View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
EPC Health Department
12/12/2017 6:11:15 PM |
12/12/2017 6:11:15 PM | |
View |
PCD Project Manager
12/7/2017 9:43:49 AM |
Multi-Discipline Comment Letter | 12/7/2017 9:43:49 AM |
View |
PCD Project Manager
12/7/2017 9:41:11 AM |
Letter of Intent Redline | 12/7/2017 9:41:11 AM |
Black Forest Land Use Committee
12/6/2017 6:20:55 PM |
What wells are on the property and what is the anticipated water need to irrigate one acre of grapevines? That should have been in the Letter of Intent. | 12/6/2017 6:20:55 PM | |
PCD Engineering Division
12/5/2017 4:41:42 PM |
In the 2nd from the last paragraph in the letter of intent, elaborate on the traffic. What is the expected number of visitors per day? No traffic study is required if the vehicle trip generation is less than 100 trips per day. If the expected average daily vehicles is 100 or more, then a transportation memorandum prepared by a licensed professional engineer is required. |
12/5/2017 4:41:42 PM | |
PCD Engineering Division
12/1/2017 11:05:42 AM |
Update the site plan to show the first 50 ft of both driveway access to be paved. | 12/1/2017 11:05:42 AM | |
PCD Project Manager
12/7/2017 8:54:51 AM |
The vicinity map should be resubmitted. It currently shows that your property goes all the way to Naylor Drive, and parcel maps show there are two properties that are in between Naylor Drive and your property. A map showing surrounding parcels and roads will be necessary. Slight edit to the Letter of Intent. (see redline document) |
12/7/2017 8:54:51 AM | |
Pikes Peak Regional Building Department
11/28/2017 3:45:18 PM |
Regarding a request for a special use at 11340 Black Forest Rd., Enumerations has the following comments: 1. Any structure associated with the commercial use of this property must have a separate address. Currently, all of the buildings on the parcel share the same address. When any building plans for renovation of an existing building for the commercial use of this property are submitted for review/permit, an address will be assigned to the building. Or, the applicant may contact Enumerations ahead of time to establish these addresses to use for plan submittal. 2. If, in the future as the letter of intent states, the existing residence is converted for commercial use and a new residence is constructed, the existing residence will retain the use of the 11340 Black Forest Rd. address. The new residence will be assigned a new address. Floodplain has no comment or objection to this submittal. BRENT JOHNSON Enumerations Plans Examiner (719) 327-2888 www.pprbd.org |
11/28/2017 3:45:18 PM | |
View |
Mountain View Electric Association, Inc.
11/22/2017 1:54:57 PM |
11/22/2017 1:54:57 PM |