View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
5/12/2021 2:28:10 PM |
Planning comments addressed. | 5/12/2021 2:28:10 PM | |
PCD Engineering Division
5/12/2021 2:16:51 PM |
All engineering comments have been addressed. Approved documents will be uploaded by the project manager. Reviewed by: Lupe Packman Review Engineer lupepackman@elpasoco.com |
5/12/2021 2:16:51 PM | |
View |
PCD Project Manager
4/13/2021 11:06:29 AM |
Please see attached comments to site plan drawing. | 4/13/2021 11:06:29 AM |
PCD Engineering Division
4/12/2021 11:22:57 AM |
Comments provided by E. Nijkamp, 719-237-7206 1. To be sure of the extents of the fence, please provide a legend for the fence linework. It would also help if this linework was larger or darker for visibility on the plan. 2. A drainage memo will be required to confirm that the fence will not impede the flow of water in the area where the fence crosses/is within a drainage easement. 3. In order to fully evaluate the request, the sight distance lines (per ECM chapter 2) should be shown on this plan to assure that the sight visibility is not hampered by the proposed fence and enclosure locations. A deviation from the ECM for the sight visibility is not acceptable. 5. Please provide the ground location on the details to confirm the actual height of the fence that will be above ground. |
4/12/2021 11:22:57 AM | |
View |
PCD Project Manager
3/30/2021 12:29:47 PM |
Please see attached comments to site plan. | 3/30/2021 12:29:47 PM |