Project Review Comments

Back to List


Project Name
Deviation Latigo Fil 10 Plat
Description
2021 Final plat for 39 lots. Latigo Trails Preliminary Plan (SP-01-011) was previously approved with significant constraints depicted. CSG and USFWS review required. No expiration on prelim plan very rare.
Location
Parcels
4200000345 4200000345 4200000348 4200000348 4200000352 4200000352
Applicant
William Guman & Associates, Ltd.
Bill Guman ( bill@guman.net )
(719) 633-9700
Bill Guman ( bill@guman.net )
(719) 633-9700
EA Number
EA20184
File Number
DEV222
Project Manager
Kylie Bagley
Status
Closed
Created
7/25/2022 11:04:12 AM

View: Project Documents



Review Comments (11)

Link Agency Comment
PCD Project Manager
11/2/2022 3:39:33 PM
No further comments at this time 11/2/2022 3:39:33 PM
PCD Engineering Division
11/1/2022 2:47:08 PM
Comments resolved and the deviation request has been forwarded to the Engineering Manager for approval. The project manager will upload the form once a determination has been made.

Reviewed by:
Gilbert LaForce, P.E.
gilbertlaforce@elpasoco.com
11/1/2022 2:47:08 PM
EPC Stormwater Review
10/20/2022 10:21:41 PM
Review 2: EPC Stormwater comments have been resolved on the following documents:
- Infiltration Report

EPC Stormwater has no further comments. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
GlennReese@elpasoco.com
10/20/2022 10:21:41 PM
PCD Project Manager
10/3/2022 11:05:31 AM
No Planning Comments at this time 10/3/2022 11:05:31 AM
View PCD Engineering Division
9/28/2022 10:23:04 AM
Review #2: Infiltration Report (See comment on page 14 of the report) 9/28/2022 10:23:04 AM
View PCD Engineering Division
9/28/2022 10:20:55 AM
Review #2: Deviation Request Form

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
9/28/2022 10:20:55 AM
EPC Stormwater Review
9/28/2022 11:15:23 AM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Infiltration Report...(to be uploaded by Gilbert with PCD)

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
GlennReese@elpasoco.com
9/28/2022 11:15:23 AM
PCD Project Manager
8/4/2022 3:35:54 PM
The planning department has no comment 8/4/2022 3:35:54 PM
View PCD Engineering Division
8/4/2022 12:50:36 PM
Review 1: Redline comments to the deviation request is attached. Address the comments and submit with signatures. Contact the review engineer for and questions/clarifications to the comments provided.

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
8/4/2022 12:50:36 PM
Upper Black Squirrel Creek GWMD
8/2/2022 7:50:01 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. 8/2/2022 7:50:01 PM
View Colorado Division of Water Resources
8/1/2022 8:51:52 AM
8/1/2022 8:51:52 AM