request for Review Comments returned by Black Forest Land Use Committee
3/13/2018 7:29:47 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Terry Stokka on behalf of Black Forest Land Use Committee
3/8/2018 2:32:32 PM Request for Review Comments returned by Woodmen Hills Metro
3/7/2018 11:31:03 AM Request for Review Comments returned by PCD Project Manager
3/7/2018 11:28:07 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Kari Parsons on behalf of PCD Project Manager
2/26/2018 12:55:45 PM Submission Triaged
2/26/2018 9:31:55 AM Submission received from Applicant
2/26/2018 8:10:30 AM Submission request sent to Applicant
2/24/2018 8:35:11 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
2/20/2018 11:42:18 AM Submission Triaged
2/20/2018 11:41:47 AM Submission received from Applicant
2/20/2018 11:39:23 AM Submission request sent to Applicant
2/20/2018 11:38:29 AM Submission request canceled
2/20/2018 11:31:33 AM Submission request sent to Applicant
2/20/2018 11:30:02 AM Submission request canceled
2/20/2018 9:13:33 AM Submission request sent to Applicant
2/20/2018 9:12:28 AM Submission Triaged
2/20/2018 8:37:14 AM Submission received from Applicant
2/20/2018 7:29:36 AM Submission request sent to Applicant
2/20/2018 7:28:52 AM Submission request canceled
2/14/2018 9:30:53 PM Request for Review Comments returned by Black Forest Trails Association
2/13/2018 2:39:37 PM Submission request sent to Applicant
2/12/2018 4:48:00 PM Submission request sent to Applicant
2/12/2018 4:46:47 PM Request for Review Comments returned by PCD Project Manager
2/12/2018 4:09:10 PM Request for Review Comments returned by PCD Engineering Division
2/12/2018 4:36:06 AM Request for Review Comments returned by Black Forest Land Use Committee
2/8/2018 5:12:07 PM Submission Triaged
2/8/2018 2:58:42 PM Submission received from Applicant
2/6/2018 9:39:58 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Terry Stokka on behalf of Black Forest Land Use Committee
2/6/2018 9:37:55 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by NEPCO Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
2/6/2018 9:37:53 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Cheryl Pixley on behalf of Black Forest Trails Association
2/6/2018 9:36:21 AM Submission request sent to Applicant
1/29/2018 2:58:23 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Kari Parsons on behalf of PCD Project Manager
1/29/2018 2:58:21 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
1/29/2018 2:56:57 PM Submission Triaged
1/29/2018 2:10:31 PM Submission received from Applicant
1/16/2018 6:57:45 PM Request for Review Comments returned by Black Forest Trails Association
1/16/2018 10:44:34 AM Request for Review Comments returned by EPC Parks Department
1/16/2018 7:54:06 AM Request for Review Comments email resent for Project Retreat at Timber Ridge PUD for review by Ross Williams on behalf of EPC Parks Department
1/9/2018 11:16:00 AM Submission request sent to Applicant
1/9/2018 11:09:34 AM Request for Review Comments returned by PCD Project Manager
1/9/2018 10:59:13 AM Request for Review Comments returned by PCD Engineering Division
1/9/2018 10:31:47 AM Request for Review Comments returned by El Paso County Conservation Dist
1/9/2018 10:04:26 AM Request for Review Comments returned by EPC Parks Department
1/9/2018 9:57:04 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Jason Meyer on behalf of EPC Parks Department
1/5/2018 11:01:55 PM Request for Review Comments returned by EPC Health Department
1/4/2018 2:49:46 PM Request for Review Comments returned by Lewis Palmer 38
12/29/2017 11:20:18 AM Request for Review Comments returned by EPC Parks Department
12/27/2017 5:18:42 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
12/22/2017 10:08:45 AM Request for Review Comments returned by Pikes Peak Regional Building Department
12/20/2017 3:02:19 PM Request for Review Comments returned by Falcon Fire Protection District
12/19/2017 4:19:40 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
12/18/2017 9:56:44 AM Request for Review Comments returned by Colorado Geological Survey
12/11/2017 3:11:23 PM Request for Review Comments returned by EPC Environmental Services
12/11/2017 11:02:13 AM Request for Review Comments returned by Colorado State Forest Service
12/7/2017 1:56:41 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
12/7/2017 1:56:39 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
12/7/2017 1:56:36 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Melissa Andrews on behalf of Falcon 49
12/7/2017 1:56:34 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Planning Dev on behalf of Colorado Springs Planning & Community Development
12/7/2017 1:56:32 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
12/7/2017 1:56:30 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Susan Davies on behalf of Trails and Open Space Coalition
12/7/2017 1:56:27 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by RBD Enumerations x x on behalf of Pikes Peak Regional Building Department
