View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
4/17/2023 7:27:01 AM |
Comments have been resolved. The Project Manager will upload any approved documents. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
4/17/2023 7:27:01 AM | |
PCD Project Manager
4/11/2023 7:53:50 AM |
Upload signed and stamped docs so project can be approved please. | 4/11/2023 7:53:50 AM | |
PCD Engineering Division
4/11/2023 7:55:08 AM |
Review 2 comments have been resolved. The project manager will upload any approved documents after signed and stamped engineering documents are submitted. Reviewed By: Lupe Packman Review Engineer lupepackman@elpasoco.com |
4/11/2023 7:55:08 AM | |
EPC Stormwater Review
4/10/2023 1:43:48 PM |
Review 2: EPC DPW Stormwater comments have been resolved on the following documents: - FAE - GEC Plan - GEC Checklist Template - ESQCP - SWMP Checklist EPC DPW Stormwater has no further comments. Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
4/10/2023 1:43:48 PM | |
Black Forest Fire Protection District
3/2/2023 4:09:40 PM |
As a commercial project this shall be referred to CSFD for fire review per MOU between CSFD and BFFR. | 3/2/2023 4:09:40 PM | |
Woodmen Hills Metro
2/9/2023 10:16:53 AM |
Woodmen Hills Metropolitan District doesn't have any comments at this time but respectfully reserves the right to comment on any future submittals. | 2/9/2023 10:16:53 AM | |
Colorado Department of Transportation - Pueblo Office
2/8/2023 7:55:53 AM |
A CDOT access permit is not required for this development. If the project involves construction of new or work to existing utilities within CDOT right-of-way the project shall apply for a CDOT utility permit, no utility work within the right-of-way is allowed without a permit. The permit may take 1 week to 1 month depending on the schedule and complexity. Utility permit applications will be submitted online only. | 2/8/2023 7:55:53 AM | |
View |
Colorado Parks and Wildlife
2/3/2023 3:43:42 PM |
2/3/2023 3:43:42 PM | |
View |
EPC Stormwater Review
1/26/2023 6:04:26 PM |
SWMP Checklist_v1 | 1/26/2023 6:04:26 PM |
View |
EPC Stormwater Review
1/26/2023 6:03:49 PM |
ESQCP_v1 | 1/26/2023 6:03:49 PM |
View |
EPC Stormwater Review
1/26/2023 6:03:22 PM |
GEC Checklist Template | 1/26/2023 6:03:22 PM |
View |
EPC Stormwater Review
1/26/2023 6:02:11 PM |
GEC_v1 | 1/26/2023 6:02:11 PM |
View |
EPC Stormwater Review
1/26/2023 6:00:38 PM |
FAE_v1 | 1/26/2023 6:00:38 PM |
View |
EPC Stormwater Review
1/26/2023 5:55:41 PM |
Construction Drawings_v1 | 1/26/2023 5:55:41 PM |
EPC Stormwater Review
1/26/2023 5:59:23 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - FAE.......................(uploaded with PCD comments) - GEC Plan...............(uploaded with PCD comments) - GEC Checklist Template - ESQCP - SWMP Checklist Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
1/26/2023 5:59:23 PM | |
PCD Engineering Division
1/26/2023 3:25:05 PM |
EPC Stormwater will upload comments on the following documents: -FAE -GEC plan -CDRs Reviewed By: Lupe Packman Review Engineer lupepackman@elpasoco.com |
1/26/2023 3:25:05 PM | |
Mountain View Electric Association, Inc.
1/26/2023 10:58:05 AM |
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. | 1/26/2023 10:58:05 AM | |
PCD Engineering Division
1/26/2023 3:07:25 PM |
EPC Stormwater will upload comments. Please address comments on the following documents: -FAE -CDR -GEC plan Reviewed By: Lupe Packman Review Engineer lupepackman@elpasoco.com |
1/26/2023 3:07:25 PM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/17/2023 3:15:12 PM |
Any project coordination must be overseen by Mellisa Lingo (CSU Project Manager). All entities must contact her at (716) 668-8749 or mlingo@csu.org with any inquiries about this project. | 1/17/2023 3:15:12 PM | |
View |
EPC Environmental Services
1/12/2023 1:42:50 PM |
1/12/2023 1:42:50 PM | |
Falcon Fire Protection District
1/12/2023 11:53:11 AM |
Falcon reviewed for information only. This proposed line is not within the District Boundaries, so no other comments are provided. | 1/12/2023 11:53:11 AM |