View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
2/7/2023 4:16:58 PM |
Planning has no comments. | 2/7/2023 4:16:58 PM | |
EPC Stormwater Review
2/7/2023 8:07:36 AM |
Review 3: EPC DPW Stormwater comments have been resolved on the following documents: - ESQCP - FAE EPC DPW Stormwater has no further comments. Planner: no re-review necessary. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
2/7/2023 8:07:36 AM | |
PCD Engineering Division
2/6/2023 10:02:47 AM |
There are no further comments relating to drainage or transportation. The project manager will upload any approved documents. | 2/6/2023 10:02:47 AM | |
View |
PCD Project Manager
1/18/2023 1:50:32 PM |
Stormwater comments - ESQCP | 1/18/2023 1:50:32 PM |
View |
PCD Project Manager
1/18/2023 1:45:28 PM |
Engineering comments - FAE | 1/18/2023 1:45:28 PM |
View |
PCD Project Manager
1/18/2023 1:45:12 PM |
Engineering comments on signature blocks | 1/18/2023 1:45:12 PM |
View |
PCD Project Manager
1/18/2023 1:42:25 PM |
Engineering comments on signature block | 1/18/2023 1:42:25 PM |
PCD Engineering Division
1/18/2023 1:02:55 PM |
Review 2 comments will be uploaded by the project manager. Address comments on the following documents: -FAE: update to use 2023 FAE. -Transmission lines CDRS: incomplete signature block. Make sure all engineering documents are signed and stamped by engineer and owner. NOTE TO PLANNER: set review cycle to 5 days. Reviewed By: Lupe Packman Review Engineer lupepackman@elpasoco.com |
1/18/2023 1:02:55 PM | |
EPC Stormwater Review
1/10/2023 8:01:02 PM |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - ESQCP.....(to be uploaded by PM with PCD comments) - FAE..........(to be uploaded by PM with PCD comments) EPC DPW Stormwater comments have been resolved on the following documents: - GEC Plan - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
1/10/2023 8:01:02 PM | |
Colorado Department of Transportation - Pueblo Office
11/28/2022 9:47:26 AM |
CDOT has no comment. There appears to be no impacts to CDOT infrastructure. | 11/28/2022 9:47:26 AM | |
View |
PCD Project Manager
11/15/2022 8:29:17 AM |
GEC - comments (PCD Engineering & EPC Stormwater) | 11/15/2022 8:29:17 AM |
View |
PCD Project Manager
11/15/2022 8:28:54 AM |
FAE - comments (PCD Engineering & EPC Stormwater) | 11/15/2022 8:28:54 AM |
View |
PCD Project Manager
11/15/2022 8:29:34 AM |
ESQCP - comments (EPC Stormwater) | 11/15/2022 8:29:34 AM |
View |
PCD Project Manager
11/15/2022 8:27:36 AM |
CDs - comments (2) | 11/15/2022 8:27:36 AM |
View |
PCD Project Manager
11/15/2022 8:28:34 AM |
CDs - comments (1) (PCD Engineering) | 11/15/2022 8:28:34 AM |
View |
EPC Stormwater Review
11/3/2022 5:14:59 PM |
SWMP Checklist | 11/3/2022 5:14:59 PM |
View |
EPC Stormwater Review
11/3/2022 5:14:38 PM |
SWMP | 11/3/2022 5:14:38 PM |
View |
EPC Stormwater Review
11/3/2022 5:14:25 PM |
PBMP Applicability Form | 11/3/2022 5:14:25 PM |
View |
EPC Stormwater Review
11/3/2022 5:14:10 PM |
GEC Checklist | 11/3/2022 5:14:10 PM |
EPC Stormwater Review
11/3/2022 11:52:24 AM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - ESQCP.........(to be uploaded by PM with PCD comments) - FAE..............(to be uploaded by PM with PCD comments) - GEC Plan.....(to be uploaded by PM with PCD comments) - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer II GlennReese@elpasoco.com |
11/3/2022 11:52:24 AM | |
PCD Engineering Division
11/3/2022 10:10:20 AM |
Review 1 comments will be uploaded by the project manager for the following documents: -CDs -GEC plan -FAE Please note: the entirety of the 8" water line replacement can be excluded from the project review since it appears to be in the right-of-way. Staff recommends obtaining a ROW permit and processing that section of the project through that permit. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
11/3/2022 10:10:20 AM |