Project Review Comments

Back to List


Project Name
WWSD Rolling Hills Booster Pump Station
Description
Facility in Skyline at Lorson Ranch PUD (PUDSP-21-002) See CDR 20-007 access for tract Note- access permit for future road required
Location
Parcels
5500000440 5500000440
Applicant
JDS-Hydro Consultants, Inc.
Gwen Dall ( gdall@jdshydro.com )
(719) 227-0072
Gwen Dall ( gdall@jdshydro.com )
(719) 227-0072
EA Number
EA21141
File Number
PPR2175
Project Manager
Ryan Howser
Status
Closed
Created
7/20/2021 1:30:08 PM

View: Project Documents



Review Comments (28)

Link Agency Comment
PCD Engineering Division
7/5/2022 8:25:40 AM
Engineer Review Ver.4

No further engineer comments.

-Engineer documents pending final approval signature.
-Stormwater documents were corrected and signed. No further comment.
-FAE form was corrected; pending surety document
-Site requires commercial driveway access permit to be submitted.
-Master Developer responsible for all ROW improvements along Grayling Drive (C&G, striping, signage, sidewalk and chases etc. ) per separate CDRs & FAE Refer to PUDSP 21-002 (Skyline at Lorson Ranch); PUDSP203 (Hills at Lorson Ranch); SF221 (Skyline at Lorson Ranch) and SF2110 (Hills at Lorson Ranch Filing No. 1).

Thank you.

Edward Schoenheit, Engineer I
E.P.C. Planning & Community Development
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
7/5/2022 8:25:40 AM
PCD Project Manager
6/29/2022 12:44:58 PM
Planning Division has no comments. 6/29/2022 12:44:58 PM
EPC Stormwater Review
6/25/2022 6:46:03 PM
Review 3: Stormwater review completed by PCD Engineer for this submittal, revise documents per their comments. I have no additional comments.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
GlennReese@elpasoco.com
6/25/2022 6:46:03 PM
PCD Engineering Division
6/23/2022 5:16:34 PM
Engineer & Stormwater Review Ver.3

Please correct the following documents. Please return documents for final signature approval. Note another review period will not be required. These documents will be processed for PCD approval once received.

-FAE. Please provide a simple email stating that the ROW Public improvements, curb, gutter, sidewalk and sidewalk chases will be completed by the developer. The Section 2 ROW line items where not included on the FAE so a continuity document needs to be added to the project folder.

-ESQCP: Please sign document and return.

-GEC Checklist: Signature needed on the submitted GEC Checklist V3 on Page 8. Please sign V3 copy and return.

- Additional surety documents were received by email on 6/23/22 and are under review. Thank you.

Edward Schoenheit, Engineer I
E.P.C. Planning & Community Development
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
6/23/2022 5:16:34 PM
View PCD Project Manager
3/30/2022 5:12:14 PM
PCD Engineering comments - letter of responsibility 3/30/2022 5:12:14 PM
View PCD Project Manager
3/30/2022 5:11:53 PM
PCD Engineering comments - GEC plan 3/30/2022 5:11:53 PM
PCD Engineering Division
3/29/2022 5:21:27 PM
Engineer Review Ver2.

Please see comments on the following documents. Documents will be uploaded by the project manager.

Grading & Erosion Control Plan-Sheet C-14
Surety/Letter of Responsibility

Thank you

Edward B. Schoenheit
Engineer Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
3/29/2022 5:21:27 PM
Pikes Peak Regional Building Department
3/29/2022 9:09:08 AM
No further comment.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
3/29/2022 9:09:08 AM
View EPC Stormwater Review
3/29/2022 7:37:14 AM
SWMP Checklist 3/29/2022 7:37:14 AM
View EPC Stormwater Review
3/29/2022 7:36:56 AM
SWMP 3/29/2022 7:36:56 AM
EPC Stormwater Review
3/29/2022 7:36:17 AM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- SWMP
- SWMP Checklist

EPC Stormwater comments have been resolved on the following documents:
- GEC Plan
- GEC Checklist
- PBMP Applicability Form

Please sign, date, and stamp (as applicable) the following documents and re-submit them:
- GEC Checklist (use the copy that I have uploaded)
- ESQCP
- PBMP Applicability Form
- SWMP Checklist

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
3/29/2022 7:36:17 AM
View EPC Health Department
1/15/2022 5:34:29 PM
1/15/2022 5:34:29 PM
View PCD Project Manager
1/14/2022 8:49:48 AM
PCD Planning and PCD Engineering comments - site development plan 1/14/2022 8:49:48 AM
View PCD Project Manager
1/14/2022 8:49:27 AM
PCD Planning comments - lighting plan 1/14/2022 8:49:27 AM
View PCD Project Manager
1/14/2022 8:49:10 AM
PCD Engineering comments - letter of responsibility 1/14/2022 8:49:10 AM
View PCD Project Manager
1/14/2022 8:48:52 AM
PCD Engineering comments - letter of intent 1/14/2022 8:48:52 AM
View PCD Project Manager
1/14/2022 8:48:07 AM
PCD Planning comments - landscape plan 1/14/2022 8:48:07 AM
View PCD Project Manager
1/14/2022 8:47:51 AM
PCD Engineering and EPC Stormwater comments - grading & erosion control plan 1/14/2022 8:47:51 AM
View PCD Project Manager
1/14/2022 8:47:30 AM
PCD Engineering comments - financial assurance forms 1/14/2022 8:47:30 AM
View PCD Project Manager
1/14/2022 8:47:04 AM
PCD Engineering and EPC Stormwater comments - drainage report 1/14/2022 8:47:04 AM
PCD Engineering Division
1/13/2022 5:21:51 PM
Review 1 comments will be uploaded by the project manager. Please address comments on the following documents:

-Site Development plan
-Drainage report
-GEC plan
-FAE
-Letter of responsibility
-Letter of intent

Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com

Edward B. Schoenheit
Engineer I Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
1/13/2022 5:21:51 PM
View EPC Stormwater Review
1/12/2022 5:51:06 PM
PBMP Applicability Form 1/12/2022 5:51:06 PM
View EPC Stormwater Review
1/12/2022 5:50:52 PM
GEC Checklist 1/12/2022 5:50:52 PM
EPC Stormwater Review
1/12/2022 5:50:28 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist (sign and date form once revisions are completed and resubmit)
- PBMP Applicability Form (sign, stamp, and date upon resubmittal)

This site requires an ESQCP as it qualifies as part of a larger common plan of development. Is this project going to be under Lorson Ranch's ESQCP for the surrounding development? If so, please upload a copy of that existing ESQCP to this project. If not, please complete and submit an ESQCP application and the subsequent docs (a SWMP would be the only thing currently missing).

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
1/12/2022 5:50:28 PM
View Widefield SD 3
1/4/2022 4:06:23 PM
1/4/2022 4:06:23 PM
Pikes Peak Regional Building Department
1/4/2022 7:58:33 AM
1. Current address for electrical service to Booster Pump Station connection is 11350 Fontaine Blvd. It is not clear where the pump house is located so that an address can be assigned. Please clarify.
2. Address 11350 Fontaine Blvd will have an official address change to 11208 Grayling Drive. This address change will occur next week.



Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
1/4/2022 7:58:33 AM
View El Paso County Conservation Dist
12/15/2021 12:43:33 PM
12/15/2021 12:43:33 PM
View El Paso County Conservation Dist
12/15/2021 12:42:47 PM
12/15/2021 12:42:47 PM