View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
County Attorney - Development Review
1/10/2023 1:41:10 PM |
Signature to escrow agreement attached. | 1/10/2023 1:41:10 PM |
View |
County Attorney - Development Review
12/14/2022 6:37:02 PM |
Proposed edits to escrow agreement attached. | 12/14/2022 6:37:02 PM |
PCD Engineering Division
12/14/2022 1:02:53 PM |
PCD engineering has no comments on the submitted escrow agreement. reviewed by: Daniel Torres danieltorres@elpasoco.com |
12/14/2022 1:02:53 PM | |
View |
County Attorney - Development Review
4/26/2022 3:32:06 PM |
Signature on SIA is attached. | 4/26/2022 3:32:06 PM |
PCD Project Manager
4/21/2022 4:32:03 PM |
Please have the sub sum form revised so it matches the State water form | 4/21/2022 4:32:03 PM | |
PCD Engineering Division
4/21/2022 9:41:59 AM |
Engineering documents have been approved by the ECM Administrator and will be uploaded onto EDARP by the project manager. reviewed by: Daniel Torres danieltorres@elpasoco.com |
4/21/2022 9:41:59 AM | |
EPC Stormwater Review
4/20/2022 5:43:08 PM |
Review 3: EPC Stormwater comments have been resolved on the following documents: - CD - GEC Checklist - SWMP - SWMP Checklist EPC Stormwater has no further comments at this time. Thanks. Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
4/20/2022 5:43:08 PM | |
View |
PCD Engineering Division
3/22/2022 5:13:01 PM |
Construction Drawings Redlines | 3/22/2022 5:13:01 PM |
PCD Engineering Division
3/22/2022 5:12:11 PM |
Please address comments on the following documents: -CDs Please resubmit engineering documents with appropriate stamps/signatures once all PCD and EPC engineering comments have been resolved. Reviewed by: Lupe Packman Review Engineer lupepackman@elpasoco.com |
3/22/2022 5:12:11 PM | |
PCD Project Manager
3/22/2022 1:37:24 PM |
d)Presumptive Use Values. In the absence of data on water use to the contrary or other minimum values established as acceptable by the State Engineer, the following presumptive values will be used to calculate the annual water demand: • Residential inside use 0.26 acre feet per year for single family residences and 0.20 acre feet per year for each occupancy unit in multiple family residences other than single family. A duplex contains 2 occupancy units, a triplex contains 3 occupancy units, etc.; • Residential and commercial landscaping use 0.0566 acre feet per 1,000 square feet of landscaping; • Commercial and industrial inside use 0.1 gallon per day for each square foot of developed space; and • Miscellaneous irrigation (landscaping, golf courses, etc.) use 2.46 acre feet per acre per year. |
3/22/2022 1:37:24 PM | |
View |
PCD Project Manager
3/22/2022 1:40:28 PM |
Subdivsion Summary form does not match State Water form. Please see redline and update. | 3/22/2022 1:40:28 PM |
View |
PCD Project Manager
3/22/2022 1:29:12 PM |
Plat redlines. Minor adjustment to notes. Please add landscape are below the to the easement label because its not an exclusive utility easement on the western boundary, nor along private roads. Applicant has elected to put landscape in that easement. |
3/22/2022 1:29:12 PM |
View |
EPC Stormwater Review
3/21/2022 2:05:51 PM |
SWMP Checklist | 3/21/2022 2:05:51 PM |
View |
EPC Stormwater Review
3/21/2022 2:04:43 PM |
SWMP | 3/21/2022 2:04:43 PM |
View |
EPC Stormwater Review
3/21/2022 2:04:19 PM |
GEC Checklist | 3/21/2022 2:04:19 PM |
EPC Stormwater Review
3/21/2022 2:03:52 PM |
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CD.........................(to be uploaded by PM with PCD comments) - GEC Checklist - SWMP - SWMP Checklist EPC Stormwater comments have been resolved on the following documents: - ESQCP Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
3/21/2022 2:03:52 PM | |
PCD Administrative Notice
2/7/2022 3:24:00 PM |
Adjacent property notifications have been mailed indicating the anticipated decision date and how to provide comment. | 2/7/2022 3:24:00 PM | |
View |
EPC Health Department
1/28/2022 2:08:41 PM |
1/28/2022 2:08:41 PM | |
EPC Stormwater Review
1/11/2022 6:26:03 PM |