12/7/2017 1:56:25 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by NEPCO Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
12/7/2017 1:56:23 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
12/7/2017 1:56:21 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Pamela Davidson on behalf of El Paso County Conservation Dist
12/7/2017 1:56:18 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Cheryl Pixley on behalf of Black Forest Trails Association
12/7/2017 1:56:16 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Terry Stokka on behalf of Black Forest Land Use Committee
12/7/2017 1:56:14 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
12/7/2017 1:56:12 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
12/7/2017 1:56:09 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Larry Long on behalf of Colorado State Forest Service
12/7/2017 1:56:07 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
12/7/2017 1:56:05 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Colorado Geological Survey on behalf of Colorado Geological Survey
12/7/2017 1:56:03 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Lisa Peterson on behalf of Woodmen Hills Metro
12/7/2017 1:56:00 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Autumn Mason on behalf of Sterling Ranch Metro Dist
12/7/2017 1:55:58 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Leon Gomes on behalf of Paint Brush Hills Metro
12/7/2017 1:55:56 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Cheryl Wangeman on behalf of Lewis Palmer 38
12/7/2017 1:55:53 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Scott Ridings on behalf of Donald Wescott Fire Protection District
12/7/2017 1:55:51 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Bryan Jack on behalf of Black Forest Fire Protection District
12/7/2017 1:55:49 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Dr. Mark Hatchell on behalf of Academy SD 20 Building Fund
12/7/2017 1:55:47 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Sebastian Schwender on behalf of Black Hills Energy-Aquila
12/7/2017 1:55:44 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Dan Ausec on behalf of EPC Sheriff's Department
12/7/2017 1:55:42 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
12/7/2017 1:55:40 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Jason Meyer on behalf of EPC Parks Department
12/7/2017 1:55:38 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Ross Williams on behalf of EPC Parks Department
12/7/2017 1:55:35 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by on behalf of EPC Health Department
12/7/2017 1:55:33 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Program Supervisor Joe Lomeli on behalf of EPC Health Department
12/7/2017 1:55:31 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Administration Christine Juarez on behalf of EPC Health Department
12/7/2017 1:55:29 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Kathy Andrew on behalf of EPC Environmental Services
12/7/2017 1:55:27 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Edi Anderson on behalf of EPC County Attorney's Office
12/7/2017 1:55:24 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Kari Parsons on behalf of PCD Project Manager
12/7/2017 1:55:22 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Jeff Rice on behalf of PCD Engineering Division
12/7/2017 1:37:02 PM Submission Triaged
12/6/2017 5:22:41 PM Submission received from Applicant
11/20/2017 7:13:17 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
11/20/2017 3:55:57 PM Submission request sent to Applicant
11/20/2017 1:19:27 PM Submission request canceled
10/4/2017 3:07:18 PM Submission request sent to Applicant
9/22/2017 4:27:06 PM Request for Review Comments returned by PCD Engineering Division
9/22/2017 3:31:44 PM Request for Review Comments returned by Falcon Fire Protection District
9/21/2017 9:16:40 AM Submission request sent to Applicant
9/21/2017 9:12:52 AM Request for Review Comments returned by PCD Project Manager
9/21/2017 9:01:15 AM Request for Review Comments returned by Black Forest Fire Protection District
9/21/2017 6:52:49 AM Submission Triaged
9/20/2017 11:47:03 AM Request for Review Comments returned by Black Forest Fire Protection District
9/19/2017 5:24:24 PM Submission received from Applicant
9/19/2017 12:28:57 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
9/18/2017 2:13:33 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Chief Trent Harwig on behalf of Falcon Fire Protection District
9/18/2017 2:13:32 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Melissa Andrews on behalf of Falcon 49
9/18/2017 2:13:31 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Bryan Jack on behalf of Black Forest Fire Protection District
9/14/2017 4:36:04 PM Submission request sent to Applicant
9/14/2017 3:23:19 PM Submission Triaged
9/14/2017 2:36:36 PM Submission received from Applicant
9/14/2017 11:28:52 AM Submission request sent to Applicant
9/7/2017 7:58:08 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
9/7/2017 7:58:07 AM Request for Review Comments sent to Mountain View Electric Association, Inc.
