EPC Logo

Planning and Community Development Department

ACCESS PERMIT (DRIVEWAY) PERMIT


FILE NO. AP24958
YEAR 2024

The undersigned applicant agrees to perform all work in accordance with the El Paso County Subdivision Criteria Manual, El Paso Land Development Code, recorded plat (if applicable), requirements specified below, and any permit attachments. Should the preceeding conditions not be satisfied, this permit shall be considered NULL and VOID.

Approved: 10/4/2024 Complete work by: 1/2/2025
Address:
20512 W THUNDER RD
COLORADO SPRINGS, CO 80908
Parcel:
6101002004  
Type of Driveway Access:
Secondary Open-Ditch Driveway Access
 
Remarks:

An 18 inch minimum diameter capacity culvert is REQUIRED within the right-of-way. Installation of an elliptical culvert (15x21) may be advised in areas where existing ditch is shallow. Any ditch excavation or re-grading needed to allow for proper installation of the culvert, maintaining positive drainage and stabilization of all disturbed area is the responsibility of the property owner served by the access granted. Single access, maximum width 24 feet. Concrete or metal culvert required as plastic is no longer allowed. Maximum 4%grade for the first 20' from edge of public roadway.

View Driveway Detail and Specification Sheet Open Ditch at Planning and Development Forms (https://planningdevelopment.elpasoco.com/planning-development-forms/)


REQUIREMENTS:
  1. STATE LAW REQUIRES that utilities be located prior to construction. At least two days advance notice must be given. Phone 1-800-922-1987
  2. All work sites must be signed and protected in accordance with the current issue of the MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES and any permit attachments.
  3. Should it become necessary for El Paso County to sign, light and barricade hazardous areas or restore the Right-of-Way to its original condition, all costs of said work shall be borne by the applicant.
  4. All backfill shall be compacted to 90% of AASHTO T-180 unless otherwise specified.
  5. ALL ACCESSES ARE SUBJECT TO RECONSIDERATION UPON LAND USE OR TRAFFIC CHANGES. All permits issued are for a SINGLE ACCESS point to a specific roadway.
  6. Road closure will not be permitted.
  7. This permit is not good for access to planned arterial roadways.
  8. Permit is VOID if construction is not completed within 90 days.
  9. Applicant should contact local Fire Protection District for any additional requirements.
  10. Monuments within the ROW are not included with this permit; an EPC DOT Encroachment Permit may be required. Please call (719)520-6460 for information.
Approved
10/4/2024
Complete work by
1/2/2025
Address:
20512 W THUNDER RD
COLORADO SPRINGS, CO 80908
Parcel:
6101002004  
Type of Driveway Access
Secondary Open-Ditch Driveway Access
Remarks:

An 18 inch minimum diameter capacity culvert is REQUIRED within the right-of-way. Installation of an elliptical culvert (15x21) may be advised in areas where existing ditch is shallow. Any ditch excavation or re-grading needed to allow for proper installation of the culvert, maintaining positive drainage and stabilization of all disturbed area is the responsibility of the property owner served by the access granted. Single access, maximum width 24 feet. Concrete or metal culvert required as plastic is no longer allowed. Maximum 4%grade for the first 20' from edge of public roadway.

View Driveway Detail and Specification Sheet Open Ditch at Planning and Development Forms (https://planningdevelopment.elpasoco.com/planning-development-forms/)


REQUIREMENTS:
  1. STATE LAW REQUIRES that utilities be located prior to construction. At least two days advance notice must be given. Phone 1-800-922-1987
  2. All work sites must be signed and protected in accordance with the current issue of the MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES and any permit attachments.
  3. Should it become necessary for El Paso County to sign, light and barricade hazardous areas or restore the Right-of-Way to its original condition, all costs of said work shall be borne by the applicant.
  4. All backfill shall be compacted to 90% of AASHTO T-180 unless otherwise specified.
  5. ALL ACCESSES ARE SUBJECT TO RECONSIDERATION UPON LAND USE OR TRAFFIC CHANGES. All permits issued are for a SINGLE ACCESS point to a specific roadway.
  6. Road closure will not be permitted.
  7. This permit is not good for access to planned arterial roadways.
  8. Permit is VOID if construction is not completed within 90 days.
  9. Applicant should contact local Fire Protection District for any additional requirements.
  10. Monuments within the ROW are not included with this permit; an EPC DOT Encroachment Permit may be required. Please call (719)520-6460 for information.


2880 International Circle, Suite 110
Phone: (719) 520-6300
EPC Logo Colorado Springs, CO 80910
Fax: (719) 520-6695
epcdevplanreview.com