Please disregard the line on my previous EDARP comment made on 12/27/2020 about the Drainage Report. **No comments were actually provided on the Drainage Report. So the revised comment should read: Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CD.........................(to be uploaded by PM with PCD comments) - ESQCP...................(to be uploaded by PM with PCD comments) - GEC Checklist - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
1/11/2022 6:26:03 PM | |
View |
PCD Project Manager
1/11/2022 7:15:54 AM |
Adjacent Property Owner Notice Comment | 1/11/2022 7:15:54 AM |
View |
PCD Project Manager
1/11/2022 7:15:17 AM |
ESQCP Comment | 1/11/2022 7:15:17 AM |
View |
PCD Project Manager
1/11/2022 7:14:53 AM |
Construction Drawing redlines | 1/11/2022 7:14:53 AM |
View |
PCD Project Manager
1/11/2022 7:14:25 AM |
Plat Redlines | 1/11/2022 7:14:25 AM |
View |
PCD Project Manager
1/11/2022 7:14:02 AM |
FAE Redlines | 1/11/2022 7:14:02 AM |
View |
PCD Project Manager
1/11/2022 7:13:36 AM |
Letter of Intent comments | 1/11/2022 7:13:36 AM |
PCD Engineering Division
1/10/2022 5:37:11 PM |
Review 1 comments on the following documents will be uploaded by the project manager: -Letter of Intent -FAE -CD -Final Plat -ESQCP reviewed by: Daniel Torres danieltorres@elpasoco.com |
1/10/2022 5:37:11 PM | |
PCD Project Manager
1/6/2022 11:29:03 AM |
Please update the State water form and subdivision summary form to read final plat, not prelim plan. Thanks. Please obtain update water and wastewater commitment letters that state final plat not preliminary plan. |
1/6/2022 11:29:03 AM | |
View |
Upper Black Squirrel Creek GWMD
12/29/2021 12:30:20 PM |
12/29/2021 12:30:20 PM | |
View |
Falcon Fire Protection District
12/29/2021 9:54:59 AM |
12/29/2021 9:54:59 AM | |
Pikes Peak Regional Building Department
12/28/2021 9:30:03 AM |
1. Where is the access easement for lot 6. I see public utility& drainage easements but not an access easement. I will need to know this information to be able to assign an address to this lot. Please contact me directly. amy@pprbd.org 2. Lot 1 address from existing filing is 8090 Meridian Park Drive. I believe this address will be confusing with the convenience store to the east that is addressed 8090 N Meridian Road. New address for lot 1 on Meridian Park Drive is 8084, lot 1 on Bent Grass Market View is 11716, lot 2-11694, lot 3-11672, lot 4-11671, lot 5-11715 & lot 5 on Meridian Park Drive 8060. Addresses are to be placed on the plat. 3. FINAL PLAT: • Enumerations will review the mylar prior to plat for address placement, street names, and title block. • A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. An additional over the phone transaction fee of $3.50 will apply for any credit card payment. • A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org (Please email the Enumerations staff that reviewed your project). *New standard comment*: All mylar reviews will be reviewed via “pdf”. The mylar will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations receiving payment. If you would like an in person review, you will have to make an appointment on our website. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org W: 719-327-2953 |
12/28/2021 9:30:03 AM | |
County Attorney - Development Review
12/27/2021 9:11:26 PM |
No changes to SIA requested. | 12/27/2021 9:11:26 PM | |
View |
EPC Stormwater Review
12/27/2021 3:36:31 PM |
SWMP Checklist | 12/27/2021 3:36:31 PM |
View |
EPC Stormwater Review
12/27/2021 3:36:05 PM |
SWMP | 12/27/2021 3:36:05 PM |
View |
EPC Stormwater Review
12/27/2021 3:35:43 PM |
GEC Checklist | 12/27/2021 3:35:43 PM |
EPC Stormwater Review
12/27/2021 2:47:22 PM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CD.........................(to be uploaded by PM with PCD comments) - Drainage Report...(to be uploaded by PM with PCD comments) - ESQCP...................(to be uploaded by PM with PCD comments) - GEC Checklist - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
12/27/2021 2:47:22 PM | |
Mountain View Electric Association, Inc.
