Project Review Comments

Back to List


Project Name
Springs at Waterview Preliminary Plan
Description
A request for four concurrent applications of a sketch plan amendment, rezone, preliminary plan and final plat to allow for the creation of eighty (80) single family residential lots.
Location
The property is located northeast of the Bradley Road and Grinnell Road intersection.
Parcels
5507206036 5507206036
Applicant
Springs Engineering
Amanda Luciano ( Amanda.m.luciano@gmail.com )
(719) 650-9913
Amanda Luciano ( Amanda.m.luciano@gmail.com )
(719) 650-9913
EA Number
EA-16-051
File Number
SP16005
Project Manager
Nina Ruiz
Status
Closed
Created
5/2/2017 5:14:06 PM

View: Project Documents



Review Comments (44)

Link Agency Comment
View PCD Project Manager
6/13/2018 10:01:34 AM
CD Redlines 6/13/2018 10:01:34 AM
View PCD Project Manager
6/13/2018 10:01:13 AM
Drainage Redlines 6/13/2018 10:01:13 AM
PCD Engineering Division
6/4/2018 11:03:09 AM
Review 4: Engineering comments resolved. 6/4/2018 11:03:09 AM
View PCD Engineering Division
4/24/2018 3:24:04 PM
Review 4 comments to the early grading and erosion control plans is attached. 4/24/2018 3:24:04 PM
Colorado Division of Water Resources
4/16/2018 3:07:03 PM
Per review of the referral, it does not appear anything concerning the proposed water supply has been revised since this office's last review; therefore, please refer to this office's comments dated February 21, 2018. 4/16/2018 3:07:03 PM
View EPC County Attorney's Office
4/11/2018 2:55:31 PM
4/11/2018 2:55:31 PM
Colorado Geological Survey
4/4/2018 2:45:29 PM
General Note 4 on the preliminary plan has been corrected. CGS's 2/22/2018 review comments have therefore been satisfactorily addressed. 4/4/2018 2:45:29 PM
View PCD Project Manager
4/3/2018 2:25:16 PM
Preliminary Plan Redline 4/3/2018 2:25:16 PM
View PCD Project Manager
4/3/2018 2:24:51 PM
FAS Redline 4/3/2018 2:24:51 PM
View PCD Project Manager
4/3/2018 2:24:33 PM
Early Grading Redline 4/3/2018 2:24:33 PM
View PCD Project Manager
4/3/2018 2:24:04 PM
Drainage redlines 4/3/2018 2:24:04 PM
PCD Engineering Division
4/3/2018 12:48:49 PM
Review 3 comments to the following documents will be uploaded by the Project Manager:
- Drainage Report
- Early Grading and Erosion Control Plan
- Financial Assurance Estimate

No additional comments to the following documents:
- ESQCP
- SWMP
- Preliminary Plan
4/3/2018 12:48:49 PM
Pikes Peak Regional Building Department
4/3/2018 8:18:46 AM
Enumerations:

1. Note 12 stating no access to Escanaba Drive therefore, lots 1-15 will be addressed from Wolf Moon Drive.

2. If address is needed for the tracts indicate by placing (xxxx) in the exact locations the addresses will be utilized.

Floodplain has no objections or comment.
4/3/2018 8:18:46 AM
View Colorado Springs Airport Advisory Commission
3/29/2018 9:35:56 AM
3/29/2018 9:35:56 AM
PCD Project Manager
3/29/2018 7:35:49 AM
Redlines are to be provided upon completion by the PCD Engineering Division 3/29/2018 7:35:49 AM
View EPC Health Department
3/22/2018 9:38:57 PM
3/22/2018 9:38:57 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/19/2018 8:09:36 AM
Nina, I am attaching the previous third review memo for reference. we are recommending approval. I might have not put it as the final.

Thank You

Mike Gackle
Utilities Development Services
719-668-8262
3/19/2018 8:09:36 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/19/2018 8:08:34 AM
Nina, I am attaching the previous third review memo for reference. we are recommending approval. I might have not put it as the final.

