Project Review Comments

Back to List


Project Name
Falcon Les Schwab Tire
Description
Site Development Plan for new construction
Location
Parcels
5312114001 5312114001
Applicant
Cushing Terrell
Robert Walker ( robertwalker@cushingterrell.com )
(720) 449-7556
Robert Walker ( robertwalker@cushingterrell.com )
(720) 449-7556
File Number
PPR2123
Project Manager
John Green
Status
Closed
Created
12/7/2020 3:40:59 PM

View: Project Documents



Review Comments (37)

Link Agency Comment
PCD Project Manager
10/21/2021 4:16:11 PM
No additional Planning comments at this time. Pending approval. 10/21/2021 4:16:11 PM
PCD Engineering Division
10/18/2021 11:24:21 AM
There are no further engineering comments relating to drainage or transportation. Any approved documents will be uploaded by the project manager.

Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
10/18/2021 11:24:21 AM
View PCD Project Manager
10/8/2021 4:23:51 PM
Please see redline comments on Drainage Report 10/8/2021 4:23:51 PM
PCD Engineering Division
10/4/2021 4:50:32 PM
The project manager will upload comments. Please address comments to get approval started. Submit the signed and stamped documents for approval:

-Drainage report
-GEC plan

Comments have been resolved in the Letter of Intent.


Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
10/4/2021 4:50:32 PM
View Mountain View Electric Association, Inc.
9/29/2021 8:52:10 AM
See attached comments 9/29/2021 8:52:10 AM
EPC Stormwater Review
9/23/2021 2:35:14 PM
Review 3: EPC Stormwater comments have been resolved on the following documents:
- Drainage Report
- GEC Checklist
- SWMP Checklist
- SWMP

EPC Stormwater has no further comments at this time. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
9/23/2021 2:35:14 PM
View PCD Project Manager
8/26/2021 2:32:32 PM
Please see redline comments on soils report 8/26/2021 2:32:32 PM
View PCD Project Manager
8/26/2021 2:31:03 PM
Please see redline comments on Site Development Plan 8/26/2021 2:31:03 PM
View PCD Project Manager
8/26/2021 2:30:21 PM
Please see redline comments on Letter of Intent 8/26/2021 2:30:21 PM
View PCD Project Manager
8/26/2021 2:29:48 PM
Please see redline comments on Landscape Plan Drawings 8/26/2021 2:29:48 PM
View PCD Project Manager
8/26/2021 2:29:18 PM
Please see redline comments on Drainage Report 8/26/2021 2:29:18 PM
View PCD Project Manager
8/26/2021 2:28:50 PM
Please see redline comments on Application Form 8/26/2021 2:28:50 PM
PCD Engineering Division
8/25/2021 10:29:40 AM
Review 2 comments will be uploaded by the project manager. Please address comments on the following documents:

-Letter of Intent
-Drainage Report

Comments have been resolved on the following documents, please submit documents with appropriate stamps/signatures once PCD Engineering comments and EPC Stormwater comments have been completely resolved.

-FAE
-GEC plans
-Site Plan

Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
8/25/2021 10:29:40 AM
View EPC Stormwater Review
8/25/2021 8:12:20 AM
SWMP_v2 8/25/2021 8:12:20 AM
View EPC Stormwater Review
8/25/2021 8:12:06 AM
SWMP Checklist_v2 8/25/2021 8:12:06 AM
View EPC Stormwater Review
8/25/2021 8:11:49 AM
GEC Checklist_v2 8/25/2021 8:11:49 AM
Mountain View Electric Association, Inc.
8/23/2021 11:41:25 AM
Please reference the letter dated February 1, 2021 for AL215 - no additional comments at this time. 8/23/2021 11:41:25 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
8/10/2021 11:50:15 AM
No further comments. Approval is recommended.

Caleb Savage
cjsavage@csu.org
719-668-1855
8/10/2021 11:50:15 AM
EPC Stormwater Review
8/9/2021 1:57:14 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report....(to be uploaded by PM with PCD comments)
- GEC Checklist
- SWMP Checklist
- SWMP

EPC Stormwater comments have been resolved on the following documents:
- FAE
- GEC Plan
- PBMP Applicability Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
8/9/2021 1:57:14 PM
View PCD Project Manager
5/31/2021 10:23:54 AM
Please see redline comments for Site Development Plan 5/31/2021 10:23:54 AM
View PCD Project Manager
5/31/2021 10:23:14 AM
Please see redline comments for Letter of Intent 5/31/2021 10:23:14 AM
View PCD Project Manager
5/31/2021 10:22:40 AM
Please see redline comments for Landscape Plans 5/31/2021 10:22:40 AM
View PCD Project Manager
5/31/2021 10:22:05 AM
Please see redline comments for GEC Plan 5/31/2021 10:22:05 AM
View PCD Project Manager
5/31/2021 10:21:25 AM
Please see redline comments for FAE 5/31/2021 10:21:25 AM
View PCD Project Manager
5/31/2021 10:20:55 AM
Please see redline comments for Drainage Report 5/31/2021 10:20:55 AM
View PCD Project Manager
5/31/2021 10:20:03 AM
Please see redline comments for application form 5/31/2021 10:20:03 AM
PCD Engineering Division
5/25/2021 8:50:38 AM
Review 1 comments will be uploaded by the project manager. Please address comments on the following documents:

-Drainage letter
-Site development plan
-GEC plan
-Letter of intent
-Financial assurance form

Reviewed by:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
5/25/2021 8:50:38 AM
View EPC Stormwater Review
5/24/2021 10:43:31 AM
PBMP Applicability Form_v1 5/24/2021 10:43:31 AM
View EPC Stormwater Review
5/24/2021 10:43:18 AM
Grading & Erosion Control checklist_v1 5/24/2021 10:43:18 AM
EPC Stormwater Review
5/24/2021 9:46:34 AM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report....(to be uploaded by PM with PCD comments)
- FAE........................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist
- PBMP Applicability Form

Please include the following documents on resubmittal:
- ESQCP
- SWMP

John - please open an EDARP submittal request for the ESQCP, SWMP, and Geotech Report (which was attached to the GEC Plan).

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer I
glennreese@elpasoco.com
5/24/2021 9:46:34 AM
Pikes Peak Regional Building Department
5/20/2021 4:06:57 PM
7105 Meridian Ranch Road address should be used for this building. Old Meridian Way is not correct.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
5/20/2021 4:06:57 PM
View Mountain View Electric Association, Inc.
5/18/2021 2:55:53 PM
See attached comments 5/18/2021 2:55:53 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/11/2021 9:06:43 AM
5/11/2021 9:06:43 AM
Upper Black Squirrel Creek GWMD
5/5/2021 2:43:32 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment later if need be. 5/5/2021 2:43:32 PM
County Attorney - Development Review
5/5/2021 1:45:30 PM
No comments at this time. 5/5/2021 1:45:30 PM
911 Authority - El Paso/Teller County
4/29/2021 8:40:13 AM
No new street names requested.
No action for E911.
Thank you.
Justin
4/29/2021 8:40:13 AM
View Falcon Fire Protection District
4/28/2021 12:38:09 PM
4/28/2021 12:38:09 PM