Winding Walk PUDSP
Description
PUDSP for 405 of residential lots.
Location
Stapleton Drive & Eastonville Road
Parcels
4200000413 4200000413 4200000415 4200000415
Applicant
N.E.S.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
EA Number
EA-17-147
File Number
PUDSP182
Project Manager
Nina Ruiz
Status
Closed
Created
11/8/2017 4:34:42 PM

View: Project Documents



Review Comments (32)

Link Agency Comment
PCD Engineering Division
6/4/2018 5:01:13 PM
Review 3
Engineering comments on the following documents are resolved:
- PUD Development Plan
- TIS (FYI: For the TIS associated with subsequent filings anticipate updating the signal cost to $400k when calculating the escrow amount)
- Drainage Report
6/4/2018 5:01:13 PM
Colorado Geological Survey
5/29/2018 10:33:07 AM
The previous comments submitted by CGS have not been addressed. Since the county is addressing the foundation and design of roads and storm drainage facilities, my comments regarding these public improvements can be considered as addressed. 5/29/2018 10:33:07 AM
View Colorado Geological Survey
5/14/2018 3:27:56 PM
5/14/2018 3:27:56 PM
View PCD Engineering Division
5/7/2018 9:29:40 AM
Review 2 redline comments to the traffic study is attached.
FYI: This is a partial review. Comments from the County Engineer is pending.
5/7/2018 9:29:40 AM
View PCD Engineering Division
5/7/2018 9:26:59 AM
Review 2 redline comments to the Drainage Report is attached. 5/7/2018 9:26:59 AM
PCD Project Manager
5/3/2018 4:49:43 PM
Engineering will upload the red lines for the drainage and traffic and provide comments early next week. Gilbert is discussing the traffic concerns with Jennifer and Elizabeth. Please note that the CGS review has not been completed as required by the Code. Additional comments may occur post their review. 5/3/2018 4:49:43 PM
View PCD Project Manager
5/3/2018 4:46:21 PM
PUDSP review 2 red lines
Some of the comments remain from the first review.
5/3/2018 4:46:21 PM
View PCD Project Manager
5/3/2018 4:44:03 PM
Letter of intent red lines review 2. 5/3/2018 4:44:03 PM
PCD Engineering Division
5/7/2018 7:24:29 AM
Review 2 redline comments on the following documents will be uploaded by the Project Manager:
- PUD Development Plan
5/7/2018 7:24:29 AM
El Paso County Conservation Dist
3/30/2018 8:21:09 AM
The El Paso County Conservation District board of directors have no comments at this time 3/30/2018 8:21:09 AM
View EPC County Attorney's Office
3/19/2018 11:56:50 AM
3/19/2018 11:56:50 AM
View Colorado Division of Water Resources
3/14/2018 4:03:03 PM
3/14/2018 4:03:03 PM
View PCD Project Manager
3/1/2018 12:38:14 PM
LOI Redlines 3/1/2018 12:38:14 PM
View PCD Project Manager
3/1/2018 12:37:56 PM
PUDSP Redlines 3/1/2018 12:37:56 PM
View PCD Project Manager
3/1/2018 12:37:24 PM
Drainage Redlines 3/1/2018 12:37:24 PM
View PCD Project Manager
3/1/2018 12:37:05 PM
Soils & Geo Redlines 3/1/2018 12:37:05 PM
View PCD Project Manager
3/1/2018 12:36:45 PM
Traffic Redlines 3/1/2018 12:36:45 PM
PCD Engineering Division
2/26/2018 4:08:51 PM
Review 1 redline comments on the following documents will be uploaded by the Project Manager:
- LOI
- PUD Development Plan
- TIS
- Soils & Geotech Report
- Drainage Report

The Rough Grading GEC and SWMP were not review with this application since it's being processed under EGP-17-001.
2/26/2018 4:08:51 PM
View PCD Engineering Division
2/26/2018 4:09:59 PM
Review 1: Submit an associated deviation request for the midblock PUD Modification. Attached is the deviation request form. 2/26/2018 4:09:59 PM
View EPC Parks Department
2/20/2018 10:44:06 AM
El Paso County Community Services/Parks Final Comments (PAB Endorsed 02/14/2018) 2/20/2018 10:44:06 AM
PCD Project Manager
2/15/2018 2:11:56 PM
Mineral Certification
1.Mineral Certification The mineral certification does not include if the rights were/were not severed.

