PCD Engineering Division
12/16/2020 4:40:06 PM |
Review comments provided by: Jack Patton jackpatton@elpasoco.com (719) 520-7951 Site Plan: No comments. Link Rd is within the City of Fountain and Marksheffel at the property frontage is being annexed to the City of Fountain; therefore, access permit is with the City of Fountain. Drainage Report: - Analyze and state in the narrative if the creek where the pond is discharging into meets the definition for suitable oufall location per Engineering Criteria Manual 3.2.4. Since the pond changed the runoff characteristic from sheet flow to a point source, analyze and describe whether or not the conveyance path from the pond outfall to the creek is hydraulically adequate. Offsite improvements is required if the conveyance path is not hydraulically adequate. |
12/16/2020 4:40:06 PM | |
PCD Project Manager
12/8/2020 10:51:06 AM |
Planning has no comments at this time. Final comments will be returned pending Engineering and Public Works review. | 12/8/2020 10:51:06 AM |