Thank You

Mike Gackle
3/19/2018 8:08:34 AM
EPC County Attorney's Office
2/23/2018 8:11:02 AM
Applicant - Please do an updated Water Supply Information Summary reflecting the correct number of lots and water demand. Thank you. Edi Anderson
2/23/18
2/23/2018 8:11:02 AM
View PCD Project Manager
2/22/2018 5:02:57 PM
Preliminary Plan Redlines 2/22/2018 5:02:57 PM
View Colorado Geological Survey
2/22/2018 3:11:15 PM
General Note 4 on Sheet 1 of the Springs at Waterview Preliminary Plan (Dakota Springs Engineering, January 5, 2018) refers to a “Geologic hazard study by Earth Engineering Consultants…” The note should be corrected on the final plat to refer to Entech’s March 15, 2017 report.

Entech’s report contains a valid description of surface and subsurface conditions, soil engineering properties, and potential development constraints based on the results of four borings, and makes appropriate preliminary recommendations regarding subgrade preparation, including removal and recompaction of any loose soils encountered in foundation excavations. Provided Entech’s recommendations are strictly adhered to, CGS has no objection to approval of the subdivision as proposed.

See letter (uploaded). Thanks
2/22/2018 3:11:15 PM
View PCD Engineering Division
2/22/2018 1:43:47 PM
Use the attached ESQCP Form 2/22/2018 1:43:47 PM
View PCD Engineering Division
2/22/2018 1:39:48 PM
Review 2
Comments resolved on the following documents:
- Letter of Intent

Redline comments on the following documents will be uploaded by the Project Manager:
- Preliminary Site Plan

Per the email correspondence on Feb 20, 2018, an early grading permit is being request. Therefore, submit the following documents with the preliminary plan application:
- Financial Assurance Estimate (Section 1 only)
- ESQCP
- SWMP
- Pre-Development Site Grading Acknowledgement and Right of Access Form (attached)
- Standalone Early Grading and Erosion Control Plan set (w/ Cover Sheet). Early grading is for dirt work only, therefore the GEC will not show proposed road C&G's or proposed storm drains & inlets. Temporary sediment basins will be required on-site.

The PDR/FDR will need to be updated to include a section regarding early grading to include an exhibit delineating the tributary area for each proposed temporary sediment basin along with the associated sizing calculation.
2/22/2018 1:39:48 PM
PCD Project Manager
2/21/2018 2:15:20 PM
Minor Comment remaining on the preliminary plan drawing. Redlines are to be uploaded upon completion by the PCD Engineering Division. 2/21/2018 2:15:20 PM
View Colorado Department of Transportation - Pueblo Office
2/8/2018 1:34:29 PM
2/8/2018 1:34:29 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/2/2018 9:16:12 AM
Nina, attached is the third review memo for the subject application.

Thank You

Mike Gackle
Utilities Development Services
719-668-8262
2/2/2018 9:16:12 AM
View Colorado Department of Transportation - Pueblo Office
1/8/2018 9:06:52 AM
1/8/2018 9:06:52 AM
View EPC Parks Department
12/15/2017 11:47:18 AM
El Paso County Community Services/Parks Final Comments (PAB Endorsed 12/13/2017) 12/15/2017 11:47:18 AM
View Colorado Division of Water Resources
12/1/2017 2:48:05 PM
12/1/2017 2:48:05 PM
View PCD Project Manager
11/22/2017 2:59:32 PM
GEC Redlines 11/22/2017 2:59:32 PM
View PCD Project Manager
11/22/2017 2:58:54 PM
LOI Redlines 11/22/2017 2:58:54 PM
View PCD Project Manager
11/22/2017 2:58:29 PM
Preliminary Plan Redlines 11/22/2017 2:58:29 PM
PCD Project Manager
11/22/2017 3:03:27 PM
1. Per title commitment item 8 the mineral rights appear to be partial severed.
2. All comments from the sketch plan should be carried over to the preliminary plan, to include the traffic comments.
3. Review the CGS comments regarding submitting a revised soils report.
4. Only 1 application should be uploaded and the description does not reflect what is being requested. The zoning is also incorrect.
5. Engineering is has not completed their review. Additional comments may be submitted on behalf of engineering.
11/22/2017 3:03:27 PM
View Colorado Geological Survey
11/22/2017 9:52:10 AM
CGS previously reviewed Springs at Waterview; comments were provided in a letter dated November 3, 2016. The only new geologic information posted with the currently available referral documents is NRCS Soil Survey data, which is valid for only the uppermost five feet of soil, and does not meet the requirement for a site specific geotechnical investigation discussed in our 11/3/2016 letter (attached). 11/22/2017 9:52:10 AM
Pikes Peak Regional Building Department
11/21/2017 2:17:21 PM
Enumerations has the following comments:

