Project Review Comments

Back to List


Project Name
Kum & Go Site Development Plan
Description
Site Development plan for a Kum & Go gas station
Location
South of Platte Ave at the Southeast corner of Space Village Ave and Peterson BLVD
Parcels
5417000022 5417000022
Applicant
Olsson Associates
Juel Rae ( jrae@olssonassociates.com )
(970) 461-7733
Juel Rae ( jrae@olssonassociates.com )
(970) 461-7733
EA Number
EA-17-116
File Number
PPR17041
Project Manager
Gabe Sevigny
Status
Closed
Created
7/31/2017 7:27:01 AM

View: Project Documents



Review Comments (28)

Link Agency Comment
EPC County Attorney's Office
11/22/2017 10:06:35 AM
Pursuant to email discussions, please route to County Attorney's Office again when updated detention agreement has been submitted. 11/22/2017 10:06:35 AM
View Cimarron Hills Fire
10/29/2017 11:03:06 AM
Please see attached Fire Department review letter. 10/29/2017 11:03:06 AM
PCD Project Manager
10/26/2017 9:07:09 AM
Financial Assurance Form 10/26/2017 9:07:09 AM
View PCD Project Manager
10/26/2017 9:05:55 AM
MS4 Post Construction Form 10/26/2017 9:05:55 AM
View PCD Project Manager
10/26/2017 9:05:05 AM
MDT Letter 10/26/2017 9:05:05 AM
View PCD Project Manager
10/26/2017 9:04:22 AM
Site Development Plan 10/26/2017 9:04:22 AM
View PCD Project Manager
10/26/2017 9:04:04 AM
Sign Plan 10/26/2017 9:04:04 AM
View PCD Project Manager
10/26/2017 9:03:47 AM
Landscape Plan 10/26/2017 9:03:47 AM
View PCD Project Manager
10/26/2017 9:03:18 AM
Grand and Erosion Control 10/26/2017 9:03:18 AM
View PCD Project Manager
10/26/2017 9:02:50 AM
Drainage Report- Final 10/26/2017 9:02:50 AM
Peterson AFB
10/23/2017 2:12:48 PM
The primary concern at this point is the condition of the existing 24" culvert
under Peterson Blvd. I think someone should check that it is OK. Things I
would check:

1. Obstructions (e.g. cave-in, vegetation, dead bodies, live bodies, etc.)
2. Sump conditions due to failure of the pipe bedding.
3. Breaks in the pipe.
4. Slope of pipe adequate to handle the design flows.
5. Discharge end of pipe causing erosion (no flaired end or riprap to
dissipate energy).

Based on the drawing, it appears that this line goes to the triangle island northeast of the Platte off ramp, not positive though.

We do not want any flow or discharge onto Peterson AFB property or easements
10/23/2017 2:12:48 PM
View PCD Project Manager
10/23/2017 9:08:49 AM
Site Development Plan Redlines 10/23/2017 9:08:49 AM
View PCD Project Manager
10/23/2017 9:08:28 AM
Sign Plan Redlines 10/23/2017 9:08:28 AM
View PCD Project Manager
10/23/2017 9:08:07 AM
Landscape Plans Redlines 10/23/2017 9:08:07 AM
View PCD Project Manager
10/23/2017 9:07:33 AM
Grading & Erosion Control Redlines 10/23/2017 9:07:33 AM
View PCD Project Manager
10/23/2017 9:06:51 AM
Drainage Report Redlines 10/23/2017 9:06:51 AM
View Colorado Springs Airport Advisory Commission
10/23/2017 8:50:47 AM
10/23/2017 8:50:47 AM
View EPC Health Department
10/17/2017 4:10:11 PM
10/17/2017 4:10:11 PM
Pikes Peak Regional Building Department
10/16/2017 2:08:05 PM
1. Not sure where the address of 6809 Space Village Ave come from; it is written on the site plan end tab but this address is not available. For consistency sake with the rest of the surrounding development I believe it would be best to assign a Space Village Ave address to the Kum & Go store. Please utilize 6807 Space Village Ave for the store and 6805 Space Village Ave for the gas canopy.

2. Is the only access to this site from behind the convenience store from Space Village Ave? I am not seeing any other curb cut for access from Peterson Blvd. Is the Kum & Go store going to utilize the existing curb cut for the stripe building to the south?
3. Please see notes form last submittal regarded Peterson Blvd & Peterson Road.
4. 4. If the Kum & Go Store is to plat with the existing surrounding buildings, please indicate the addresses in use on site for those buildings for the plat. Please clarify what is to be included in the plat.
10/16/2017 2:08:05 PM
PCD Engineering Division
10/12/2017 3:22:27 PM
Redline comments to the following documents will be uploaded by the project manager.
1. Grading and Erosion Control Plan
2. Prelim/Final Drainage Report
3. Site Development Plan
10/12/2017 3:22:27 PM
PCD Engineering Division
10/12/2017 2:29:22 PM
Submit a standalone street construction plan set for the proposed modification to Space Village Ave.

Contact CDOT and the City of Colorado Springs regarding their submittal requirements for the off-site improvements proposed to Peterson Road and US-24 off-ramps.

The site plan will not be approved until these off-site improvements are approved.
10/12/2017 2:29:22 PM
PCD Engineering Division
10/12/2017 2:23:16 PM
Submit a completed Financial Assurance Estimate Form. Contact staff for a copy of the FAE excel spreadsheet. 10/12/2017 2:23:16 PM
View PCD Engineering Division
10/12/2017 2:21:09 PM
Submit a completed Pond Maintenance Agreement. The attached standard template is for a facility that is maintained by the owner.

If the pond is to be owned/maintained by an HOA or a Metro District then notify staff so we can forward the appropriate template.
10/12/2017 2:21:09 PM
PCD Engineering Division
10/12/2017 2:12:43 PM
Submit the following documents for review:
1. SWMP Report. See Appendix E of the ECM for the checklist.
2. Operations and Maintenance Manual for the underground detention facility.
10/12/2017 2:12:43 PM
Cherokee Metro Dist
10/6/2017 7:57:47 AM
Developer is currently going through the District's development process. 10/6/2017 7:57:47 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/3/2017 1:56:38 PM
Gabe, attached is the first review memo for the subject application.

Thank You

Mike Gackle
Utilities Development Services
719-668-8262
10/3/2017 1:56:38 PM
PCD Engineering Division
10/2/2017 3:44:10 PM
Provide a confirmation that the underground water quality and detention facility met the requirements of the Colorado Division of Water Resources for groundwater injection. 10/2/2017 3:44:10 PM
View PCD Engineering Division
10/2/2017 3:41:05 PM
Upload the SDI Worksheet and the completed EPC MS4 Post Construction form with the Site Development Plan application.
Attached is the EPC MS4 Post Construction form.
10/2/2017 3:41:05 PM