Project Name
COMS 7445 Templeton Gap Rd
Description
a new collocation at the existing telecom tower located at 7445 Templeton Gap Rd. This will include a 10’ tower extension bringing tower height from 100’ to 110’.
Location
Parcels
5307001021 5307001021
Applicant
Crown Castle - Craig Chagnon
Craig Chagnon ( Craig.Chagnon@crowncastle.com )
(801) 979-9077
Craig Chagnon ( Craig.Chagnon@crowncastle.com )
(801) 979-9077
File Number
COM2247
Project Manager
Ashlyn Mathy
Status
Closed
Created
11/1/2022 4:10:14 PM

View: Project Documents



Review Comments (9)

Link Agency Comment
View PCD Project Manager
1/17/2023 1:56:04 PM
sdp minor comments 1/17/2023 1:56:04 PM
PCD Engineering Division
12/5/2022 9:19:46 AM
PCD Engineering has no further comments relating to drainage or transportation. Any approved documents will be uploaded by the project manager.

Reviewed by:
Carlos Hernandez
Review Engineer
carloshernandez@elpasoco.com
12/5/2022 9:19:46 AM
View PCD Project Manager
11/29/2022 8:47:38 AM
Checklist governing letter of intent with planner comments. 11/29/2022 8:47:38 AM
View PCD Project Manager
11/29/2022 8:47:09 AM
Letter of intent with planner comments. Asking for administrative data included on the checklist. 11/29/2022 8:47:09 AM
View PCD Project Manager
11/29/2022 8:37:06 AM
Site plan checklist with planner comments. 11/29/2022 8:37:06 AM
View PCD Project Manager
11/29/2022 8:36:36 AM
Site plan drawing with planner comments. 11/29/2022 8:36:36 AM
View PCD Project Manager
11/15/2022 11:45:24 AM
Planner checklist governing standards for site plan. 11/15/2022 11:45:24 AM
View PCD Project Manager
11/15/2022 11:44:22 AM
Site plan meets the graphic standards requested by the County. All required information on physical layout is present.

Some administrative items aren't fully included on the site plan. Please include information like parcel number, tax schedule number, and parcel size on the site plan or in a separate table. Letter of Intent would also be an appropriate area to include this.

Since the change of height is 10% the project is at the cutoff for substantial change. Since this project is proposing a new lease area outside of what was approved in VA155, road impact fees will be applicable.

The County also requests a letter of intent. Specifically, the LOI should address traffic generation at the site.

All asked for amendments are included in the attached review.
11/15/2022 11:44:22 AM
PCD Engineering Division
11/14/2022 10:57:17 AM
Review 1 comments:

Please include a Letter of Intent and provide the following information.

Letter of Intent
Please submit LOI with proper format and information to include a brief discussion regarding anticipated increase in traffic generation to the tower site on a weekly and or monthly basis from the new proposed lease area. Detail in LOI the extension of the lease area, number of equipment cabinets being added, and work being done. Please confirm the proposed work will not adversely impact adjacent properties, existing stormwater runoff patterns, or roadway users due to the proposed extension of the tower. Recommend use of LOI submission checklist to ensure required information is included on the LOI.
Site Plan
Site plan drawing should include and show the project area with complete detail of existing equipment areas, tower and fence boundaries or expansions to the site if any. The submitted site plan does not show the proposed tower extension.

Ensure PCD File # COM2247 is added to all documents to include LOI and site plan drawings.

Per Resolution 19-471, Road Impact Fees are applicable. Fees will be assessed on the square footage for the new proposed cabinets using the Mini Warehouse land use category.

Reviewed by:
Carlos Hernandez
Review Engineer
carloshernandez@elpasoco.com
11/14/2022 10:57:17 AM