Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
10/30/2018 12:20:19 PM |
Documents have been approved. | 10/30/2018 12:20:19 PM | |
PCD Project Manager
10/22/2018 12:46:35 PM |
Please address the minor drainage comments for both the north and south reports. Please upload revised signed and stamped versions. if you have questions, please contact Jeff Rice. | 10/22/2018 12:46:35 PM | |
View |
PCD Engineering Division
10/22/2018 12:39:49 PM |
(South PDR redlines) | 10/22/2018 12:39:49 PM |
View |
PCD Engineering Division
10/22/2018 12:39:24 PM |
(North PDR redlines) | 10/22/2018 12:39:24 PM |
View |
PCD Engineering Division
10/22/2018 12:38:54 PM |
See minor redline (north); submit signed PDRs. Reference comment letter for additional details required in FDRs. | 10/22/2018 12:38:54 PM |
View |
PCD Engineering Division
10/10/2018 2:31:57 PM |
(PDR-North redlines) | 10/10/2018 2:31:57 PM |
View |
PCD Engineering Division
10/10/2018 2:30:34 PM |
(PDR-North redlines summary) | 10/10/2018 2:30:34 PM |
View |
PCD Engineering Division
10/10/2018 2:29:33 PM |
(PDR-South redlines) | 10/10/2018 2:29:33 PM |
View |
PCD Engineering Division
10/10/2018 2:29:01 PM |
(PDR-South redlines summary) | 10/10/2018 2:29:01 PM |
View |
PCD Engineering Division
10/10/2018 2:28:04 PM |
(Preliminary Plan redlines) | 10/10/2018 2:28:04 PM |
View |
PCD Engineering Division
10/10/2018 2:27:02 PM |
See comment letter and redlines. | 10/10/2018 2:27:02 PM |
PCD Project Manager
9/17/2018 7:56:24 AM |
Please confirm with future and current owners that no pre-development site grading is requested. If so additional changes will be necessary to the LOI, FAE, and pre-site grading form. Grading plans were submitted with the preliminary plan; Jeff rice has provided comments on them attached tot he preliminary plan. Please work to upload the necessary docs prior to the PC hearing scheduled on October 2, 2018. | 9/17/2018 7:56:24 AM | |
View |
PCD Engineering Division
9/14/2018 3:37:48 PM |
(PDR north redlines) | 9/14/2018 3:37:48 PM |
View |
PCD Engineering Division
9/14/2018 3:37:11 PM |
(PDR south redlines) | 9/14/2018 3:37:11 PM |
View |
PCD Engineering Division
9/14/2018 3:36:41 PM |
(Preliminary Plan redlines) | 9/14/2018 3:36:41 PM |
View |
PCD Engineering Division
9/14/2018 3:32:26 PM |
See redlines and comment letter. Please provide a response to comment letter comments. | 9/14/2018 3:32:26 PM |
Black Forest Land Use Committee
8/15/2018 7:12:43 PM |
The Black Forest Land Use Committee has no further comments beyond our 5-15-18 submission for this project. | 8/15/2018 7:12:43 PM | |
View |
Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
8/8/2018 4:08:52 PM |
8/8/2018 4:08:52 PM | |
View |
PCD Engineering Division
8/2/2018 5:27:58 PM |
See comment letter and redlines. | 8/2/2018 5:27:58 PM |
View |
PCD Project Manager
8/2/2018 5:07:02 PM |
MDT Letter Review 2 | 8/2/2018 5:07:02 PM |
View |
PCD Project Manager
8/2/2018 4:46:21 PM |
Drainage Report Redlines review 2 | 8/2/2018 4:46:21 PM |
View |
PCD Project Manager
8/2/2018 4:45:38 PM |
Preliminary Plan Redlines Review 2 | 8/2/2018 4:45:38 PM |
PCD Project Manager
7/25/2018 3:18:34 PM |
Engineering will provide comments upon completion of their review. Those redlines and comments will be uploaded at that time. | 7/25/2018 3:18:34 PM | |
View |
PCD Project Manager
7/25/2018 3:16:13 PM |
Preliminary Plan Review 2- Planning only redlines | 7/25/2018 3:16:13 PM |
View |
PCD Project Manager
7/25/2018 3:15:08 PM |
LOI Version 2 Planning only comments | 7/25/2018 3:15:08 PM |
View |
Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
7/24/2018 8:20:29 PM |
7/24/2018 8:20:29 PM | |
View |
Black Forest Land Use Committee
7/23/2018 7:28:37 PM |
7/23/2018 7:28:37 PM | |
Pikes Peak Regional Building Department
7/23/2018 4:17:58 PM |
Regarding a request for approval of a preliminary plan for The Retreat at TimberRidge, Enumerations has the following comments: 1. The street name changes requested by E911 have been put on the plan with the exception of the southern east/west segment of Owl Perch does not show a different street name as was requested by Justin at E911. Has this request been cancelled? 2. Aspen Valley Rd., Elk Antler Dr., and Bison Valley Dr. all show that they continue beyond the scope of this plan. In order to assign correct and consistent addressing for these streets, Enumerations requests a PDF or large format paper copy of the proposed developments that these streets continue into. We also request a PDF or large format paper copy of this development for addressing purposes. Floodplain has no additional comments Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
7/23/2018 4:17:58 PM | |
View |
911 Authority - El Paso/Teller County
7/19/2018 10:55:35 AM |
See attached File | 7/19/2018 10:55:35 AM |
EPC Sheriff's Department
5/21/2018 10:50:07 AM |
no comment | 5/21/2018 10:50:07 AM | |
View |
PCD Project Manager
5/17/2018 8:20:31 AM |
MDT Letter Review 1 | 5/17/2018 8:20:31 AM |
View |
PCD Project Manager
5/17/2018 8:10:23 AM |
Drainage Report V_1 red lines | 5/17/2018 8:10:23 AM |
View |
PCD Project Manager
5/17/2018 8:09:48 AM |
Traffic Study red lines V_1 | 5/17/2018 8:09:48 AM |
