Project Review Comments

Back to List


Project Name
Les Schwab Tire Center, Site Development Plan
Description
Site Development Plan to allow vehicle repair in the CR zoning district
Location
Lots 3-4, Meridian Crossing Filing No. 1
Parcels
5312106009 5312106009 5312106010 5312106010
Applicant
Galloway & Company, Inc.
Project Manager Aaron McLean ( AARONMCLEAN@GALLOWAYUS.COM )
(303) 770-8884 x2216
Project Manager Aaron McLean ( AARONMCLEAN@GALLOWAYUS.COM )
(303) 770-8884 x2216
EA Number
EA182
File Number
PPR1816
Project Manager
Nina Ruiz
Status
Closed
Created
1/25/2018 8:08:21 AM

View: Project Documents



Review Comments (50)

Link Agency Comment
PCD Engineering Division
8/4/2020 4:58:58 PM
Comments have been provided by:
Jack Patton
(719) 520-7951
jackpatton@elpasoco.com

Due to the changes in the Engineering Criteria Manual (July 2019) new checklists for the SWMP and the GEC plan are needed. Please confirm all items on the checklists are on the documents, sign and return the two checklists.

All other Engineering comments have been addressed.

The Project Manager will supply two slots for the submittal of the following:
GEC checklist
SWMP checklist
8/4/2020 4:58:58 PM
View PCD Engineering Division
8/4/2020 4:58:35 PM
SWMP Checklist 7.2019 8/4/2020 4:58:35 PM
View PCD Engineering Division
8/4/2020 2:39:02 PM
GEC Checklist 7/2019 8/4/2020 2:39:02 PM
PCD Project Manager
7/30/2020 5:12:04 PM
all planning comments have been resolved 7/30/2020 5:12:04 PM
View PCD Project Manager
8/29/2019 11:31:56 AM
SDP_V5 Redlines attached 8/29/2019 11:31:56 AM
View PCD Project Manager
8/29/2019 11:31:33 AM
FAE_V5 Redlines attached 8/29/2019 11:31:33 AM
PCD Project Manager
8/29/2019 11:31:02 AM
No comments from Planning, See Engineer comments in regards to Site Plan and FAE.
Has applicant resolved comments with Falcon Highlands Metro?
8/29/2019 11:31:02 AM
PCD Engineering Division
8/28/2019 7:13:39 PM
comments provided by Elizabeth Nijkamp, 719-520-7852.

Add missing information to note 26 on the GEC plan.

comments have been provided on the following documents in the form of redlines and will be uploaded by the project manager:

Site Development plan.
Financial assurance document
8/28/2019 7:13:39 PM
Falcon Fire Protection District
4/11/2019 3:34:46 PM
Falcon Fire has no new comments on this project. 4/11/2019 3:34:46 PM
PCD Project Manager
4/5/2019 9:07:56 AM
Planning Comments Resolved.

Per Engineer comments, remaining comments are minor, suggested to make changes and submit final versions with required signatures.

Before construction can begin the applicant will have to contact Paul Wiggs with inspections to set up the pre-construction meeting. Any collateral and the inspection fees $1737 will be due at this meeting.

Reminder that no Certificate of Occupancy can be released until all standards of the SDP are met, to include landscaping and parking.
4/5/2019 9:07:56 AM
View PCD Project Manager
4/5/2019 12:26:26 PM
SWMP_V4 4/5/2019 12:26:26 PM
View PCD Project Manager
4/5/2019 9:04:40 AM
SDP_V4 4/5/2019 9:04:40 AM
View PCD Project Manager
4/5/2019 9:04:16 AM
FAE_V4 4/5/2019 9:04:16 AM
View PCD Project Manager
4/5/2019 9:04:01 AM
Drainage Report_V4 4/5/2019 9:04:01 AM
PCD Engineering Division
4/3/2019 3:01:02 PM
Engineering comments have been resolved on the following documents:
-Letter of Intent
-Grading and Erosion Control Plan

Engineering comments can be found on the following documents, which will be uploaded by the project manager:
-Site Development Plan
-Financial Assurance
-Stormwater Management Plan
-Drainage Letter

It appears that the remaining comments are minor. Submit engineering documents with all signatures for approval.

