Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
5/30/2019 5:25:23 PM |
Engineering comments have been resolved. Engineering documents will be uploaded by the project manager once approved by the ECM administrator. | 5/30/2019 5:25:23 PM | |
View |
PCD Project Manager
4/25/2019 3:39:40 PM |
SWMP REDLINES | 4/25/2019 3:39:40 PM |
View |
PCD Project Manager
4/25/2019 3:37:43 PM |
Traffic Memo Redlines | 4/25/2019 3:37:43 PM |
View |
PCD Project Manager
4/25/2019 3:35:40 PM |
SDP Redlines | 4/25/2019 3:35:40 PM |
View |
PCD Project Manager
4/25/2019 3:33:31 PM |
LOI Redlines It appears that the comments were not addressed from review 2. There seems to be a glitch in EDARP; the redline markups do not appear to show in review 2. I have no idea what happened and I apologize for the inconvenience. Please address the comments, stamp sign and submit. |
4/25/2019 3:33:31 PM |
View |
PCD Project Manager
4/25/2019 3:29:02 PM |
FAE Redlines | 4/25/2019 3:29:02 PM |
View |
PCD Project Manager
4/25/2019 3:28:17 PM |
Drainage redlines- | 4/25/2019 3:28:17 PM |
View |
PCD Project Manager
4/25/2019 3:27:25 PM |
GEC Redlines- There was a glitch in the EDARP system and the review 2 redlines did not show. | 4/25/2019 3:27:25 PM |
PCD Engineering Division
4/25/2019 1:05:58 PM |
Review 3: Comments have been provided on the Traffic Impact Study. Engineering comments from review 2 have not been addressed. The following documents will be uploaded by the project manager: -Traffic Impact Study -Letter of Intent -Site Development Plan -Drainage Report -GEC -FAE -SWMP |
4/25/2019 1:05:58 PM | |
Pikes Peak Regional Building Department
3/5/2019 5:39:08 PM |
Enumerations/Floodplain have the following comment: 1. The El Paso County floodplain maps have updated since December 7, 2018. The new map series is āGā. The new effective date is December 7, 2018. Edit Floodplain statement. |
3/5/2019 5:39:08 PM | |
View |
PCD Project Manager
3/5/2019 2:14:04 PM |
Drainage Redlines | 3/5/2019 2:14:04 PM |
View |
PCD Project Manager
3/5/2019 2:11:06 PM |
Site Development Plan Redlines- Please upload all sheets on index listed on sheet 1 for final approval. | 3/5/2019 2:11:06 PM |
View |
PCD Project Manager
3/5/2019 2:09:18 PM |
LOI redlines | 3/5/2019 2:09:18 PM |
View |
PCD Project Manager
3/5/2019 2:08:51 PM |
FAE Revisions Redlines | 3/5/2019 2:08:51 PM |
View |
PCD Project Manager
3/5/2019 2:08:20 PM |
Grading and Erosion Control Plan redlines | 3/5/2019 2:08:20 PM |
View |
PCD Project Manager
3/5/2019 2:07:44 PM |
SWMP Redlines V 1 | 3/5/2019 2:07:44 PM |
View |
PCD Engineering Division
3/4/2019 5:09:55 PM |
See attached GEC checklist | 3/4/2019 5:09:55 PM |
View |
PCD Engineering Division
3/5/2019 11:07:03 AM |
Review 2 comments on the following documents will be uploaded by the Project Manager: -Letter of Intent -Site Development Plan -Drainage Report -Grading and Erosion Control Plan -FAE -SWMP Submit the following documents: -Traffic study |
3/5/2019 11:07:03 AM |
911 Authority - El Paso/Teller County
2/25/2019 9:28:20 AM |
Communications with the Enumeration Department suggest that Pleasant Passages Ln has been changed to Pleasant Port View. This name is acceptable and added to the reserve name list. | 2/25/2019 9:28:20 AM | |
US Postal Service
12/27/2018 12:07:21 PM |
the mailbox location will work for 5 cluster box units/ 16 compartment per unit / standard servicing 78 units. | 12/27/2018 12:07:21 PM | |
View |
EPC Health Department
11/15/2018 10:38:42 AM |
11/15/2018 10:38:42 AM | |
View |
PCD Project Manager
11/8/2018 8:11:53 AM |
MDT Letter | 11/8/2018 8:11:53 AM |
View |
PCD Project Manager
11/8/2018 8:00:33 AM |
Grading & Erosion Control Plan Redlines Review 1 | 11/8/2018 8:00:33 AM |
View |
PCD Project Manager
11/8/2018 8:00:05 AM |
Landscape Redlines Review 1 | 11/8/2018 8:00:05 AM |
View |
PCD Project Manager
11/8/2018 7:59:46 AM |
LOI Redlines Review 1 | 11/8/2018 7:59:46 AM |
View |
PCD Project Manager
11/8/2018 7:59:26 AM |
Site Dev Plan Redlines Review 1 | 11/8/2018 7:59:26 AM |
View |
PCD Project Manager
11/8/2018 7:58:55 AM |
Floor Plans Redlines Review 1 | 11/8/2018 7:58:55 AM |
View |
PCD Project Manager
11/8/2018 7:58:30 AM |
FAE Redlines Review 1 | 11/8/2018 7:58:30 AM |
View |
PCD Project Manager
11/8/2018 7:57:48 AM |
Drainage Report Redlines review 1 | 11/8/2018 7:57:48 AM |
PCD Engineering Division
11/7/2018 5:48:58 PM |
Review 1 comments on the following documents will be uploaded by the project manager -Drainage Report -Site Development Plan -GEC -FAE -LOI Submit the following documents: -SWMP |
11/7/2018 5:48:58 PM | |
Pikes Peak Regional Building Department
11/7/2018 1:19:18 PM |
Enumerations has the following comments: 1. Have the internal street names been approved? If so, Enumerations needs an email from El Paso/Teller County 9-1-1, verifying they are approved. 2. It is unclear where the front doors are for buildings 9, 10, 19 & 20. Please clarify. 3. The platted addresses will be removed from this project with the replat. New addresses will be assigned. 4. What is proposed from existing Cold Harbor View to proposed. Not sure what the symbol means. Is Cold Harbor View being blocked off from the new DP. 5. Standard DP comments: ASSIGNMENT FOR TRACT AND LOT ADDRESSING PLACE, (XXXX) WHERE THEY INTEND TO BE UTILIZED. LOT PLACEMENT TO BE FRONT DOOR. CONTACT ENUMERATIONS DEPARTMENT FOR ADDRESSING. AMY@PPRBD.ORG Floodplain has no comment. |
11/7/2018 1:19:18 PM | |
Mountain View Electric Association, Inc.
10/25/2018 2:44:43 PM |
This townhome project in not within the Mountain View Electric service area. Cathy Hansen-Lee Mountain View Electric Assoc., Inc. |
10/25/2018 2:44:43 PM | |
View |
911 Authority - El Paso/Teller County
10/25/2018 11:47:03 AM |
See attached for comments. Note: Pleasant Passage LN- Not Acceptable name, violates maximum of 14 letter count. Will need a new name to be submitted for approval. |
10/25/2018 11:47:03 AM |