9/7/2017 7:57:03 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Cheryl Pixley on behalf of Black Forest Trails Association
9/7/2017 7:57:01 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Terry Stokka on behalf of Black Forest Land Use Committee
9/7/2017 7:57:00 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Autumn Mason on behalf of Sterling Ranch Metro Dist
9/7/2017 7:56:58 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Kari Parsons on behalf of PCD Project Manager
9/7/2017 7:56:57 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Jeff Rice on behalf of PCD Engineering Division
9/7/2017 7:51:37 AM Submission Triaged
9/6/2017 4:35:28 PM Submission received from Applicant
8/7/2017 11:17:14 AM Request for Review Comments returned by Colorado Geological Survey
8/2/2017 3:32:43 PM Request for Review Comments returned by Pikes Peak Regional Building Department
8/2/2017 10:06:26 AM Request for Review Comments returned by EPC Environmental Services
8/1/2017 7:58:57 AM Request for Review Comments returned by Black Forest Fire Protection District
7/31/2017 2:24:20 PM Request for Review Comments returned by EPC Parks Department
7/31/2017 2:08:03 PM Submission request sent to Applicant
7/31/2017 2:04:47 PM Request for Review Comments returned by PCD Engineering Division
7/31/2017 1:50:55 PM Request for Review Comments returned by PCD Project Manager
7/25/2017 3:11:04 PM Request for Review Comments returned by Black Forest Trails Association
7/12/2017 3:39:53 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by RBD Enumerations x x on behalf of Pikes Peak Regional Building Department
7/12/2017 3:39:52 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
7/12/2017 3:39:51 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Cheryl Pixley on behalf of Black Forest Trails Association
7/12/2017 3:39:50 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Terry Stokka on behalf of Black Forest Land Use Committee
7/12/2017 3:39:49 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
7/12/2017 3:39:48 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Jason Meyer on behalf of EPC Parks Department
7/12/2017 3:39:47 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Ross Williams on behalf of EPC Parks Department
7/12/2017 3:39:46 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Kathy Andrew on behalf of EPC Environmental Services
7/12/2017 3:39:45 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Edi Anderson on behalf of EPC County Attorney's Office
7/12/2017 3:39:44 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Kari Parsons on behalf of PCD Project Manager
7/12/2017 3:39:43 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Jeff Rice on behalf of PCD Engineering Division
7/12/2017 3:36:42 PM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Colorado Geological Survey on behalf of Colorado Geological Survey
7/12/2017 3:36:39 PM Request for Review Comments sent to Colorado Geological Survey
7/12/2017 2:34:02 PM Submission Triaged
7/12/2017 2:27:21 PM Submission received from Applicant
6/20/2017 2:37:55 PM Submission request sent to Applicant
6/20/2017 2:36:25 PM Submission request sent to Applicant
6/12/2017 3:13:39 PM Request for Review Comments returned by El Paso County Conservation Dist
6/12/2017 11:41:52 AM Request for Review Comments returned by Colorado Geological Survey
6/6/2017 2:45:25 PM Submission request sent to Applicant
6/6/2017 2:32:00 PM Submission request sent to Applicant
6/2/2017 3:45:40 PM Request for Review Comments returned by EPC Health Department
6/2/2017 9:32:11 AM Request for Review Comments returned by PCD Engineering Division
5/30/2017 8:07:57 AM Submission request sent to Applicant
5/30/2017 7:59:23 AM Request for Review Comments returned by PCD Project Manager
5/30/2017 7:58:19 AM Request for Review Comments returned by PCD Project Manager
5/30/2017 7:45:12 AM Request for Review Comments returned by PCD Project Manager
5/29/2017 9:46:31 PM Request for Review Comments returned by Black Forest Land Use Committee
5/18/2017 4:13:03 PM Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
5/17/2017 11:58:10 PM Request for Review Comments returned by Black Forest Trails Association
5/16/2017 4:32:58 PM Request for Review Comments returned by Sterling Ranch Metro Dist
5/16/2017 3:46:20 PM Request for Review Comments returned by Pikes Peak Regional Building Department
5/16/2017 2:56:51 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/12/2017 11:49:39 AM Request for Review Comments returned by EPC Parks Department
