View: Project Documents
Agency | Comment | ||
---|---|---|---|
EPC County Attorney's Office
8/8/2019 1:10:49 PM |
No comments and no further review required unless Planner advises differently. Any easements or other conveyances of property interests will require CAO review and approval. Cole Emmons 8/8/19 | 8/8/2019 1:10:49 PM | |
PCD Engineering Division
8/5/2019 4:48:09 PM |
Engineering documents have been accepted for file. Engineering has no additional comments. |
8/5/2019 4:48:09 PM | |
View |
Colorado Division of Water Resources
7/23/2019 10:51:51 AM |
7/23/2019 10:51:51 AM | |
View |
PCD Engineering Division
7/11/2019 2:28:03 PM |
comments provided by Elizabeth Nijkamp, 719-520-7852. Please submit an ESQCP (attached) Please submit WQ deviations per conservations between Brock Hodgson and Elizabeth Nijkamp. |
7/11/2019 2:28:03 PM |
View |
Parks Advisory Board
6/13/2019 4:42:47 PM |
El Paso County Community Services / Parks Final Comments - Please see attached documents | 6/13/2019 4:42:47 PM |
View |
EPC Parks Department
6/5/2019 1:00:40 PM |
El Paso County Community Services / Parks Final Comments, Review #3 (Please see attached documents) | 6/5/2019 1:00:40 PM |
View |
EPC Environmental Services
6/4/2019 10:53:02 AM |
6/4/2019 10:53:02 AM | |
View |
PCD Engineering Division
6/3/2019 5:30:25 PM |
On the GEC, update the signature blocks to include the names of those signing and update the notes to the current 27 Standard GEC notes (please see attachment) Refer to RBD Floodplain comment regarding the floodplain on site. Please submit all engineering documents with PE Seal and signature for approval. Thank you, Beck Grimm |
6/3/2019 5:30:25 PM |
View |
RBD Floodplain
6/3/2019 9:12:18 AM |
6/3/2019 9:12:18 AM | |
RBD Floodplain
6/3/2019 9:11:51 AM |
as stated on 3/28/19 We can’t regulate to the AECOM study unless it is effective or the BFEs are higher , you can only use better data if it is more conservative than effective. This project has fill in the floodway so a no rise comparing pre and post project conditions based on the current effective Floodplain and Floodway must be submitted. These are NFIP requirements any exemption would need to be coordinated directly with FEMA Region 8. Matt Buddie would be a good place to start; Matthew Buddie FEMA Region VIII Floodplain Management & Community Resilience O: 303.235.4730 M: 303.842.4710 Keith |
6/3/2019 9:11:51 AM | |
View |
EPC Health Department
6/1/2019 4:01:36 PM |
6/1/2019 4:01:36 PM | |
PCD Project Manager
6/1/2019 8:49:42 AM |
Each time you upload a new item, it replaces the old item. We have identified we still need the following items: -construction drawings -site development plan for the proposed structure (property lines, building, setbacks, access, etc.) -O&M -Nuisance Analysis -Traffic Control Plan -Action and Prevention Plan (not uploaded in correct spot) -Access Easement We are discussing with EPC and CDPHE to determine if the letters dated 05/21 satisfy the MS4 requirements. |
6/1/2019 8:49:42 AM | |
View |
EPC Environmental Services
5/22/2019 1:57:07 PM |
5/22/2019 1:57:07 PM | |
PCD Project Manager
5/13/2019 6:32:54 AM |
The previous comments still apply. EPC needs confirmation if you will receive an exemption from the MS4 permit, or if you will fall under our MS4 permit. |
5/13/2019 6:32:54 AM | |
View |
Parks Advisory Board
5/9/2019 1:54:40 PM |
El Paso County Community Services / Parks Final Comments, Review #2 (Please see attached documents) | 5/9/2019 1:54:40 PM |
View |
EPC Parks Department
5/9/2019 1:53:35 PM |
El Paso County Community Services / Parks Final Comments, Review #2 (Please see attached documents) | 5/9/2019 1:53:35 PM |
View |
PCD Engineering Division
5/8/2019 9:44:50 AM |
Please see attached the checklist for the Grading and Erosion Control Plan and Stormwater Management Plan. Items on the lists that are highlighted must be addressed. Highlighted items which are not applicable to this project must be noted in the respective plan accordingly. On the GEC, update the signature blocks to include the names of those signing and update the notes to the current 27 Standard GEC notes as shown in the checklist attachment. The floodplain shown on the GEC does not match the FEMA FIRM Panel Number 08041C0951G, effective 12/7/2018. Review 1 comments still apply to the following documents: -Easement -Natural Features In the drainage report, identify the Four Step Process. This can be found in the Engineering Criteria Manual, Appendix I, Section I.7.2 BMP Selection. |
