Project Name
City of Fountain Electric Substation Site Development Plan
Description
Great Southwestern Construction, Inc. on Behalf of the City of Fountain Electric Department has submitted a preliminary site development plan for an electric substation, generally located at the southeast corner of Link Road and Marksheffel Road.
Location
Parcels
5533000054 5533000054
Applicant
CIty of Fountain
Gaby Serrano ( gserrano@fountaincolorado.org )
(719) 322-2017
Gaby Serrano ( gserrano@fountaincolorado.org )
(719) 322-2017
File Number
OAR2063
Project Manager
Sophie Kiepe
Status
Closed
Created
12/4/2020 1:13:04 PM

View: Project Documents



Review Comments (2)

Link Agency Comment
PCD Engineering Division
12/16/2020 4:40:06 PM
Review comments provided by:
Jack Patton
jackpatton@elpasoco.com
(719) 520-7951

Site Plan:
No comments. Link Rd is within the City of Fountain and Marksheffel at the property frontage is being annexed to the City of Fountain; therefore, access permit is with the City of Fountain.

Drainage Report:
- Analyze and state in the narrative if the creek where the pond is discharging into meets the definition for suitable oufall location per Engineering Criteria Manual 3.2.4. Since the pond changed the runoff characteristic from sheet flow to a point source, analyze and describe whether or not the conveyance path from the pond outfall to the creek is hydraulically adequate. Offsite improvements is required if the conveyance path is not hydraulically adequate.
12/16/2020 4:40:06 PM
PCD Project Manager
12/8/2020 10:51:06 AM
Planning has no comments at this time. Final comments will be returned pending Engineering and Public Works review. 12/8/2020 10:51:06 AM