Grinnell road is incorrect; should be Grinnell Blvd.

DEVELOPMENT PLAN STAGE:

FOR TRACT AND LOT ADDRESSING PLACE (XXXX) WHERE THEY INTEND TO BE UTILIZED.

CONTACT ENUMERATIONS DEPARTMENT FOR ADDRESSING. AMY@PPRBD.ORG OR BRENT@PPRBD.ORG


FINAL PLAT STAGE:

ENUMERATIONS/FLOODPLAIN WILL REVIEW THE MYLAR PRIOR TO PLAT FOR ADDRESS PLACEMENT, ROAD NAMING, TITLE BLOCK, & FLOODPLAIN STATEMENT.

$10.00 PER LOT & TRACT FEE WILL BE DUE AT THE TIME OF THE REVIEW OF THE MYLAR. IF AN ADDRESS IN NOT NEEDED ON A TRACT THEN NO FEE APPLIES. CHECK SHOULD BE MADE OUT TO PIKES PEAK REGIONAL BUILDING DEPARTMENT. PAID DIRECTLY TO ENUMERATIONS DEPARTMENT.

A COPY OF THE FINAL RECORDED PLAT IS REQUIRED PRIOR TO PLAN SUBMITTAL FOR RESIDENTAL.
11/21/2017 2:17:21 PM
Cherokee Metro Dist
11/21/2017 12:26:55 PM
This development is outside the service boundary of the Cherokee Metropolitan District. 11/21/2017 12:26:55 PM
View EPC Parks Department
11/21/2017 10:30:01 AM
El Paso County Community Services/Parks Preliminary Comments 11/21/2017 10:30:01 AM
View EPC Environmental Services
11/20/2017 2:55:15 PM
11/20/2017 2:55:15 PM
911 Authority - El Paso/Teller County
11/20/2017 9:39:54 AM
Passing Sky Dr – Acceptable, Logical Continuation

Wolf Moon Drive – Acceptable

New Moon Drive – Acceptable, suffix should be adjusted to Court, Place, Way, Terrace, Lane, Loop, Trail, or Path

Thank you
Justin
11/20/2017 9:39:54 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/17/2017 9:48:43 AM
Nina, attached is the second review memo for the subject application.

Thank You

Mike Gackle
Utilities Development Services
719-668-8262
11/17/2017 9:48:43 AM
PCD Engineering Division
11/27/2017 8:20:05 AM
Engineering redline comments to the following documents will be uploaded by the Project Manager:
1. Letter of Intent
2. Grading and Erosion Control Plan
3. Preliminary Plan
11/27/2017 8:20:05 AM
View Colorado Springs Airport Advisory Commission
11/16/2017 8:16:55 AM
11/16/2017 8:16:55 AM
View EPC Health Department
11/13/2017 1:01:04 PM
11/13/2017 1:01:04 PM
View Colorado State Forest Service
11/8/2017 12:59:21 PM
11/8/2017 12:59:21 PM