Be sure that all documents include the project PCD file number. On the Grading and Erosion Control Plan, include the soils report information under Note #26 for the Standard GEC Plan Notes.
4/3/2019 3:01:02 PM
View PCD Project Manager
9/6/2018 11:41:13 AM
SWMP_V3 9/6/2018 11:41:13 AM
View PCD Project Manager
9/6/2018 11:40:56 AM
SDP_V3 9/6/2018 11:40:56 AM
View PCD Project Manager
9/6/2018 11:40:38 AM
LOI_V3 9/6/2018 11:40:38 AM
View PCD Project Manager
9/6/2018 11:40:22 AM
Landscape_V3 9/6/2018 11:40:22 AM
View PCD Project Manager
9/6/2018 11:40:05 AM
Grading & Erosion Control_V3 9/6/2018 11:40:05 AM
View PCD Project Manager
9/6/2018 11:39:29 AM
Financial Assurance_V3 9/6/2018 11:39:29 AM
View PCD Project Manager
9/6/2018 11:39:11 AM
Drainage Report_V3 9/6/2018 11:39:11 AM
View PCD Project Manager
9/6/2018 11:38:47 AM
MDT_V3 9/6/2018 11:38:47 AM
View PCD Engineering Division
9/5/2018 6:18:18 PM
Engineering comments have been provided on the following documents, which will be uploaded by the project manager:
-FAE
-SWMP
-LOI
-GEC
-Drainage Report
-Site Development Plan

Please see the attached GEC checklist.
9/5/2018 6:18:18 PM
EPC County Attorney's Office
8/15/2018 3:10:52 PM
No comments from County Attorney's Office at this time. 8/15/2018 3:10:52 PM
View PCD Project Manager
7/12/2018 11:54:20 AM
Traffic_V2 7/12/2018 11:54:20 AM
View PCD Project Manager
7/12/2018 11:53:55 AM
SWMP_V1 7/12/2018 11:53:55 AM
View PCD Project Manager
7/12/2018 11:53:30 AM
SDP_V2 7/12/2018 11:53:30 AM
View PCD Project Manager
7/12/2018 11:52:02 AM
Landscape Plan_V2 7/12/2018 11:52:02 AM
View PCD Project Manager
7/12/2018 11:50:58 AM
Grading & Erosion Control_V2 7/12/2018 11:50:58 AM
View PCD Project Manager
7/12/2018 11:23:35 AM
Financial Assurance_V2 7/12/2018 11:23:35 AM
View PCD Project Manager
7/12/2018 11:22:18 AM
Drainage Report_V2 7/12/2018 11:22:18 AM
View PCD Project Manager
7/12/2018 11:21:56 AM
MDT_V2 7/12/2018 11:21:56 AM
View PCD Engineering Division
7/10/2018 4:36:14 PM
The checklist for the GEC plan has been attached. Please address all outstanding issues. 7/10/2018 4:36:14 PM
PCD Engineering Division
7/10/2018 4:35:11 PM
Comments have been provided in the form of red lines and will be uploaded by the project manager.

A meeting has been set up to clarify comments.
7/10/2018 4:35:11 PM
Falcon Fire Protection District
5/28/2018 9:39:09 AM
working with Developer on site plan. 5/28/2018 9:39:09 AM
View PCD Project Manager
5/14/2018 8:54:03 AM
Traffic Memo_V1 5/14/2018 8:54:03 AM
View PCD Project Manager
5/7/2018 7:58:27 AM
MDT_V1 5/7/2018 7:58:27 AM
View PCD Project Manager
5/7/2018 7:58:01 AM
SDP_V1 5/7/2018 7:58:01 AM
View PCD Project Manager
5/7/2018 7:56:50 AM
Landscape Plans_V1 5/7/2018 7:56:50 AM
View PCD Project Manager
5/7/2018 7:56:24 AM
Grading and Erosion Control_V1 5/7/2018 7:56:24 AM
View PCD Project Manager
5/7/2018 7:56:01 AM
Financial Assurance_V1 5/7/2018 7:56:01 AM
View PCD Project Manager
5/7/2018 7:55:42 AM
ESQCP_V1 5/7/2018 7:55:42 AM
View PCD Project Manager
5/7/2018 7:55:21 AM
Elevations_V1 5/7/2018 7:55:21 AM
View PCD Project Manager
5/7/2018 7:54:29 AM
Drainage Report_V1 5/7/2018 7:54:29 AM
View PCD Engineering Division
5/4/2018 1:29:09 PM
SWMP checklist 5/4/2018 1:29:09 PM
View PCD Engineering Division
5/4/2018 1:28:19 PM
Comments in the form of redlines will be uploaded by the PM. Please find attached checklists for the GEC plan and the SWMP. 5/4/2018 1:28:19 PM
Pikes Peak Regional Building Department
5/3/2018 8:52:25 AM
Enumerations/Floodplain has no comment. 5/3/2018 8:52:25 AM
View EPC Health Department
4/17/2018 10:08:58 PM
4/17/2018 10:08:58 PM
Mountain View Electric Association, Inc.
4/17/2018 12:29:42 PM
See response VR 184 4/17/2018 12:29:42 PM