Project Review Comments

Back to List


Project Name
Falcon Meadows at Bent Grass Fil 1-4 Channel Design
Description
Channel Design
Location
Parcels
5301204006 5301204006
Applicant
Galloway & Company, Inc.
Erin Ganaway ( EGanaway@ChallengerHomes.com ) Erin Ganaway ( EGanaway@ChallengerHomes.com )
EA Number
EA2130
File Number
CDR2114
Project Manager
Kari Parsons
Status
Closed
Created
7/13/2021 6:12:15 PM

View: Project Documents



Review Comments (71)

Link Agency Comment
EPC Stormwater Review
1/11/2023 11:03:56 AM
EPC DPW Stormwater has no further comments. Thanks. 1/11/2023 11:03:56 AM
Woodmen Road Metro
1/5/2023 10:15:11 AM
This proposed project is located within the Woodmen Road Metropolitan District boundaries. The District assess’ platting and building permit fees for new development within the District Boundaries.

The fees for this year are as follows:
Platting Fees:
Commercial- $1540/ACRE
Residential- $385.00/LOT

Building Permit Fees:
Commercial-
Destination retail/hotel- $1.37/SQUARE FOOT
Convenience Commercial- $5.51/SQUARE FOOT
All Other Uses- $1.10/SQUARE FOOT
Residential-
Single Family- $550/UNIT
Multi Family- $385/UNIT
1/5/2023 10:15:11 AM
PCD Engineering Division
1/5/2023 10:13:32 AM
PCD-Engineering has the following comments:

The revised CDs have been forwarded to the ECM Administrator for approval and will be uploaded to EDARP when available.

The channel maintenance agreement will be reviewed by the County Attorney. Please provide a Word document or pdf showing the changes from the last version that was emailed to you.


-- Jeff Rice - 719-520-7877
1/5/2023 10:13:32 AM
Colorado Springs Public Works
1/3/2023 2:20:34 PM
Traffic Engineering has no comments on this item.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
1/3/2023 2:20:34 PM
Colorado Springs Public Works
12/29/2022 11:44:58 AM
Engineering Development Review has no comment on this item.

Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
12/29/2022 11:44:58 AM
Mountain View Electric Association, Inc.
12/28/2022 11:11:00 AM
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. 12/28/2022 11:11:00 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/28/2022 8:38:48 AM
Utilities Development Services has no comments on this application. CS Utilities has some existing infrastructure at and around this parcel that, if damaged during development, will be replaced or maintained at the customer's expense. call 719-668-4985.
Corey Masoumi - cmasoumi@csu.org
12/28/2022 8:38:48 AM
PCD Engineering Division
10/3/2022 11:59:48 AM
PCD-Engineering has the following comments:

The engineering documents have been approved/accepted and will be uploaded to EDARP.

A draft channel maintenance agreement will be provided via email when available; provide a Word document and pdf containing any revisions or signatures (if no revisions).


-- Jeff Rice - 719-520-7877
10/3/2022 11:59:48 AM
EPC Stormwater Review
9/27/2022 8:04:54 AM
EPC Stormwater has no further comments. Thanks. 9/27/2022 8:04:54 AM
View PCD Engineering Division
9/19/2022 5:55:48 PM
(SWMP redlined pages) 9/19/2022 5:55:48 PM
View PCD Engineering Division
9/19/2022 5:55:07 PM
(GEC redlined sheet) 9/19/2022 5:55:07 PM
View PCD Engineering Division
9/19/2022 5:54:23 PM
(Drainage fees and credits) 9/19/2022 5:54:23 PM
View PCD Engineering Division
9/19/2022 5:53:34 PM
See comment memo (link at left).

Items needed for resubmittal:
- Channel design report (basin fee calculations)
- Basin Fee Calculations
- GEC Plan ("final" sheet)
- SWMP (floodplain map and RCD detail)

Signed and stamped documents will be required with the final submittal. Provide all remaining items highlighted in blue on the Engineering Final Submittal Checklist (coordinate with the PM for EDARP slots). Additional items include the easement exhibits.

A draft channel maintenance agreement will be provided when available.

-- Jeff Rice - 719-520-7877
9/19/2022 5:53:34 PM
EPC Stormwater Review
8/8/2022 12:56:30 PM
Review 4: EPC Stormwater comments have been resolved on the following documents:
- FAE

EPC Stormwater has no further comments at this time. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
8/8/2022 12:56:30 PM
View PCD Engineering Division
7/27/2022 7:16:14 PM
(Cursory revisions to DB Fee/Credits Spreadsheet) Discuss with Staff 7/27/2022 7:16:14 PM
View PCD Engineering Division
7/27/2022 7:15:13 PM
(FAE redlines) 7/27/2022 7:15:13 PM
View PCD Engineering Division
7/27/2022 7:14:34 PM
(CD redlines summary) 7/27/2022 7:14:34 PM
View PCD Engineering Division
7/27/2022 7:12:39 PM
(CD redlines) 7/27/2022 7:12:39 PM
View PCD Engineering Division
7/27/2022 7:10:56 PM
(FDR redlines summary) 7/27/2022 7:10:56 PM
View PCD Engineering Division
7/27/2022 7:10:24 PM
(FDR redlines) 7/27/2022 7:10:24 PM
View PCD Engineering Division
7/27/2022 6:55:10 PM
See comment memo (link at left).

