Project Name
Yoder Substation New Control Building
Description
Control Building
Location
Parcels
1400000527 1400000527
Applicant
Loewen Construction Inc
John Marquardt ( lcijohn63@gmail.com )
(719) 550-9287
John Marquardt ( lcijohn63@gmail.com )
(719) 550-9287
File Number
COM204
Project Manager
Petra Rangel
Status
Closed
Created
1/10/2020 10:19:42 AM

View: Project Documents



Review Comments (2)

Link Agency Comment
PCD Engineering Division
1/23/2020 1:12:26 PM
Review 2.
Disregard previous comment. The overall project site is covered under an active ESQCP and Grading and Erosion Control Plan under PCD Project No. PPR1827. No additional requirements.

Reviewed by:
Gilbert LaForce
gilbertlaforce@elpasoco.com
1/23/2020 1:12:26 PM
View PCD Engineering Division
1/19/2020 1:11:04 PM
The proposed project is disturbing over 1 acres of land and is determined to be an applicable construction activity (attached).
The following documents:
Erosion Stormwater Quality Control Permit (ESQCP)
Stormwater Management Plan (SWMP)
Grading and Erosion Control Plan
Drainage Report
Pond Maintenance Agreement for the proposed sediment basins
Pond Operations and Maintenance Manual for the proposed sediment basins
PBMP Applicability Form
Financial Assurance Estimate
1/19/2020 1:11:04 PM