View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
PCD Engineering Division
8/17/2017 1:32:34 PM |
As depicted in sheets EC1 and EC2 it appears that offsite grading occurs. To avoid confusion, show and label the boundary for tract F and not it is also owned by Meridian Service Metro District. | 8/17/2017 1:32:34 PM |
View |
PCD Engineering Division
8/17/2017 1:29:45 PM |
The culvert will be privately maintained. Therefore, move the cost for the 18" CMP from Section 2 to Section 3. Provide the engineer and owner's signatures with the resubmittal for final approval. |
8/17/2017 1:29:45 PM |
Pikes Peak Regional Building Department
8/7/2017 10:22:16 AM |
Enumerations has no further comments. | 8/7/2017 10:22:16 AM | |
View |
EPC Health Department
8/4/2017 5:44:27 PM |
8/4/2017 5:44:27 PM | |
PCD Project Manager
8/1/2017 4:28:35 PM |
The proposed development spans two separate parcels. The two parcels can be combined through an administrative vacation of interior lot line. | 8/1/2017 4:28:35 PM | |
PCD Engineering Division
7/27/2017 12:26:03 PM |
Submit an Autoturn exhibit for the right out access onto Stapleton Rd to verify the driveway geometry for the larger vehicle. | 7/27/2017 12:26:03 PM | |
View |
Mountain View Electric Association, Inc.
7/25/2017 3:23:06 PM |
Attached are the comments from Mountain View Electric from June 21, 2017. Thank you. |
7/25/2017 3:23:06 PM |
View |
PCD Engineering Division
7/25/2017 4:38:33 PM |
Attached are the redline comments to the Drainage Letter. | 7/25/2017 4:38:33 PM |
View |
PCD Engineering Division
7/24/2017 11:19:27 AM |
Attached are the redline comments to the Financial Assurance Estimate. | 7/24/2017 11:19:27 AM |
View |
PCD Engineering Division
7/27/2017 12:21:21 PM |
Attached are the redline comments to the Grading and Erosion Control Plans. | 7/27/2017 12:21:21 PM |
PCD Engineering Division
7/24/2017 11:17:51 AM |
SWMP Checklist No. 8 remains. The estimate of runoff coefficients before and after project construction must be stated/identified in the SWMP report. |
7/24/2017 11:17:51 AM | |
PCD Engineering Division
7/24/2017 11:12:52 AM |
Comments resolved for the following: Letter of Intent, Site Plan, and Building Elevation. | 7/24/2017 11:12:52 AM | |
View |
Upper Black Squirrel Creek GWMD
7/19/2017 1:04:38 PM |
Please accept the following comment from Upper Black Squirrel Creek GWMD | 7/19/2017 1:04:38 PM |
View |
EPC Health Department
7/1/2017 10:26:03 PM |
7/1/2017 10:26:03 PM | |
Pikes Peak Regional Building Department
6/30/2017 8:54:08 AM |
Regarding a request for approval of a development plan for a sewage treatment facility on parcel 42303-12-001, Enumerations has the following comments: 1. The address of 9515 Meridian Ranch Blvd. was previously assigned to the proposed structure. Any building plans submitted for review/permit should be submitted under this address. Floodplain has no comment or objection to this submittal. BRENT JOHNSON Enumerations Plans Examiner (719) 327-2888 www.pprbd.org |
6/30/2017 8:54:08 AM | |
View |
PCD Project Manager
6/29/2017 8:16:02 AM |
Site Development | 6/29/2017 8:16:02 AM |
View |
PCD Project Manager
6/29/2017 8:15:40 AM |
LOI | 6/29/2017 8:15:40 AM |
View |
PCD Project Manager
6/29/2017 8:15:26 AM |
Landscaping | 6/29/2017 8:15:26 AM |
View |
PCD Project Manager
6/29/2017 8:14:58 AM |
GEC | 6/29/2017 8:14:58 AM |
View |
PCD Project Manager
6/29/2017 8:14:41 AM |
Financial Assurance | 6/29/2017 8:14:41 AM |
View |
PCD Project Manager
6/29/2017 8:14:16 AM |
ESQCP | 6/29/2017 8:14:16 AM |
View |
PCD Project Manager
6/29/2017 8:14:01 AM |
Elevation | 6/29/2017 8:14:01 AM |
View |
PCD Project Manager
6/29/2017 8:13:27 AM |
Drainage Letter | 6/29/2017 8:13:27 AM |
PCD Project Manager
6/29/2017 8:12:35 AM |
1. Should the site development plan be approved, collateral will be required. 2. Should the site development plan be approved, an inspection is required prior to building permit authorization for us to verify all improvements have been completed. |
6/29/2017 8:12:35 AM | |
Woodmen Road Metro
6/28/2017 12:10:46 PM |
In response to the proposed project this parcel will be subject to the Commercial Woodmen Road Metropolitan District Fee’s and mill levies This parcel is already Platted no Platting Fees due at time of final plat. Building Permit Fees are due at time of Building Permit. Building Permit Fees of $1.10/Sq Foot x 14,400 (Square Foot Building) = $15,840 Please contact our office should there be any questions. |
6/28/2017 12:10:46 PM | |
PCD Engineering Division
6/27/2017 10:17:18 AM |
Engineering redline comments on the following pdf documents will be uploaded by the project managers: Drainage Letter, Financial Assurance Estimates, Grading and Erosion Control, Letter of Intent, Site Development Plan and Building Elevations. | 6/27/2017 10:17:18 AM | |
View |
PCD Engineering Division
6/27/2017 10:15:25 AM |
See the attached SWMP Checklist for the items that were not address. Include the checklist with the resubmittal and identify the page where the item has been addressed. |
6/27/2017 10:15:25 AM |
View |
PCD Engineering Division
6/26/2017 4:21:42 PM |
Deviation request must be submitted using the attached template. | 6/26/2017 4:21:42 PM |
View |
Mountain View Electric Association, Inc.
6/21/2017 10:53:56 AM |
6/21/2017 10:53:56 AM |