Items needed for resubmittal:
- Channel design report
- Channel CDs (onsite and offsite)
- FAEs (number depending on phasing)
- Comment responses

Signed and stamped documents will be required with the final submittal. Provide all items highlighted in blue on the Engineering Final Submittal Checklist (coordinate with the PM for EDARP slots). Additional items include the wetlands report and easements.


-- Jeff Rice - 719-520-7877
7/27/2022 6:55:10 PM
View PCD Engineering Division
5/2/2022 9:58:13 AM
(Standard signature blocks for reference) 5/2/2022 9:58:13 AM
View PCD Engineering Division
5/2/2022 9:57:29 AM
(Pages from DBPS) Include in the design report. 5/2/2022 9:57:29 AM
View PCD Engineering Division
5/2/2022 9:54:49 AM
(Cursory revisions to DB Fee/Credits Spreadsheet) Discuss with Staff 5/2/2022 9:54:49 AM
View PCD Engineering Division
5/2/2022 9:52:07 AM
(SWMP redlines) 5/2/2022 9:52:07 AM
View PCD Engineering Division
5/2/2022 9:51:33 AM
(FAE redlines - cursory) 5/2/2022 9:51:33 AM
View PCD Engineering Division
5/2/2022 9:50:45 AM
(GEC redlines summary) 5/2/2022 9:50:45 AM
View PCD Engineering Division
5/2/2022 9:50:12 AM
(GEC redlines) 5/2/2022 9:50:12 AM
View PCD Engineering Division
5/2/2022 9:49:03 AM
(CD redlines summary) 5/2/2022 9:49:03 AM
View PCD Engineering Division
5/2/2022 9:48:28 AM
(CD redlines) 5/2/2022 9:48:28 AM
View PCD Engineering Division
5/2/2022 9:47:02 AM
(LOI redlines) 5/2/2022 9:47:02 AM
View PCD Engineering Division
5/2/2022 9:46:22 AM
(Design report redlines summary) 5/2/2022 9:46:22 AM
View PCD Engineering Division
5/2/2022 9:43:30 AM
(Drainage report redlines) 5/2/2022 9:43:30 AM
View PCD Engineering Division
5/2/2022 9:40:51 AM
See comment memo (link at left).

Items needed for submittal/resubmittal:
- LOI
- Channel design report
- Channel CDs (onsite and offsite)
- GEC Plan (onsite and offsite)
- FAEs (number depending on phasing)
- SWMP
- Other Stormwater-requested items including signed checklists
- Comment responses

Signed and stamped documents will be required with the final submittal. Provide all items highlighted in blue on the Engineering Final Submittal Checklist


-- Jeff Rice - 719-520-7877
5/2/2022 9:40:51 AM
View EPC Stormwater Review
4/18/2022 11:00:30 AM
FAE 4/18/2022 11:00:30 AM
EPC Stormwater Review
4/18/2022 10:59:20 AM
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- FAE

EPC Stormwater comments have been resolved on the following documents:
- GEC Plan
- GEC Checklist

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
4/18/2022 10:59:20 AM
Woodmen Hills Metro
2/17/2022 1:27:02 PM
Please be aware of WHMD water/sewer lines at Bent Grass Meadows Dr and adjacent to Woodmen Frontage Road 2/17/2022 1:27:02 PM
View Colorado Department of Transportation - Pueblo Office
2/16/2022 11:51:48 AM
2/16/2022 11:51:48 AM
PCD Project Manager
2/14/2022 9:05:17 AM
Please make sure to submit the drainage reimbursement application. 2/14/2022 9:05:17 AM
View PCD Engineering Division
2/13/2022 5:47:30 PM
(DBPS Developer costs sheet) 2/13/2022 5:47:30 PM
View PCD Engineering Division
2/13/2022 5:46:48 PM
(DBPS District costs sheet) 2/13/2022 5:46:48 PM
View PCD Engineering Division
2/13/2022 5:46:05 PM
(DBPS Figure 6-1 - complete) 2/13/2022 5:46:05 PM
View PCD Engineering Division
2/13/2022 5:45:00 PM
(SWMP redlines) 2/13/2022 5:45:00 PM
View PCD Engineering Division
2/13/2022 5:44:12 PM
(GEC redlines summary) 2/13/2022 5:44:12 PM
View PCD Engineering Division
2/13/2022 5:43:35 PM
(GEC redlines) 2/13/2022 5:43:35 PM
View PCD Engineering Division
2/13/2022 5:42:22 PM
(CD redlines summary) 2/13/2022 5:42:22 PM
View PCD Engineering Division
2/13/2022 5:41:48 PM
(CD redlines) 2/13/2022 5:41:48 PM
View PCD Engineering Division
2/13/2022 5:40:34 PM
(Design report redlines summary) 2/13/2022 5:40:34 PM
View PCD Engineering Division
2/13/2022 5:39:59 PM
(Design report redlines) 2/13/2022 5:39:59 PM
View PCD Engineering Division
2/13/2022 5:36:33 PM
(LOI redlines) 2/13/2022 5:36:33 PM
View PCD Engineering Division
2/13/2022 5:35:59 PM
See comment memo (link at left).