Application
1.The application should not include final plat. That is a separate application from this one.

Fire Protection Report
1.The report does not include anticipated response times as required per 6.3.3.B.1 of the LDC.

Informational
1. The PUDSP cannot be approved unless the revised sketch plan is approved.
2. Please ensure that the proposed product will fit on each lot.
3. Should the request be approved, final plat(s) will be required to create the proposed lots and tracts. The final plat(s) must be approved and recorded prior to construction of any structure.
4. The detention pond maintenance agreement must be recorded and referenced on the final plat(s).
5. Prior to scheduling the item for hearing, all engineering documents must be signed by the County Engineer.
6. The HOA documents must be recorded prior to the final plat(s) and referenced on the face of the plat.
7. A SIA will be required with the final plat for the public improvements.
8. Any soils mitigation measures required (ex: underdrains) should be identified as a note on the final plat.

General
1. Please add PUDSP-18-002 to all associated documents.
2. Redlines will be uploaded following the completion of the engineering division review.
2/15/2018 2:11:56 PM
View Colorado Geological Survey
2/14/2018 1:39:15 PM
2/14/2018 1:39:15 PM
View Colorado Parks and Wildlife
2/14/2018 11:20:50 AM
2/14/2018 11:20:50 AM
Pikes Peak Regional Building Department
2/12/2018 11:47:03 AM
Please provide a larger scale copy of all lots on 1 sheet of paper for addressing purposes. Addressing the area will start once receive.

DEVELOPMENT PLAN STAGE:

FOR TRACT AND LOT ADDRESSING PLACE (XXXX) WHERE THEY INTEND TO BE UTILIZED.

CONTACT ENUMERATIONS DEPARTMENT FOR ADDRESSING. AMY@PPRBD.ORG OR BRENT@PPRBD.ORG

FINAL PLAT STAGE:

ENUMERATIONS/FLOODPLAIN WILL REVIEW THE MYLAR PRIOR TO PLAT FOR ADDRESS PLACEMENT, ROAD NAMING, TITLE BLOCK, & FLOODPLAIN STATEMENT.

$10.00 PER LOT & TRACT FEE WILL BE DUE AT THE TIME OF THE REVIEW OF THE MYLAR. IF AN ADDRESS IN NOT NEEDED ON A TRACT THEN NO FEE APPLIES. CHECK SHOULD BE MADE OUT TO PIKES PEAK REGIONAL BUILDING DEPARTMENT. PAID DIRECTLY TO ENUMERATIONS DEPARTMENT.

A COPY OF THE FINAL RECORDED PLAT IS REQUIRED PRIOR TO PLAN SUBMITTAL FOR RESIDENTAL.
2/12/2018 11:47:03 AM
View 911 Authority - El Paso/Teller County
2/9/2018 10:32:59 AM
Please see attached document for comments
Thank you
Justin
2/9/2018 10:32:59 AM
View EPC Health Department
2/7/2018 5:28:04 PM
2/7/2018 5:28:04 PM
View EPC Parks Department
2/6/2018 2:46:24 PM
El Paso County Community Services/Parks Preliminary Comments 2/6/2018 2:46:24 PM
View Mountain View Electric Association, Inc.
2/5/2018 4:17:03 PM
2/5/2018 4:17:03 PM
Falcon Fire Protection District
2/5/2018 3:37:38 PM
Falcon Fire PD has reviewed this PUD/Preliminary Plan request by GTL Development, Inc. known as the Winding Walk Subdivision and consisting of 405 residential lots on 161.88 acres and has no objections to this request. Final comments will be provided at time of Final Plat. 2/5/2018 3:37:38 PM
View EPC Environmental Services
1/29/2018 3:24:28 PM
1/29/2018 3:24:28 PM
Woodmen Road Metro
1/29/2018 9:43:57 AM
In response to the proposed project this parcel will be subject to the Woodmen Road Metropolitan District fee’s and mill levy’s . 1/29/2018 9:43:57 AM
View Colorado State Forest Service
1/24/2018 8:33:38 AM
1/24/2018 8:33:38 AM