PCD Engineering Division
9/7/2022 9:09:10 AM |
There are no further comments. The project manager will upload any approved documents. Reviewed By: Lupe Packman Review Engineer lupepackman@elpasoco.com |
9/7/2022 9:09:10 AM | |
PCD Engineering Division
8/8/2022 9:09:42 AM |
All comments have been addressed. Submit the following documents stamped with PE stamps per DORA bylaws. -CDs -Drainage report -FAE Note to planner: set review time to 5 days. Reviewed By: Lupe Packman Review Engineer lupepackman@elpasoco.com |
8/8/2022 9:09:42 AM | |
EPC Stormwater Review
8/5/2022 4:40:25 PM |
Review 2: All Stormwater comments have been addressed. Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
8/5/2022 4:40:25 PM | |
Upper Black Squirrel Creek GWMD
8/2/2022 7:51:29 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. | 8/2/2022 7:51:29 PM | |
View |
EPC Stormwater Review
6/10/2022 1:32:45 PM |
GEC Checklist_v1 | 6/10/2022 1:32:45 PM |
View |
EPC Stormwater Review
6/10/2022 1:32:22 PM |
FAE_v1 | 6/10/2022 1:32:22 PM |
View |
EPC Stormwater Review
6/10/2022 1:31:49 PM |
CDs_v1 | 6/10/2022 1:31:49 PM |
EPC Stormwater Review
6/10/2022 1:30:38 PM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CDs........................(uploaded with PCD comments) - FAE.......................(uploaded with PCD comments) - GEC Checklist Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
6/10/2022 1:30:38 PM | |
View |
PCD Engineering Division
6/9/2022 5:08:49 PM |
EPC Stormwater will upload comments. Please address comments on the following documents: -Drainage memo -FAE -Construction drawings Reviewed By: Lupe Packman Review Engineer lupepackman@elpasoco.com |
6/9/2022 5:08:49 PM |