View |
PCD Project Manager
5/17/2018 7:59:00 AM |
Preliminary Plan red lines V_1 | 5/17/2018 7:59:00 AM |
View |
PCD Project Manager
5/17/2018 7:57:14 AM |
letter of intent red lines V-1 | 5/17/2018 7:57:14 AM |
View |
PCD Engineering Division
5/16/2018 8:51:31 PM |
See comment letter, approved and denied deviation requests and redlines. | 5/16/2018 8:51:31 PM |
View |
Black Forest Land Use Committee
5/15/2018 7:37:15 AM |
5/15/2018 7:37:15 AM | |
PCD Project Manager
5/14/2018 5:28:24 PM |
Regarding water and wastewater: The commitment letters did not state how many lots the District was committing to. It did not state the use as single-family. It should so the estimation of water committed can be identified. The whole Decoto property (36 acres) was included in the water decree but only a portion is being preliminary planned. How will the remaining land be served? Would you like to request deferment of water sufficiency to the final plat? The waste water commitment should also state the number of lots and use to be served. |
5/14/2018 5:28:24 PM | |
View |
EPC Parks Department
5/14/2018 2:42:07 PM |
El Paso County Community Services/Parks Final Comments (PAB Endorsed 05/09/2018) | 5/14/2018 2:42:07 PM |
View |
Parks Advisory Board
5/14/2018 2:38:26 PM |
El Paso County Community Services/Parks Final Comments (PAB Endorsed 05/09/2018) | 5/14/2018 2:38:26 PM |
Colorado Geological Survey
5/10/2018 3:02:58 PM |
5/10/2018: Sheet 2 of the preliminary plan (N.E.S., 4/11/2018) shows an "Existing Geologic Hazard Legend," but hazards are only identified within proposed lots 1 through 12. If the current preliminary plan application is for all 203 proposed Retreat at Timber Ridge lots, then the mapped hazards as shown on Figure 7 of Entech's 12/1/2017 revised Soil, Geology, Geologic Hazard, and Wastewater Study, and the areas of observed shallow groundwater identified in Entech's test pits 3 and 5 (proposed lots 18-23) and boring 2 (lots 77-78, at a minimum) need to be clearly identified. | 5/10/2018 3:02:58 PM | |
View |
Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
5/9/2018 10:01:21 PM |
5/9/2018 10:01:21 PM | |
View |
EPC Environmental Services
5/9/2018 11:18:58 AM |
5/9/2018 11:18:58 AM | |
Pikes Peak Regional Building Department
5/9/2018 8:55:57 AM |
Regarding a request for approval of a preliminary plan for Retreat at TimerRidge, Enumerations has the following comments: 1. The road names for this development have been approved, but the suffixes need to be updated per the comments from Justin Annan at El Paso/Teller 911. 2. Please provide a large format copy of the entire development for addressing. We would prefer to address the entire development at one time rather than as each phase is developed in order to ensure consistency throughout the development. Indicate with (XXXX) the locations of all lots and tracts which will require an address. 3. Enumerations will have more comments as each phase is submitted for approval of the final plat. Floodplain has the following comments: 1. By placing the floodplain areas of this development into Tracts F and G, it appears that Section 313 of the Regional Building Code has been complied with. Contact Floodplain Administrator Keith Curtis (keith@pprbd.org, 719-327-2898) with any questions or concerns regarding compliance with floodplain code. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
5/9/2018 8:55:57 AM | |
El Paso County Conservation Dist
5/1/2018 3:26:08 PM |
The El Paso County Conservation District board of supervisors have no comments at this time. | 5/1/2018 3:26:08 PM | |
View |
Mountain View Electric Association, Inc.
5/1/2018 2:11:30 PM |
5/1/2018 2:11:30 PM | |
911 Authority - El Paso/Teller County
5/1/2018 1:56:53 PM |
Hello Comments for 911 as follows: All street names have been previously approved. Several corrections to suffixes are requested. The small segment of Owl Perch Loop at the southern end should have a unique road name where it takes the 90 degree turn (from lots 153 – 156) Nature Refuge Road – Acceptable - Due to continuity, suffix should be Court, Place, Way, Terrace, Lane, Loop, Trail, or Path Hawks Hill Court – Acceptable - Due to continuity, suffix should be Street or Drive Aspen Valley Road – Acceptable – Previously reserved as “Parkway,” but “Road” better conforms to code. Falcon Nest Court – Acceptable Antelope Ravine Drive – Acceptable - Previously reserved as "Avenue," but "Drive" better conforms to code. Elk Antler Lane – Acceptable - Due to continuity, suffix should be Street or Drive Bison Valley Trail – Acceptable - Due to continuity, suffix should be Street or Drive Rabbit Tail Place – Acceptable Owl Perch Loop – Acceptable - Due to continuity, suffix should be Street or Drive Thank you Justin |
5/1/2018 1:56:53 PM | |
View |
EPC Health Department
4/30/2018 11:34:01 AM |
4/30/2018 11:34:01 AM | |
Falcon Fire Protection District
4/26/2018 1:28:07 PM |
This project is within the boundaries of the Black Forest Fie District. As such no review was completed by the Falcon Fire District. | 4/26/2018 1:28:07 PM | |
View |
Colorado State Forest Service
4/24/2018 11:05:26 AM |
4/24/2018 11:05:26 AM |