5/8/2019 9:44:50 AM |
Pikes Peak Regional Building Department
5/7/2019 2:52:05 PM |
Enumerations has no further comment. **Floodplain: Contact Keith Curtis the Floodplain Administrator for regulations to the 100 year floodplain prior to submitting plans to Regional Building Department. keith@pprbd.org or 719-327-2898 |
5/7/2019 2:52:05 PM | |
View |
EPC Environmental Services
4/25/2019 12:25:37 PM |
4/25/2019 12:25:37 PM | |
Fountain
4/9/2019 10:29:38 AM |
Please have applicant contact Brandy Williams, City Engineer at 719-322-2036 to discuss construction in City Rights of way. | 4/9/2019 10:29:38 AM | |
View |
Parks Advisory Board
3/28/2019 9:48:49 AM |
El Paso County Community Services / Parks Final Comments - See attached comments (No PAB Endorsement Necessary) | 3/28/2019 9:48:49 AM |
View |
EPC Parks Department
3/28/2019 9:41:26 AM |
El Paso County Community Services / Parks Final Comments - Please see attached comments (No PAB Endorsement Necessary) | 3/28/2019 9:41:26 AM |
View |
Colorado Department of Public Health and Environment
3/28/2019 7:57:30 AM |
3/28/2019 7:57:30 AM | |
View |
PCD Project Manager
3/28/2019 7:49:36 AM |
Traffic Cont Redlines | 3/28/2019 7:49:36 AM |
View |
PCD Project Manager
3/28/2019 7:49:14 AM |
SWMP Redlines | 3/28/2019 7:49:14 AM |
View |
PCD Project Manager
3/28/2019 7:48:50 AM |
Schedule Redlines | 3/28/2019 7:48:50 AM |
View |
PCD Project Manager
3/28/2019 7:45:54 AM |
PPR Redlines | 3/28/2019 7:45:54 AM |
View |
PCD Project Manager
3/28/2019 7:45:39 AM |
Natural Features Redline | 3/28/2019 7:45:39 AM |
View |
PCD Project Manager
3/28/2019 7:45:20 AM |
Local Infrastructure Redlines | 3/28/2019 7:45:20 AM |
View |
PCD Project Manager
3/28/2019 7:44:51 AM |
GEC Redlines | 3/28/2019 7:44:51 AM |
View |
PCD Project Manager
3/28/2019 7:44:35 AM |
Easement Redlines | 3/28/2019 7:44:35 AM |
View |
PCD Project Manager
3/28/2019 7:44:19 AM |
Drainage Redlines | 3/28/2019 7:44:19 AM |
View |
PCD Project Manager
3/28/2019 7:44:01 AM |
CDPHE Redlines | 3/28/2019 7:44:01 AM |
View |
PCD Project Manager
3/28/2019 7:43:45 AM |
CD Redlines | 3/28/2019 7:43:45 AM |
View |
PCD Project Manager
3/28/2019 7:43:27 AM |
Alternatives Redlines | 3/28/2019 7:43:27 AM |
PCD Engineering Division
3/27/2019 2:13:40 PM |
Engineering comments can be found on the following documents, which will be uploaded by the project manager: -Drainage Plan -GEC -SWMP -Easement -CD -PPR -Natural Features -Traffic |
3/27/2019 2:13:40 PM | |
PCD Project Manager
3/26/2019 3:44:28 PM |
We understand that this is a CERCLA project and that precludes the County from requiring any permits or approvals. We understand that we are acting as a review agency for the project to simply identify any large discrepancies in what is being proposed in comparison to our regulations. 1. Numerous items were not submitted but instead we have been told they will be provided for review at a later date. Please be aware that due to them not being provided we cannot provide you with any substantive comments regarding these items. Please submit the remaining requested items as soon as possible. 2. The proposed project may impact private property. Please coordinate with the private property owners for the work adjacent to and on their property. |
3/26/2019 3:44:28 PM | |
View |
Colorado Department of Public Health and Environment
3/25/2019 4:04:00 PM |
3/25/2019 4:04:00 PM | |
View |
EPC Environmental Services
3/22/2019 12:29:50 PM |
3/22/2019 12:29:50 PM | |
Pikes Peak Regional Building Department
3/21/2019 8:56:26 AM |
1. An address will be assigned to each structure proposed, from Widefield Blvd 2. Are there any existing addresses on site? 3. This property is located in the Floodway & Flood fringe, which are both 100 year floodplain. The buildings will need to be flood proofed to 1 foot above base flood elevation, in this case the BFE is 5670. Contact Keith Curtis for further assistance on how to accomplish this need. Keith@pprbd.org or 719-327-2898. 4. The El Paso County floodplain maps have updated. The new map series is “G”. The new effective date is December 7, 2018. |
3/21/2019 8:56:26 AM |