View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
10/20/2022 12:08:26 PM |
Engineer Review Ver.3 No further engineer comments. Comments were addressed on the GEC and SDP. Documents routed for ECM Admin approval. Thank you Edward Schoenheit, Engineer I E.P.C. Planning & Community Development 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
10/20/2022 12:08:26 PM | |
PCD Project Manager
10/19/2022 10:26:51 AM |
Please see Engineering comments remaining on SDP - Site Development Plan_V1 - redlines Please refer to the latest review notes from Engineering and resubmit. No further comments from Planning. |
10/19/2022 10:26:51 AM | |
PCD Engineering Division
10/19/2022 9:14:00 AM |
PCD Engineering Division Engineer Review Ver. 2 Please see engineer redline comments on the following documents. Please make corrections on documents and resubmit to EDARP for immediate re-review Planner to set engineer re-review period for NTE 7 days. Resubmittal will be reviewed upon receipt. -GEC plan with std notes and ENGR signatures -Site Dev Plan with entry curb radius to 20ft and entrance width to 25ft. (Utility plan to match SDP for curb return 20ft) -Standard Design Detail 2-26 added to Site Dev Plan. -Final owner signatures on required documents will be obtained after final review close out. Thank you Edward Schoenheit, Engineer I E.P.C. Planning & Community Development 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
10/19/2022 9:14:00 AM | |
View |
Cherokee Metro Dist
10/17/2022 4:33:30 PM |
Please make changes specified in attached markup and resubmit. | 10/17/2022 4:33:30 PM |
View |
EPC Health Department
8/21/2022 9:09:10 PM |
8/21/2022 9:09:10 PM | |
View |
Falcon Fire Protection District
8/2/2022 9:24:00 AM |
8/2/2022 9:24:00 AM | |
View |
Colorado Springs Airport Advisory Commission
7/28/2022 9:42:57 AM |
This item was presented to Airport Advisory Commission at the meeting held on 7/27/2022 with no objections. The summary sheet with comments is attached. | 7/28/2022 9:42:57 AM |
View |
PCD Project Manager
7/26/2022 7:22:49 PM |
Utility Plan_V1 redlines | 7/26/2022 7:22:49 PM |
View |
PCD Project Manager
7/26/2022 7:22:24 PM |
Site Development Plan_V1 redlines | 7/26/2022 7:22:24 PM |
View |
PCD Project Manager
7/26/2022 7:21:56 PM |
PBMP Applicability Form_V1 redlines | 7/26/2022 7:21:56 PM |
View |
PCD Project Manager
7/26/2022 7:21:36 PM |
Lighting Plan_V1 redlines | 7/26/2022 7:21:36 PM |
View |
PCD Project Manager
7/26/2022 7:21:02 PM |
Letter of Intent_V1 redlines | 7/26/2022 7:21:02 PM |
View |
PCD Project Manager
7/26/2022 7:20:41 PM |
Landscape Plan Drawings_V1 redlines | 7/26/2022 7:20:41 PM |
View |
PCD Project Manager
7/26/2022 7:20:11 PM |
Grading Plan_V1 redlines | 7/26/2022 7:20:11 PM |
View |
PCD Project Manager
7/26/2022 7:19:42 PM |
Drainage Letter_V1 redlines | 7/26/2022 7:19:42 PM |
View |
PCD Project Manager
7/26/2022 7:18:57 PM |
Application Petition Form_V1 redlines | 7/26/2022 7:18:57 PM |
Pikes Peak Regional Building Department
7/26/2022 10:36:22 AM |
1. It appears this office/warehouse building is for a single tenant, if this is not the case, please provide secondary addressing for the building. Link to our secondary addressing guide https://www.pprbd.org/File/Resources/Downloads/Addressing/SECONDARY_ADDRESS_REQUEST_FORM.pdf 2. The proposed office/warehouse can use the platted address of 7920 Industry Road when submitting plans to RBD for permit. 3. It appears both the fence and the trash enclosure will be less than 7’ in height. No separate address or permit will be required. 4. No further comments. Thanks, Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
7/26/2022 10:36:22 AM | |
PCD Engineering Division
7/25/2022 3:23:14 PM |
Engineer Review Ver. 1 Please see engineer redline comments on the following documents. Project Manager will upload review documents. - Letter of Intent - Site Development Plan - Drainage Letter - Grading Plan - Utility Plan - PBMP Form (sign) Thank you Edward Schoenheit, Engineer I E.P.C. Planning & Community Development 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
7/25/2022 3:23:14 PM | |
EPC Stormwater Review
7/21/2022 4:40:29 PM |
Stormwater does not have any comments at this time. | 7/21/2022 4:40:29 PM | |
View |
Mountain View Electric Association, Inc.
7/20/2022 8:09:48 AM |
See attached comments | 7/20/2022 8:09:48 AM |
View |
El Paso County Conservation Dist
7/19/2022 8:43:41 AM |
Native grass seed mix information submitted as .jpg | 7/19/2022 8:43:41 AM |
View |
El Paso County Conservation Dist
7/19/2022 8:43:26 AM |
Brief comments included within .docx | 7/19/2022 8:43:26 AM |
Cherokee Metro Dist
7/18/2022 10:34:49 AM |
Drawing U1 - Add Note: water service line to be non-copper. Acceptable material include HDPE CTS (blue). Show location of curb stop 2' inside property line if no sidewalk. | 7/18/2022 10:34:49 AM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/11/2022 7:51:13 AM |
For any questions regarding Springs Utilities'' gas services and design, please contact Springs Utilities field engineering at 719-668-4985. Corey Masoumi - cmasoumi@csu.org |
7/11/2022 7:51:13 AM |