Items needed for submittal/resubmittal:
- LOI
- Channel design report
- Channel CDs (onsite and offsite)
- GEC Plan (onsite and offsite)
- FAEs (number depending on phasing)
- SWMP
- Other Stormwater-requested items
- Comment responses


-- Jeff Rice - 719-520-7877
2/13/2022 5:35:59 PM
View EPC Stormwater Review
2/9/2022 11:07:26 AM
GEC Checklist 2/9/2022 11:07:26 AM
EPC Stormwater Review
2/9/2022 11:07:07 AM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- FAE........................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist

EPC Stormwater comments have been resolved on the following documents:
- Drainage Report
- CD
- ESQCP
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
2/9/2022 11:07:07 AM
Mountain View Electric Association, Inc.
2/7/2022 12:04:23 PM
Mountain View Electric Association has no comment on the current plan. 2/7/2022 12:04:23 PM
Woodmen Road Metro
1/20/2022 2:45:41 PM
This proposed project is located within the Metropolitan District boundaries. The District assess’ platting and building permit fees for new development within the District Boundaries, the District also assess’ a mill levy on property within the District Boundaries.

This proposed project will not be impacted by the plating or building permit fees.
1/20/2022 2:45:41 PM
Bent Grass Metro
1/20/2022 2:44:46 PM
This proposed project is located within the Metropolitan District boundaries. The District assess’ platting and building permit fees for new development within the District Boundaries, the District also assess’ a mill levy on property within the District Boundaries.

This proposed project will not be impacted by the plating or building permit fees.
1/20/2022 2:44:46 PM
View PCD Engineering Division
10/31/2021 6:34:31 PM
(LOI redlines) 10/31/2021 6:34:31 PM
View PCD Engineering Division
10/31/2021 6:34:05 PM
(CDs redlines) 10/31/2021 6:34:05 PM
View PCD Engineering Division
10/31/2021 6:33:44 PM
(GEC redlines) 10/31/2021 6:33:44 PM
View PCD Engineering Division
10/31/2021 6:33:18 PM
(SWMP redlines) 10/31/2021 6:33:18 PM
View PCD Engineering Division
10/31/2021 6:32:49 PM
(FAE redlines) 10/31/2021 6:32:49 PM
View PCD Engineering Division
10/31/2021 6:32:28 PM
(ESQCP redlines) 10/31/2021 6:32:28 PM
View PCD Engineering Division
10/31/2021 6:31:59 PM
See comment memo (link at left).

Items needed before recording Falcon Meadows at Bent Grass Filing No. 1 (SF-21-020) plat:
- Approved FAE for channel improvements within the plat area
- Maintenance Agreements with each property owner and the district
- Construction easements on the downstream properties, as applicable

Items needed for submittal/resubmittal in this CDR file:
- LOI
- Channel design report
- Channel CDs (onsite and offsite)
- GEC Plan (onsite and offsite)
- FAE (2 or 3 depending on phasing)
- Stormwater-requested items


-- Jeff Rice - 719-520-7877
10/31/2021 6:31:59 PM
Mountain View Electric Association, Inc.
10/18/2021 8:22:32 AM
Mountain View Electric Association has no comment at this time 10/18/2021 8:22:32 AM
View EPC Stormwater Review
10/14/2021 3:10:46 PM
PBMP-Applicability-Form 10/14/2021 3:10:46 PM
View EPC Stormwater Review
10/14/2021 3:10:32 PM
SWMP-Checklist 10/14/2021 3:10:32 PM
View EPC Stormwater Review
10/14/2021 3:09:50 PM
Storm Water Management Plan (SWMP)_V1 10/14/2021 3:09:50 PM
View EPC Stormwater Review
10/14/2021 3:08:21 PM
GEC-Checklist 10/14/2021 3:08:21 PM
EPC Stormwater Review
10/14/2021 3:11:18 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CD..........................(to be uploaded by PM with PCD comments)
- ESQCP...................(to be uploaded by PM with PCD comments)
- FAE........................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- SWMP
- SWMP Checklist

Please provide the following document on resubmittal. Note that I have uploaded a mostly completed form. Just review, revise, sign, and resubmit it.
- PBMP Applicability Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
10/14/2021 3:11:18 PM
Woodmen Road Metro
10/7/2021 8:36:19 AM
This proposed project does not qualify to be charged for the fees associated with Woodmen Road Metropolitan District, however, this project is included within the District Boundaries. 10/7/2021 8:36:19 AM
Bent Grass Metro
10/7/2021 8:35:53 AM
This proposed project does not qualify to be charged for the fees associated with Bent Grass Metropolitan District, however, this project is included within the District Boundaries. 10/7/2021 8:35:53 AM