Project Name
D49 Elementary
Description
Site Development Plan to allow for the construction of a new Elementary School
Location
The property is located southwest of the Londonderry Drive and Meridian Road intersection.
Parcels
5225301022 5225301022
Applicant
JPS Engineering, Inc.
John Schwab ( john@jpsengr.com )
(719) 477-9429
John Schwab ( john@jpsengr.com )
(719) 477-9429
EA Number
EA-16-138
File Number
PPR17019
Project Manager
Nina Ruiz
Status
Closed
Created
4/12/2017 12:16:37 PM

View: Project Documents



Review Comments (18)

Link Agency Comment
PCD Engineering Division
7/16/2018 5:11:48 PM
No additional comments 7/16/2018 5:11:48 PM
View PCD Engineering Division
6/21/2018 4:56:56 PM
See attached for review 3 comments to the signage and striping. 6/21/2018 4:56:56 PM
View PCD Project Manager
6/4/2018 9:35:51 AM
CD Redlines 6/4/2018 9:35:51 AM
PCD Engineering Division
6/4/2018 8:35:32 AM
Review 2: Redline comments to the signing/striping plan will be uploaded by the Project Manager. 6/4/2018 8:35:32 AM
PCD Engineering Division
4/4/2018 7:16:36 AM
Below are the review comments received from the County Engineer for the District 40 Londonderry Elementary School Signing and Striping Plans. From discussions with Jeff Hodsdon, he is preparing the signage/striping plans for Towner Avenue. If possible I would recommend that the Londonderry Drive and Towner Avenue striping plans be combined under a single signage and striping plans.

Sheet 1
• Remove general note 1 reference to detail S-614-40 and 614-42 since a traffic signal is not being constructed.
• Update general note 2 reference to the newer 2017 standard specifications.
• Remove general notes 10 and 11 since a traffic signal is not being constructed.
• Replace the Design Engineer’s Statement with the El Paso County Standard Signature Block.

Sheet 2
• Update Signage and Striping Note 9 to clarify the retroreflective sheeting background material type that at a minimum, ASTM 4956 Type IV shall be used for ground mount signs.
• Update Signing and Striping Note 11 by replacing the following:
o “tapered leading edges” with “approach edge tapering”.
o “Word and symbol markings shall be the narrow type” with “Arrow pavement markings shall be the optional MUTCD narrow elongated design.”
o Replace the crosswalk sentence with “Continental crosswalk line shall be 12 inches wide and at least 8 foot long, per CDOT S-627-1.
• Replace Signing and Striping Note 12 with “Longitudinal line pavement markings shall be in conformance with CDOT Standard Specifications Section 627 Pavement Marking and CDOT Standard Plan, S-627-1 Pavement Markings.”
• Replace “Public Service Department (PSD)” with “Department of Public Works (DPW)”.

Sheet 3
• Relocate the proposed school crossing from the east side of the Tottenham Ct intersection to the west side and install a raised median refuge island. Provide in-street signing in the median pedestrian refuge area consistent with MUTCD Figure 7B-2 and 7B-4.
• Increase the width of the center median from 12 ft to 14-16 feet in order to maximize the width of a proposed raised median pedestrian refuge island and still permit 12 ft travel lanes.
• Extend the center two-way left turn lane further east to Meridian Road to be consistent along the roadway and this removes the need for the WB redirect approach taper.
• Restripe the WBLT at the Londonderry Avenue intersection to a designated WB left turn and taper with two arrows per CDOT S-627-1 Sheet 5 since this is a public intersection.
• Per signing and striping note 11 & 12 revise the crosswalk bars callout from 2’x10’ to 1’x8’.
• Rather than a designated reduced school speed limit school zone with active devices, replace with fines double designated school zone.
4/4/2018 7:16:36 AM
Pikes Peak Regional Building Department
5/19/2017 1:16:17 PM
Enumeration and Floodplain have no additional comments to this submittal. 5/19/2017 1:16:17 PM
EPC Health Department
5/19/2017 12:05:45 PM
19May2017: Please see comments submitted 02May2017.
Mike McCarthy
El Paso County Public Health
719-575-8602
5/19/2017 12:05:45 PM
PCD Engineering Division
5/15/2017 3:37:38 PM
Will the proposed signage and striping for Towner be included with the resubmittal or as a separate submittal at a later date?

If school signage/striping on Towner is anticipated to not be part of this plan set, then add a note on the Site Development Plan (Sheet C1.1) that access permit from Towner Avenue will not be granted until approved signage/striping plans along Towner Avenue are submitted.
5/15/2017 3:37:38 PM
PCD Engineering Division
5/15/2017 3:18:02 PM
Engineering comments for the following items are incorporated in the redlined pdf’s uploaded by the PCD project manager: Traffic Study, Grading and Erosion Control, Site Development Plan, Landscape Plan, Signage Plan, and ESQCP 5/15/2017 3:18:02 PM
PCD Engineering Division
5/15/2017 3:33:20 PM
Extract the construction plans for the offsite signage and striping and submit as a standalone set. The PM has created a line item for Street Construction Plans (Signage and Striping) in the electronic submittal. 5/15/2017 3:33:20 PM
PCD Engineering Division
5/10/2017 1:05:52 PM
The PM has created a new document in the submittal website for SWMP.
Extract the SWMP from the ESQCP pdf file and upload as a separate document.
5/10/2017 1:05:52 PM
PCD Engineering Division
5/10/2017 1:01:42 PM
Extract the following documents from the Final Drainage Report and submit as a standalone document. The PM has created a specific line item on the electronic submittal.
1. SDI Data Sheet
2. MS4 Post Construction Form
3. O&M Manual.
5/10/2017 1:01:42 PM
Pikes Peak Regional Building Department
5/5/2017 8:57:40 AM
Regarding a request for a site development plan for a new school at 11243 Londonderry Dr, Enumerations has the following comments:

1. Since the parent/visitor access to the new school building is on the Londonderry Dr. side of the property, the use of the previously assigned address of 11243 Londonderry Dr. is appropriate.





Floodplain has no comment of objection to this submittal.
5/5/2017 8:57:40 AM
View EPC Health Department
5/2/2017 11:27:47 AM
5/2/2017 11:27:47 AM
View Mountain View Electric Association, Inc.
4/25/2017 3:27:50 PM
4/25/2017 3:27:50 PM
View EPC Environmental Services
4/25/2017 12:37:43 PM
4/25/2017 12:37:43 PM
View EPC County Attorney's Office
4/24/2017 2:56:04 PM
4/24/2017 2:56:04 PM
PCD Engineering Division
4/24/2017 2:34:34 PM
Engineering comments on the following items are incorporated in the redlined pdf’s which will be uploaded by the PCD project manager: Drainage Report, Traffic Study, Grading and Erosion Control, Site Development Plan, Landscape Plan, Signage Plan, and ESQCP. 4/24/2017 2:34:34 PM