Project Review Comments

Back to List


Project Name
CBP 9
Description
Warehouse with accessory outside storage for empty conex containers.
Location
1405 Selix Grove
Parcels
5408102013 5408102013
Applicant
Hammers Construction
Lisa Peterson ( lpeterson@hammersconstruction.com )
(719) 570-1599 x105
Lisa Peterson ( lpeterson@hammersconstruction.com )
(719) 570-1599 x105
EA Number
EA17209
File Number
PPR187
Project Manager
Len Kendall
Status
Closed
Created
1/24/2018 3:35:46 PM

View: Project Documents



Review Comments (23)

Link Agency Comment
Central CO Conservation District
4/2/2018 8:35:31 AM
The board of Directors of the Central Colorado Conservation District have no comments at this time. 4/2/2018 8:35:31 AM
View PCD Engineering Division
3/28/2018 3:33:50 PM
See the attached SWMP checklist for items that need to be addressed.



Comments resolved on the following documents:
- Drainage Report
- Financial Assurance Estimate
- Grading and Erosion Control Plan
3/28/2018 3:33:50 PM
View PCD Project Manager
3/28/2018 12:55:09 PM
Letter of Intent Redline Summary 3/28/2018 12:55:09 PM
PCD Project Manager
3/28/2018 12:47:42 PM
Site Development Plan Redlines coming when Engineering has finished review.

If fence is going to be 8 feet tall, it is considered an accessory structure, requires a building permit and is required to meet setbacks. Setbacks are 25 feet when facing a street and 0 feet when interior and adjacent to a parcel with the same zoning district.

Mark an ADA route from the handicap parking space to the structure.
3/28/2018 12:47:42 PM
EPC County Attorney's Office
3/16/2018 2:04:59 PM
No changes to Detention Maintenance Agreement. 3/16/2018 2:04:59 PM
View PCD Project Manager
3/5/2018 3:07:32 PM
Grading and Erosion Control Plan Redline Summary 3/5/2018 3:07:32 PM
View PCD Project Manager
3/5/2018 3:05:28 PM
Financial Assurance Redline Summary 3/5/2018 3:05:28 PM
View PCD Project Manager
3/5/2018 3:04:19 PM
Drainage Report Redline Summary 3/5/2018 3:04:19 PM
PCD Engineering Division
3/5/2018 1:32:31 PM
1. Review 1 redline comments on the following documents will be uploaded by the Project Manager:
- Grading and Erosion Control Plan
- Financial Assurance Estimate
- Drainage Report

2. Submit a SWMP report.

3. Per SB 15-212, since the SFB is Water Quality only the following documents are not required: SDI Worksheet and EPC MS4 Post Construction Form.
3/5/2018 1:32:31 PM
View PCD Project Manager
3/5/2018 3:11:01 PM
Site Development Plan redlined document 3/5/2018 3:11:01 PM
View PCD Project Manager
3/2/2018 10:59:42 AM
Letter of Intent redlined document 3/2/2018 10:59:42 AM
View PCD Project Manager
3/2/2018 10:58:37 AM
Landscape Plan Redlined document 3/2/2018 10:58:37 AM
PCD Project Manager
3/2/2018 10:23:54 AM
The redlines do not currently include engineering comments. Engineering comments will be coming. 3/2/2018 10:23:54 AM
PCD Project Manager
3/2/2018 10:09:25 AM
Site Development Plan must include this note.

The parties responsible for this plan have familiarized themselves with all current accessibility criteria and specifications and the proposed plan reflects all site elements required by the applicable ADA design standards and guidelines as published by the United States Department of Justice. Approval of this plan by El Paso County does not assure compliance with the ADA or any regulations or guidelines enacted or promulgated under or with respect to such laws.
3/2/2018 10:09:25 AM
Pikes Peak Regional Building Department
3/1/2018 3:59:34 PM
Enumerations has no comments. 3/1/2018 3:59:34 PM
View Colorado Springs Airport Advisory Commission
3/1/2018 8:08:58 AM
3/1/2018 8:08:58 AM
View EPC Health Department
2/27/2018 11:47:37 AM
2/27/2018 11:47:37 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/26/2018 10:14:02 AM
1. If the customer plans to tie into Gas, Electric, or wastewater I will need to have a Preliminary Utility and Public Facilities Plan. 2/26/2018 10:14:02 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/26/2018 10:12:22 AM
I need a Preliminary Utility and Public Facilities Plan I need to know what they plan to do with wastewater water gas and electric. We do not have public CSU water in this area. Please give me a call to discuss Al 719-668-8769 2/26/2018 10:12:22 AM
View Cimarron Hills Fire
2/11/2018 7:37:19 PM
See attached Fire Comments. 2/11/2018 7:37:19 PM
Central Marksheffel Metro
2/8/2018 2:12:08 PM
In response to the proposed project this parcel will be subject to the Central Marksheffel Metropolitan Commercial District fee’s and mill levies.
At time of Building Permit the following fee is due $1.50/square foot of building.

Made Payable to Central Marksheffel Metro District

5000 sq ft x $1.50 = $7500.00

Tax Id 54081-02-013 Lot 9
2/8/2018 2:12:08 PM
View EPC County Attorney's Office
2/8/2018 12:42:53 PM
Please see changes to Detention Pond Maintenance Agreement. 2/8/2018 12:42:53 PM
Cherokee Metro Dist
2/8/2018 11:56:25 AM
Developer is aware of the separate development review process that they must go through with the Cherokee Metropolitan District. Jonathon Smith 2/8/2018 11:56:25 AM