Project Review Comments

Back to List


Project Name
Lot 2, Wolf Business Park Filing No. 2
Description
Request for approval of 12,500 SF building for office and warehouse use.
Location
Parcels
7111306007 7111306007
Applicant
Town of Monument
Planning Director Larry Manning ( lmanning@tomgov.org )
(719) 884-8019
Planning Director Larry Manning ( lmanning@tomgov.org )
(719) 884-8019
File Number
OAR216
Project Manager
Sophie Kiepe
Status
Closed
Created
1/25/2021 9:37:48 AM

View: Project Documents



Review Comments (2)

Link Agency Comment
PCD Engineering Division
2/18/2021 5:52:42 PM
Review 1.
- Drainage: Page 3 of the drainage report noted "Future development of Basin A1 is anticipated to include private storm sewer laterals extending easterly to collect surface drainage from the developed sites." The current site plan does not appear to be in conformance with the Wolf Business Park Filing 2 drainage report. Staff recommends the applicant submits a site specific drainage letter confirming if the current design is in conformance with the Filing 2 FDR.

- Transportation:
1. The Traffic study anticipates a northbound right-turn (NBRT) deceleration lane on Beacon Lite Road at Wolf Court drive (pg. 17) at buildout. Potential issue in the future is that the Lot that triggers the NBRT warrant may need to acquire additional ROW from Lots 5 & 7, and fund/construct the turn lane. Staff recommends Wolf Business Park and Town of Monument consider having each lot provide a fair share escrow for this improvement, potentially submitting an updated TIS which includes a cost estimate for the needed improvement, identifying the additional ROW required, and identify the fair share contribution for each lot in an updated traffic study or memo.
2. Provide a traffic memo to verify if the NBRT is warranted with this application. The memo to update Table 13 to reflect approved site plan/land uses that are approved/constructed.
Note: Future site plan applications should submit a traffic memo to verify if the NBRT offsite improvement is warranted with their proposed site development plan application.


Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
2/18/2021 5:52:42 PM
PCD Project Manager
2/18/2021 4:29:19 PM
No Planning comments at this time. EPC Comments will be provided directly to the Town of Monument Planner via email pending completion of Engineering review. 2/18/2021 4:29:19 PM