5/11/2017 12:45:34 PM Request for Review Comments returned by Colorado Parks and Wildlife
5/9/2017 10:26:38 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Kari Parsons on behalf of PCD Project Manager
5/8/2017 9:15:47 AM Request for Review Comments returned by EPC County Attorney's Office
4/28/2017 10:55:24 AM Request for Review Comments returned by EPC Environmental Services
4/26/2017 10:48:05 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
4/26/2017 10:48:04 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Planning Dev on behalf of Colorado Springs Planning & Community Development
4/26/2017 10:48:03 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
4/26/2017 10:48:02 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Susan Davies on behalf of Trails and Open Space Coalition
4/26/2017 10:48:01 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by RBD Enumerations x x on behalf of Pikes Peak Regional Building Department
4/26/2017 10:48:00 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Tom Vierzbea on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
4/26/2017 10:47:59 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Pamela Davidson on behalf of El Paso County Conservation Dist
4/26/2017 10:47:58 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Cheryl Pixley on behalf of Black Forest Trails Association
4/26/2017 10:47:57 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Terry Stokka on behalf of Black Forest Land Use Committee
4/26/2017 10:47:56 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
4/26/2017 10:47:54 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
4/26/2017 10:47:53 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Dan Prenzlow on behalf of Colorado Parks and Wildlife
4/26/2017 10:47:52 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Jill M. Carlson on behalf of Colorado Geological Survey
4/26/2017 10:47:51 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Lisa Peterson on behalf of Woodmen Hills Metro
4/26/2017 10:47:50 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Autumn Mason on behalf of Sterling Ranch Metro Dist
4/26/2017 10:47:49 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Leon Gomes on behalf of Paint Brush Hills Metro
4/26/2017 10:47:48 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Cheryl Wangeman on behalf of Lewis Palmer 38
4/26/2017 10:47:47 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Scott Ridings on behalf of Donald Wescott Fire Protection District
4/26/2017 10:47:46 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Bryan Jack on behalf of Black Forest Fire Protection District
4/26/2017 10:47:45 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Dr. Mark Hatchell on behalf of Academy SD 20 Building Fund
4/26/2017 10:47:43 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Stoney David on behalf of Black Hills Energy-Aquila
4/26/2017 10:47:42 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Dan Ausec on behalf of EPC Sheriff's Department
4/26/2017 10:47:41 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
4/26/2017 10:47:40 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Ross Williams on behalf of EPC Parks Department
4/26/2017 10:47:39 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by on behalf of EPC Health Department
4/26/2017 10:47:38 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Kathy Andrew on behalf of EPC Environmental Services
4/26/2017 10:47:37 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Edi Anderson on behalf of EPC County Attorney's Office
4/26/2017 10:47:36 AM Request for Review Comments email sent for Project Retreat at Timber Ridge PUD for review by Jeff Rice on behalf of PCD Engineering Division
4/26/2017 10:41:31 AM Submission Triaged
4/26/2017 10:40:02 AM Submission received from Applicant
4/26/2017 10:37:20 AM Submission request sent to Applicant
4/26/2017 10:32:55 AM Fees paid: 4/26/2017 (Receipt: 1000053)
4/25/2017 4:03:13 PM File # Assigned: PUD173
4/25/2017 3:32:46 PM Submission Triaged
4/25/2017 3:10:15 PM Submission received from Applicant
4/24/2017 11:34:09 AM Submission request sent to Applicant
4/19/2017 2:34:35 PM Submission request sent to Applicant
4/19/2017 2:32:46 PM Submission Triaged
4/19/2017 11:26:06 AM Submission received from Applicant
4/12/2017 8:56:04 AM Submission request sent to Applicant
4/12/2017 8:54:28 AM Submission request sent to Applicant
4/3/2017 3:23:29 PM Submission request sent to Applicant
4/3/2017 1:34:14 PM Project Manager Assigned: Kari Parsons
4/3/2017 1:34:14 PM EA Assigned: 17-4
4/3/2017 1:34:14 PM Project Created