Project Review Comments

Back to List


Project Name
Arby's
Description
Location
Parcels
6504311004 6504311004
Applicant
CIty of Fountain
Planning Supervisor Kristy Martinez ( Kristy@fountaincolorado.org )
(719) 322-2015
Planning Supervisor Kristy Martinez ( Kristy@fountaincolorado.org )
(719) 322-2015
File Number
OAR2281
Project Manager
Kylie Bagley
Status
Closed
Created
7/21/2022 3:55:04 PM

View: Project Documents



Review Comments (2)

Link Agency Comment
PCD Engineering Division
8/4/2022 4:45:33 PM
PCD-Engineering has no comments.

-- Jeff Rice - 719-520-7877
8/4/2022 4:45:33 PM
PCD Project Manager
8/4/2022 3:37:48 PM
Note that El Paso County does not have land use authority over property within the City; however, it is recommended that the development follow these regulations for this site to ensure that proper measures are taken to ensure compatibility between the proposed use within the City and the existing neighborhood and surrounding properties in the County.

El Paso County LDC ยง6.2.2(D)(2) requires a Buffer Between Non-Residential and Residential Districts Separated by a Non-Arterial Road or Public Alley.
(1) Where Required. A buffer is required along the road-side lot, parcel, or tract line of any non-residential use where the use is separated from a residential zoning district by a non-arterial road or public alley.
(2) Depth and Planting Standards. The required buffer shall be a minimum of 15 feet deep. The minimum number of trees in the buffer shall be 1 tree for every 15 feet of the road frontage. A minimum of ? of the trees shall be evergreen trees.
(3) Opaque Fence or Wall Required. An opaque fence or wall with a minimum height of 6 feet is required along the inside edge of the required buffer when the area immediately adjacent to the 15 foot buffer is used as a service corridor for loading, maneuvering or storage. If the area is used for parking, the required parking lot screening shall be applicable.
(4) Minimum Ground Covering Required. The required buffer area shall require a ground cover at maturity with a minimum of 75% living plant materials. Bark, wood chips, rock, stone, or other natural landscape material shall be used as a non-living ground cover. Areas of a required buffer not covered in approved living ground cover material shall be covered in an approved non-living ground cover.
8/4/2022 3:37:48 PM