Project Review Comments

Back to List


Project Name
Widefield Water and Sanitation Carport
Description
site plan for a new carport
Location
Parcels
6525000004 6525000004
Applicant
JDS-Hydro Consultants, Inc.
Gina Mangino ( gmangino@jdshydro.com )
(719) 227-0072 x107
Gina Mangino ( gmangino@jdshydro.com )
(719) 227-0072 x107
File Number
COM1926
Project Manager
Nina Ruiz
Status
Closed
Created
5/1/2019 7:08:11 AM

View: Project Documents



Review Comments (4)

Link Agency Comment
PCD Project Manager
8/12/2019 10:16:02 AM
The applicant has not placed the ADA route on the site plan. Per Section 6.1.3 of the LDC this must be complete prior to approval. 8/12/2019 10:16:02 AM
PCD Engineering Division
8/8/2019 2:39:20 PM
Engineering has no additional comments 8/8/2019 2:39:20 PM
PCD Project Manager
7/11/2019 5:47:53 AM
1. Please clearly define the EPC/Fountain boundary and that this request is only for the carport in EPC and not in Fountain.
2. Please add our ADA note and an ADA route to the site plan.

NOTE: additional review items may be required based upon EPC Engineering Division Review.
7/11/2019 5:47:53 AM
PCD Engineering Division
7/10/2019 7:30:55 AM
Identify on the site plan which structures/impervious areas were built prior to February 2008 and which were built after February 2008. This identification is for water quality accounting. The cumulative land disturbance/impervious acreage post-February 2008 must be accounted for water quality capture volume treatment.

Note: Once the cumulative land disturbance/impervious acreage post-February 2008 is equal to or exceeds 1 acre, then water quality capture volume treatment shall be required.

Thank you,

Beck Grimm
7/10/2019 7:30:55 AM