Permit

Back to Project

Print this page
EPC Logo

Planning and Community Development Department

AGRICULTURAL STRUCTURE EXEMPTION


FILE NO. AG2233
YEAR 2022

Applicant:
Bryan Alley
(916) 239-9233
Address:
10220 Hardy Rd
Colorado Springs, CO 80908
Address of Agricultural Exemption:
10220 HARDY RD
COLORADO SPRINGS, CO 80908
Parcel:
5114002007  
Legal Description:
LOT 2 REIMERS MINOR SUB
Zone:
RR-5
Description of Agricultural Exemption:
2 stall loafing shed for horses. To protect them from the elements. Shelter will remain empty
Existing Structure
Square Footage:
240
Exterior Appearance:
Appropriately sized doors to allow for livestock and/or agricultural implements and machinery to enter and exit the structure (REQUIRED); Shelter Overhang; Appropriate siding material for weather exposure; Finished wood panels, vinyl siding, brick or stone veneer siding, stuco, etc.;
Use of the Structure:
Shelter for livestock (including hen chickens) or for the storage of the feed and equipment relating to the care, training, raising, and/or maintenance of the livestock (including hen chickens);
Applicant:
Bryan Alley
(916) 239-9233
Address:
10220 Hardy Rd
Colorado Springs, CO 80908
Address of Agricultural Exemption:
10220 HARDY RD
COLORADO SPRINGS, CO 80908
Parcel:
5114002007  
Legal Description:
LOT 2 REIMERS MINOR SUB
Zone:
RR-5
Owner
Same as Applicant
Description of Agricultural Exemption
2 stall loafing shed for horses. To protect them from the elements. Shelter will remain empty
Existing Structure
Square Footage
240
Exterior Appearance
Appropriately sized doors to allow for livestock and/or agricultural implements and machinery to enter and exit the structure (REQUIRED); Shelter Overhang; Appropriate siding material for weather exposure; Finished wood panels, vinyl siding, brick or stone veneer siding, stuco, etc.;
Use of the Structure
Shelter for livestock (including hen chickens) or for the storage of the feed and equipment relating to the care, training, raising, and/or maintenance of the livestock (including hen chickens);


PCD Site Plans Approval -- by Petra Rangel on 9/7/2022
EPC Code Enforcement Approval -- by Mindy Madden on 11/10/2022

APPROVAL CONDITIONS