View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
PCD Engineering Division
9/22/2020 2:26:39 PM |
Attached review 1 redline: Grading and Erosion Control Plan. | 9/22/2020 2:26:39 PM |
View |
PCD Engineering Division
9/22/2020 2:16:49 PM |
Attached review 1 redline: Financial Assurance Estimate Form | 9/22/2020 2:16:49 PM |
View |
PCD Engineering Division
9/22/2020 2:16:12 PM |
Attached review 1 redline: ESQCP | 9/22/2020 2:16:12 PM |
View |
PCD Engineering Division
9/22/2020 2:18:10 PM |
Review 1 comments: - Replace the drainage letter with the approved preliminary drainage report. - Remove the following documents from the standalone early grading application. These will be reviewed/approved with the Filing 1 application (SF1922): Construction Drawings, MS4 Form, SDI Worksheet - Upload a completed Pre-development Site Grading Acknowledgement and Right of Access Form (attached) - Redline comments on the following documents are uploaded in separate comments. * ESQCP * Financial Assurance Estimate * Grading and Erosion Control Plan Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com |
9/22/2020 2:18:10 PM |
View |
EPC Stormwater Review
9/21/2020 12:07:57 PM |
SWMP Checklist | 9/21/2020 12:07:57 PM |
View |
EPC Stormwater Review
9/21/2020 12:07:34 PM |
SWMP | 9/21/2020 12:07:34 PM |
View |
EPC Stormwater Review
9/21/2020 12:07:08 PM |
GEC Checklist | 9/21/2020 12:07:08 PM |
EPC Stormwater Review
9/22/2020 7:27:22 AM |
Review 1: EPC Stormwater comments have been provided on the following uploaded documents: - ESQCP...............(to be uploaded by PCD review engineer. Our comments will be in the same file, with my comments in orange text boxes with black text) - GEC Checklist - GEC Plan...........(to be uploaded by PCD review engineer. Our comments will be in the same file, with my comments in orange text boxes with black text) - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer I glennreese@elpasoco.com |
9/22/2020 7:27:22 AM |