PCD Engineering Division
3/21/2023 1:31:40 PM |
Review 3: All previous review comments have been resolved. Please submit the drainage report with signatures from the engineer and developer. Subsequent review turnaround time can be shortened. - A driveway access permit for the existing driveways will be required to be obtained prior to approval of a building and construction permit. Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com |
3/21/2023 1:31:40 PM | |
View |
PCD Project Manager
2/24/2023 8:22:03 AM |
drainage report comments | 2/24/2023 8:22:03 AM |
View |
PCD Project Manager
2/24/2023 8:21:44 AM |
civil plans comments | 2/24/2023 8:21:44 AM |
View |
PCD Project Manager
2/24/2023 8:21:24 AM |
SDP comments | 2/24/2023 8:21:24 AM |
PCD Engineering Division
2/23/2023 5:21:28 PM |
Review 2 comments will be uploaded by the project manager. Review comments on the following documents: - Civil Plans - Drainage Report (Submit with signatures next review with revised version) For your information: - EPC Staff is conducting additional research into alternatives for curb chases to protect asphalt from eroding between the curb and curb chase due to concentrated flows. - EPC Staff may require the proposed curb chase to be removed. A final decision will be made in the subsequent review or through an approval condition. - A driveway access permit for the existing driveways will be required to be obtained prior to approval of a building permit. Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com |
2/23/2023 5:21:28 PM | |
EPC Stormwater Review
2/23/2023 12:17:21 PM |
Review 2: All ECP DPW Stormwater comments have been addressed. Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
2/23/2023 12:17:21 PM | |
View |
EPC Health Department
1/13/2023 12:17:52 PM |
1/13/2023 12:17:52 PM | |
View |
El Paso County Conservation Dist
12/11/2022 4:13:15 PM |
Brief comments attached as a .PDF. | 12/11/2022 4:13:15 PM |
View |
PCD Project Manager
12/8/2022 8:17:30 AM |
civic plans | 12/8/2022 8:17:30 AM |
View |
PCD Project Manager
12/8/2022 8:17:11 AM |
landscape plans | 12/8/2022 8:17:11 AM |
View |
PCD Project Manager
12/8/2022 8:16:23 AM |
Drainage report | 12/8/2022 8:16:23 AM |
View |
PCD Project Manager
12/8/2022 8:15:44 AM |
SDP | 12/8/2022 8:15:44 AM |
View |
PCD Project Manager
12/8/2022 8:15:18 AM |
LOI | 12/8/2022 8:15:18 AM |
PCD Engineering Division
12/7/2022 4:02:56 PM |
Review 1 comments will be uploaded by the project manager. Review comments on the following documents: - Letter of Intent - Site Development Plan - Drainage Report (Please submit with signatures and stamp) There is no Driveway Access Permit on file for existing driveways. A Driveway Access Permit is required for all access points onto a county or private road. Please apply for a driveway access permit through EDARP, https://epcdevplanreview.com/ . Under "Getting Started" click on "Initiate a minor application", select Access Permit, and enter a valid email address. A verification code will be sent to the email provided. The verification code will be needed to access the application online. Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com |
12/7/2022 4:02:56 PM | |
View |
EPC Stormwater Review
12/7/2022 3:45:07 PM |
GEC_v1 | 12/7/2022 3:45:07 PM |
EPC Stormwater Review
12/7/2022 3:26:01 PM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - GEC_v1 Note: The proposed area of disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction. Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
12/7/2022 3:26:01 PM | |
View |
PCD Project Manager
12/7/2022 12:59:11 PM |
SDP | 12/7/2022 12:59:11 PM |
View |
PCD Project Manager
12/7/2022 12:58:49 PM |
landscape plans | 12/7/2022 12:58:49 PM |
View |
PCD Project Manager
12/7/2022 12:58:21 PM |
Drainage letter | 12/7/2022 12:58:21 PM |
View |
PCD Project Manager
12/7/2022 12:58:01 PM |
letter of intent | 12/7/2022 12:58:01 PM |
Pikes Peak Regional Building Department
12/6/2022 11:53:31 AM |
Regarding a request for approval of a site development plan, Enumerations has the following comments: 1. Enumerations has assigned the address of 1420 Valley St. for this new building 2. Since this plan shows the new building will house multiple tenants when submitting building plans for review, show secondary addressing for the tenant spaces which follows the secondary addressing guidelines available on the RBD website. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
12/6/2022 11:53:31 AM | |
View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/5/2022 1:27:15 PM |
I am done with my review comments Al | 12/5/2022 1:27:15 PM |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/5/2022 1:26:16 PM |
I am done with my review comments . | 12/5/2022 1:26:16 PM | |
Cherokee Metro Dist
12/5/2022 9:54:58 AM |
Cherokee has no comments based on the drawings available at this time. When new water and wastewater utility plans are available Cherokee will have additional comments. | 12/5/2022 9:54:58 AM |