Project Review Comments

Back to List


File Number
TWR265
Project Name
115 Fontaine Blvd - Verizon Wireless Co-locatation
Description
Installation of antenna and ground equipment. Improvements to the tower include: · INSTALL (3) ERICSSON - AIR3283, (3) ERICSSON - AIR6419, (3) COMMSCOPE - NNSS-65B-HG-R2B, (3) ERICSSON - 4490 RRU, (1) RAYCAP - RVZDC-6627-PF-48, (2) 6X12 HYBRID CABLES. ± 90', (3) STD 2" ANTENNA MOUNT PIPES. Ground improvements include: INSTALL (1) ERICSSON - 6672 BBU, (1) RAYCAP - RVZDC-4520-RM-48, (1) RF CABINET, (1) BATTERY CABINET, (1) COMMSCOPE - S064865 2 BAY ASSEMBLY PLINTH, (1) REHLKO - 30KW 30REOZK OUTDOOR DIESEL GENERATOR, (1) VERIZON APPROVED ILC, 1) H-FRAME, (1) VERIZON APPROVED ICE BRIDGE. ± 10', (1) 200A BREAKER IN (E) METER PAK FOR VZW SERVICE, (1) 11'X15' CONCRETE EQUIPMENT PAD, (1) PERFECT VISION PV-WC1010-B, (1) "VERIZON WIRELESS ONLY" SCH40 PVC CONDUIT WITH INNERDUCTS. ± 10', (1) 24"X36" VEHICLE RATED HAND HOLE FOR "VERIZON WIRELESS ONLY" FIBER SERVICE · INSTALL (1) 2" CONDUIT WITH (3) 3/0 AND (1) 6 AWG FROM ILC TO METER. ± 25', (1) 1" CONDUIT WITH (4) 12 AWG & (1) 12 AWG FROM ILC TO GENERATOR. (GEN HEATER & BATTERY CHARGER). ± 10', (1) ALARM CABLE FROM GENERATOR TO ILC. ± 10'
Parcels
6524106023 6524106023
Applicant
Kappa Consulting, LLC
Kelly Harrison ( kharrison@ymail.com )
(303) 748-0599
Kelly Harrison ( kharrison@ymail.com )
(303) 748-0599
File Number
TWR265
Project Manager
Jen Uhler
Status
Closed
Created
2/19/2026 8:39:52 AM

View: Project Documents



Review Comments (10)

Link Agency Review # Comment
Colorado Springs Airport Advisory Commission
4/24/2026 1:52:23 PM
2 This was reviewed and approved by the Airport Advisory Commission on 4/23/2026 with the below comments.

• Avigation Easement: An avigation easement is requested or provide proof of previous recording (book/page or reception number).

• FAA Form 7460: If use of equipment (permanent or temporary) will exceed 200 feet above ground level in height at this site, the applicant is to file an airspace evaluation case with the Federal Aviation Administration (FAA) and provide the results to the Airport before the commencement of construction activities; FAA’s website (https://oeaaa.faa.gov/oeaaa/external/portal.jsp).

• FAA Form 7460-1 Frequency Review: The applicant is to file an airspace evaluation case with the FAA for the purposes of a frequency review/analysis and provide confirmation of approval from FAA to Airport prior to the commencement of construction activities; FAA’s website (https://oeaaa.faa.gov/oeaaa/external/portal.jsp).
4/24/2026 1:52:23 PM
Mountain View Electric Association, Inc.
4/13/2026 10:45:03 AM
1 No Comment - This is outside of MVEA Service Territory. 4/13/2026 10:45:03 AM
View PCD Project Manager
4/9/2026 10:09:37 AM
1 Planning has reviewed the submittal, and has comments on the following documents:
- Site Plan Drawing
- Lease agreement

Please see attached PDF for comments. You will receive a re-submittal link from EDARP for the above documents. Reach out with any questions.

Jen Uhler
PCD Planner
719-520-7952
jenuhler@elpasoco.com
4/9/2026 10:09:37 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/8/2026 3:52:45 PM
1 The proposed project is outside Colorado Springs Utilities service area. CSU has no action Item comments. 4/8/2026 3:52:45 PM
Fountain
4/8/2026 12:05:22 PM
1 No comments. 4/8/2026 12:05:22 PM
Pikes Peak Regional Building Department
4/8/2026 11:17:21 AM
1 Enumerations has the following comments:

1. This new Verizon installation should use the address of 82A Widefield Blvd.

Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
4/8/2026 11:17:21 AM
Security Fire Protection District
4/7/2026 3:36:53 PM
1 Below are Permit Quantities for Hazardous Materials. No Objections
MAS for SFD
4/7/2026 3:36:53 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/7/2026 7:04:30 AM
1 LBS has no comments 4/7/2026 7:04:30 AM
EPC DPW Stormwater
4/6/2026 1:04:18 PM
1 EPC DPW Stormwater has no comments.

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
4/6/2026 1:04:18 PM
EPC DPW Development Services - Engineering
4/6/2026 7:58:12 AM
1 Engineering has no comments on the submitted documents. No additional review needed. The EPC Road Impact Fee program does not apply.

Reviewed by:
Joe Sandstrom, EIT, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
4/6/2026 7:58:12 AM