Project Name
9580 Bur Oak Ln
Description
admin relief for size of work shop
Location
Parcels
5515403018 5515403018
Applicant
Amber Jackson
Amber Jackson ( Amber.Jackson@graininspection.com )
(701) 261-3698
Amber Jackson ( Amber.Jackson@graininspection.com )
(701) 261-3698
File Number
ADR229
Project Manager
Ashlyn Mathy
Status
Closed
Created
6/27/2022 11:18:55 AM

View: Project Documents



Review Comments (7)

Link Agency Comment
Mountain View Electric Association, Inc.
8/11/2022 10:30:15 AM
Mountain View Electric Association has no objection to the current plan. No permanent structures in the 10 foot rear lot utility easement. Please contact MVEA for the additional load from the new garage. 8/11/2022 10:30:15 AM
View Widefield SD 3
8/2/2022 4:18:29 PM
8/2/2022 4:18:29 PM
Fountain Mutual Irrigation Company
7/19/2022 9:26:33 AM
The Fountain Mutual Irrigation Co. (FMIC) canal existed along the west right-of-way of Marksheffel Road near this Lot 17, Filing No.3 of Cottonwood Meadows and crossed beneath the roadway to the east heading toward Jimmy Camp Creek. However, when the Lorson Ranch development project began its' development project in approximately 2006, they relocated the FMIC pipe crossing of Marksheffel Road farther to the south and abandoned this existing pipe crossing to accommodate their development project.

The existing FMIC canal lies approximately between lots 42 and 43 of Cottonwood Meadows Filing No. 2 and crosses east under Marksheffel Road into the Lorson Ranch development project in an existing 48" diameter pipe. Due to this existing location of the canal beneath Marksheffel Road, FMIC takes no exception to the proposed garage addition for Lot 17 within Cottonwood Meadows Filing No. 3 located at 9580 Bur Oak Lane.
7/19/2022 9:26:33 AM
View El Paso County Conservation Dist
7/19/2022 8:48:16 AM
Native grass seed mix information submitted as .jpg 7/19/2022 8:48:16 AM
View El Paso County Conservation Dist
7/19/2022 8:48:00 AM
Brief comments included within .docx 7/19/2022 8:48:00 AM
View PCD Project Manager
7/15/2022 10:14:13 AM
see comment on site plan map 7/15/2022 10:14:13 AM
PCD Engineering Division
7/13/2022 4:52:10 PM
PCD Engineering has no comments relating to drainage or transportation. Parcel has an existing driveway access permit on file, AP05032. Applicant's proposed garage per site plan drawing is outside of the shared 20-foot County right-of-way and utility easement. However, please note encroachment into County right-of-way will not be allowed so condition of approval should be placed restricting applicant to build outside of County right-of-way easement.

Reviewed by:
Carlos Hernandez
Review Engineer
carloshernandez@elpasoco.com
7/13/2022 4:52:10 PM