12/27/2021 9:22:21 AM |
Mountain View Electric Association has no objections with the current plan. | 12/27/2021 9:22:21 AM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/22/2021 2:17:23 PM |
For this project, CSU only provides gas service. Nate De Kock (719-668-7858) will be your main point of contact for future questions on gas. I have no comments, recommend approval. ____________________________________________ Corey Masoumi | Engineering Support Coordinator Colorado Springs Utilities | Utilities Development Services Direct (719) 668-1856 | cmasoumi@csu.org |
12/22/2021 2:17:23 PM | |
View |
EPC Environmental Services
12/15/2021 1:43:07 PM |
12/15/2021 1:43:07 PM | |
911 Authority - El Paso/Teller County
12/15/2021 9:32:17 AM |
Street naming has already been approved and reserved under separate correspondence. G. West |
12/15/2021 9:32:17 AM | |
US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
12/13/2021 4:32:25 PM |
The USFWS has no comments regarding the proposed project as it a preliminary plat and no construction is currently proposed. | 12/13/2021 4:32:25 PM | |
View |
Parks Advisory Board
12/10/2021 2:07:36 PM |
See administrative Parks comments attached. Greg |
12/10/2021 2:07:36 PM |
View |
EPC Parks Department
12/10/2021 2:05:51 PM |
See administrative Parks comments attached. Greg |
12/10/2021 2:05:51 PM |
US Postal Service
12/10/2021 8:19:59 AM |
Standard Comment: Please contact Kevin Orlowitz at kevin.s.orlowitz@usps.gov – (Peyton/Falcon) directly to review this development for mail service. To establish mail delivery and kiosk locations an appointment will be required with USPS to determine final locations. Information required for this establishment include: proposed locations, type of mail receptable, final plat with addresses, type of development (residential/commercial) and date of first occupancy. | 12/10/2021 8:19:59 AM | |
Woodmen Road Metro
12/9/2021 8:41:57 AM |
This proposed project is located within the Woodmen Road Metropolitan District boundaries. The District assess’ platting and building permit fees for new development within the District Boundaries, the District also assess’ a mill levy on property within the District Boundaries. The fees for this year are as follows: Platting Fees: Commercial- $1540/ACRE Residential- $385.00/LOT Building Permit Fees: Commercial: Destination/hotel- $1.37/SQUARE FOOT Convenience Commercial- $5.51/SQUARE FOOT All Other Uses- $1.10/SQUARE FOOT Residential- Single Family- $550/UNIT Multi Family- $385/UNIT |
12/9/2021 8:41:57 AM | |
Bent Grass Metro
12/9/2021 8:38:55 AM |
This proposed project is located within the Bent Grass Metropolitan District boundaries. The District assess’ platting and building permit fees for new development within the District Boundaries, the District also assess’ a mill levy on property within the District Boundaries. The fees for this year are as follows: Traffic Signal Fee: $1,000 Platting Fees: Commercial- $5500/ACRE Residential- $5500/ACRE Building Permit Fees: Commercial: Industrial/ Agricultural/ Recreational/ institutional/ medical/ Office/ Retail/ Other non-residential - $1.00/sq. ft. Residential: Single Family - $500/ Unit Multi Family - $350/ Unit |
12/9/2021 8:38:55 AM | |
RBD Floodplain
12/9/2021 8:36:30 AM |
site is not in the SFHA, no comment | 12/9/2021 8:36:30 AM | |
View |
Colorado Division of Water Resources
12/9/2021 7:38:14 AM |
We previously commented on the water supply plan for Bent Grass East Commercial filing No. 3 in our letter dated December 29, 2020. It does not appear that the water supply plan has changed since our prior review therefore our comments provided in that letter apply. | 12/9/2021 7:38:14 AM |